05000316/LER-1985-031-01, :on 851027,ESF Actuated as Result of Lower Containment Airborne Monitor Particulate Channel Train a High Alarm.Caused by Monitors Trending Upward.Setpoints Readjusted

From kanterella
Revision as of 23:50, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
:on 851027,ESF Actuated as Result of Lower Containment Airborne Monitor Particulate Channel Train a High Alarm.Caused by Monitors Trending Upward.Setpoints Readjusted
ML20137E696
Person / Time
Site: Cook 
Issue date: 11/21/1985
From: Kriesel T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML20137E676 List:
References
LER-85-031-01, LER-85-31-1, NUDOCS 8511270295
Download: ML20137E696 (1)


LER-1985-031, on 851027,ESF Actuated as Result of Lower Containment Airborne Monitor Particulate Channel Train a High Alarm.Caused by Monitors Trending Upward.Setpoints Readjusted
Event date:
Report date:
3161985031R01 - NRC Website

text

r 4

NRO Form 366 U.S. NUCLEA3 EEIULATOAV COMMISSION APPROVED OMS NO.31110-4104 g

E m :ES s,oise LICENSEE EVENT REPORT (LER)

FACILaTV NAME (1)

DOCKE1 MBER (2)

PAGE13p DONALD C. COOK NUCLEAR PLANT UNIT 2 0 i5 ] 0 l 0 l 0131116 1 lOFl011 TITLE (4)

ESF ACTUATION EVENT DATE (5)

LER NUMSER (6)

REPORT DATE &

OTHER F ACILITIES INVOLVED (S)

MONTH DAY YEAR YEAR

%Q

y,Q MONTH OAY DEAR F ACIUTY NAMES DOCKET NUM8ER(Sp 015101010 I I i 1l0 2l 7 85 8l5 0l3l1 0l 0 1l 1 2l1 8l5 oisiogoio, i i THIS REPORT IS SUOMITTED PURSUANT TO THE REQUMEMENTS OF 10 CFR l: Ich.c* ene or more e, rh.,o#ewegl (11)

OPERATING EE l

20.402M 20.405(e)

]

60.734eH2Htes 73.71(bl 20.405(eH1HG 50.3s(sH1) 50.73teH2Het 73.711el R

50.73(aH2Hvu)

Abs 11 0) l l 20.406(aH1Hal OTHER 50.deH2) 20.405(aH1HE) 50.73(eH2HL) 50.73(aH2HvWHA)

J66Al 20.406hH1Hiv) 50.73(aK2HE)

N.'31sH2HyulHBl 80.73(shInttak 20.406(eH1Hvl 60.73(eH2Hiu)

LICENSEE CONTACT POR THl3 LIR 412)

T. A. KRIESEL - TECHNICAL PHYSICAL SCIENCES

,,,,,co, F " "

DEPARTMENT SUPERINTENDENT S 9; 0; 1 61,6 4, e.,j S i

i i

j COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRISED IN THIS REPORT (13)

M AG RE RTA LE

%g

CAUSE

SYSTEM COMPONENT

CAUSE

SYSTEM COMPONENT T E T

PR S y

pp g w

?:[3 l

l l l l l l l

l l l l l l I

I I I I I I I

I I I I I I f C.Tn DAY YEAR SUPPLEMENTAL REPORT EXPECTED (141 M ?~

^) vE$ ur P wacreo suaa,ss,0,, oA r<>

3 NO A.Sm ACT a-M, o -. -

..,.,~. -,.- n.,

ON OCTOBER 27, 1985 AT 1910' HOURS WITH THE REACTOR COOLANT SYSTEM IN MODE 1 (OPERATING) AT 29 PERCENT REACTOR THERMAL POWER, ERS-2301 THE LOWER CONTAINMENT AIRBORNE MONITOR PARTICULATE CHANNEL TRAIN A (IEEE/ MON) HIGH ALARMED.

THE HIGH ALARM RESULTED IN AN ESF ACTUATION WHICH WOULD HAVE RESULTED IN AN ISOLATION OF THE CONTAINMENT PURGE SYSTEM HAD THE CONTAINMENT PURGE SYSTEM BEEN IN SERVICE.

DURING THE TIME OF THE EVENT THE MONITORS HAD BEEN TRENDING UPWARD.

RADIATION PROTECTION WAS AWARE OF THE INCREASING TREND AND WERE IN THE PROCESS OF CALCULATING A NEW HIGH ALARM SETPOINT BUT WAS NOT ABLE TO GET THE NEW SETPOINT CALCULATED IN TIME TO PREVENT THE HIGH ALARM.

THE MONITORS WERE FUNCTIONING AS DESiJNED BY TRENDING THE INCREASING RADIATION LEVELS IN CONTAINMENT AT THE TIME OF THE EVENT.

THE HIGH ALARM SETPOINT AND ALERT ALARM SETPOINT WERE READJUSTED TO MORE ADEQUATELY REFLECT THE BACKGROUND RADIATION LEVELS IN THE CONTAINMENT.

THE HEALTH AND SAFETY OF THE PUBLIC WERE NOT AFFECTED.

8511270295 851121 N

PDR ADOCK 05000316

\\,I S

PDR 5"4E"" "

e u.s.epo:teneomeminarse