Title | Failure of Reactor Building Isolation Dampers to Isolate |
Event Description | On January 16, 2017, with the reactor at 100 percent and the mode switch in RUN, Pilgrim Station was performing preventative maintenance of secondary containment isolation dampers when dampers AO-N-82 and AO-N-83, refueling floor supply isolation dampers, failed to fully close when the control switches were taken to close.
This 8-hour non-emergency notification is being made in accordance with 10 CFR 50.72(b)(3)(v), Any event or condition that at the time discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to: (C) Control the release of radioactive material; or (D) Mitigate the consequences of an accident. The reactor building isolation dampers were cleaned and lubricated and post-work tested and timed in accordance with station procedures to verify that they had satisfactory closing times. Pilgrim Nuclear Power Station has returned the dampers to Operable status. The licensee will notify the Commonwealth of Massachusetts. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-0.27 h-0.0113 days <br />-0.00161 weeks <br />-3.69846e-4 months <br />) | |
Opened: | Michael Mcdonnell 16:39 Jan 16, 2017 |
NRC Officer: | Steven Vitto |
Last Updated: | Jan 16, 2017 |
52492 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52492\u003C/a\u003E - \u003Ca href=\"/Pilgrim\" title=\"Pilgrim\"\u003EPilgrim\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EFailure of Reactor Building Isolation Dampers to Isolate\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52492 - Pilgrim\n","link":"","lat":41.942861111111114,"lon":-70.57673055555556,"icon":""}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52492&oldid=420706"