05000423/LER-1997-006-01, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1

From kanterella
Revision as of 19:05, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1
ML20138J489
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/30/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138J492 List:
References
B16379, NUDOCS 9705080232
Download: ML20138J489 (5)


LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
4231997006R01 - NRC Website

text

._.. _

} Northeast

""I" F"'T "d d"""'" *')' *"'"'"'dd "f'

jk},

Nuclear Energy uaisione Nocie., ro.y sisiion Northeast Nuclear Energy Conipany P.O. Ilus 128 Waterford, Ur 0638.5-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitica Systern April 30,1997 Docket No. 50-423 B16379 Re:10CFR 50.73(a)(2)(i)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-006-01 Submitted Pursuant to 10CFR 50.73(a)(2)(i)

This letter forwards Supplement 1 to Licensee' Event Report 97-006-00, documenting a condition that was determined at Millstone Unit No. 3 on January i

17,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

)

l James M. Peschel at (860) 437-5840.

l r

l Very truly yours, i

NORTHEAST NUCLEAR ENERGY nn0030 COMPANY 9705000232 970430 "5

e

{DR ADOCK 05000423-i m PDR N

A

% /

\\

fM g

9 I

Unit Director, Millstone Unit No. 3 y

%,h}hh Os34224 REV 124 a

I

. U.S. Nuclear Regulatory Commission B16379/Page 2 I

l Attachment: 1)

NNECO's commitments in response to LER 97-006-01 i

2)

LER 97-006-01 t

cc:

F _ J.

Miller, Region i Administrator l

A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects

' I.

i i

i

!i i

h f

e l'

I i

i I

I l

i l

t I

i t

i t

i I

t I

l I

t t

t l

i l

i t

I t

l i

I i

h Dacket No. 50-423

[

B16379 l

i t

I t

i

+

i i

t i

Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To 1

(LER 97-006 01) l i

l i

i i

l l

l 1

l

\\

I I

l l

l April 30,1997 1

1

+

l

'U.S. Nuclaar Reguintory Commission i

B16379\\ Attachment 1\\Page 1 h

I Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Any other actions discussed in the submittal represent intended or pisoned actions by NNECO.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Manager -

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions l

regarding this document or any associated regulatory commitments.

Number

Commitment

Due j

B16379-01 A Technical Specification Change-May 30,1997 Request will be submitted to add the RHR l

Suction CIVs to the list of valves included l

in the note contained within Surveillance Requirement 4.6.1.1.a.

i i

l I

I e

i j

Docket No. 50-423 816379 1

i I

i

~

i

.i l-i-

Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of i

(LER 97-006-01) i i

l l

l

{

t i

f i

l April 30,1997 1