ML20140C565
| ML20140C565 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/02/1984 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20140C515 | List: |
| References | |
| NUDOCS 8406190382 | |
| Download: ML20140C565 (2) | |
See also: IR 05000413/1984036
Text
u ~
g
^
-
y
MY
2 1984
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NOS. 50-413/84-36 AND 50-414/84-20
On April 3 - 6, 1984, NRC inspected activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for. your Catawba facility.
At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during'the inspection are identified in the report. Within these
. areas, the inspection consisted of selective examinations of procedures and
- representative records, interviews with personnel, and observation of activities
in progress.
- The inspection revealed no violations of NRC requirements.
However, certain
activities having safety significance appeared to deviate from a commitment to
' the NRC.
The deviations and elements to be included in your response are
presented in the enclosed Notice of Deviation.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply.
If you wish to withhold information contained therein,
please notify .this office by telephone and include a written application to
withhold information in your response. Such application must be consistent with
the requirements of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
,
Sincerely,
Hugh C. Dance, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosures:
(See page 2)
8406190382 840611
PDR ADDCK 05000413
O
L.
.
,,
a
'
'
.
_,_
N
2 198;
' Duke Power Company
2
'
-Enclosures:
1.
Notice of Deviation
2.
Inspection Report Nos. 50-413/84-36
and 50-414/84-20
cc w/encls:
R. L. Dick, Vice President - Construction
J. W.-Hampton, Station Manager
bec w/encis:
NRC Resident Inspector
' Document Control Desk
State of South Carolina
K. Jabbour, NRR/LB #4
-L. Whitney, IE
'
IE, Division of QA, Safeguards and-
Inspection Programs
NRR, Division of Licensing
.
)
'
,
5
RI
RII
RI
RII
RII
RII
/g.
kHerdt
J
kett
A01shinski H
ce
WHMi
r:sa
GRWiseman
TEConlon
04/ p/84
/
04/p/84
./[/84
4/gp/84
4p/g8d
7
04/p/84
04/q%/84
f
7