Text

,a

, ;,:n '

  • ll 4

DUKE POWER GOMPANY P.O. DOx G3180 CHAMLOTTE. N.C. 28242 HALB. TUCKER TELEPflOME May 31, 1984' Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission-Region II

-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303- ,

Re: RII:WHM/GRW 50-413/84-36 -

Dear Mr. O'Reilly:

Please find attached a response to Deviation No. 413/84-36-04, as identified in the above referenced inspection report. Duke Power Company does not '

consider any information contained in this inspection report to be proprietary.

Very.truly yours, t

Yb Hal B. Tucker f,g/ ,

LTP/php.

Attachment cc: NRC Resident Inspector i Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law l P. O.-Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21353 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 i

~

j 8406190380 840611 PDR ADOCK 05000413

'~

G PDR

f ..*

E Response to Deviation 413/84-36-04 .

Corrective Actions In Duke's letter of. April '14, 1983 to. the NRC/NRR, it' was stated that in . each Reactor Building there are two (2) 150 lb. hydrogen cylinders and associated piping which provides a gas blanket for Reactor Coolant ,

?

Pump drain tanks. .The subject cylinders have been relocated to the hydrogen. shed in the plant yard (Ref: letter of clarification dated April-25, 1984.). An' excess flow valve will be provided in the discharge piping at the' hydrogen shed. flechanical systems will review pipe routing to assure that if non-seismic pipe were to fail, concentration of hydro-gen in the area would be below 2%. This complies with the Standard .

Review Plan. Also, a pressure test of this QA Condition 3 piping does

. not require QA inspection.

Status Full compliance to be achieved prior to Fuel Load. ,

s f'

ll 9