ML20195G329
| ML20195G329 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/15/1988 |
| From: | Mckee P NRC OFFICE OF SPECIAL PROJECTS |
| To: | Charemagne Grimes NRC OFFICE OF SPECIAL PROJECTS |
| Shared Package | |
| ML20195G199 | List: |
| References | |
| FOIA-88-322 NUDOCS 8811230348 | |
| Download: ML20195G329 (1) | |
Text
_ __ _ _ _ _ _ _ _
March 15, 1988 I
MENORANDUM FOR: Christopher '. Grimes, Director Comanche Pea., Project Division. OSP FROM:
Phillip F. McKee, Deputy Director Comanche Peak Prtgect Division. OSP
SUBJECT:
CLOSURE OF CPRRG RECOMMENDATION 69 The subject recomendation resulted from a sf stement mado in NUREG-1257, Appendix B. Section 1.7.9, Recomendations Regarding NRC Guidance. The statement was:
"Consideration should be given to simplifying NC 0400 and MC 0610 regarding how to develop and document violations of 10 CFR 50, Appendix B Critoria. The need to evaluate ufety significance and all pertinent aspects of the licensee's quality assurance program may need to be emphasized."
OSP was tasked with addressing the last part of this recomendation.
The recomendation appites to staff assigned to do inspections at Comanche Peak and reans that inspectors should give careful consideration to the safety significance of an issue when pursuing and documenting noncompliances with 10 CFR Part 50, Appendix B.
Since the assignment of Bob Warnick as Assistant Director for Reactor Programs last sumer, Bob has repeatedly emphasized this point during his review of
- nspection reports and weekly staff briefings. Bob has also discussed with the site staff the recently issued (December 1987) NRC Inspection Manual Chapter 0610. "Inspection Reports." These actions, as well as the several meetings held at tne site between senior CSP ransgemcnt and site
- taff, have clearly satisfied this recomendation.
On this basis, I have instructed Bob Warnick to identify the status of CPRRG recomendation 69 as complete.
Original signed by Phillip F. McKee, Deputy Director Comanche Peak Troject Division Office of Special Projects cc: R. Warnick Distribution:
IPPD Reading File OSP Reading File P. McKee 8811230340 881108 PDR FOIA CONDITB8-322 PDR OfC :CP dP p.....:............:............:............:............:.......,,-.:...........
NAME :PW ee:cb I
h
.....:.4..........:............:............:............:............:............:.......t....[
/\\{ \\
DATE23/lN88 gs i
0FFICIAL RECORD COPY l
< uo
.... 30, UNITED STATES Q
/
i NUCLEAR REGULATORY COMMISSION
{.
l wassiNotos. o. c. rosss
$@$OY$ Y
- d. arch 15, 1988 WRI81988
.U J.9 MEMORANDUM FOR:
Christopher I. Grimes, Director Comanche Peak Project Division, OSP FROM:
Philli) F. McKee, Deputy Director Comancie Peak Project Division, OSP
SUBJECT:
CLOSURE OF CPRRG RECOMMENDATION 69 The subjest recomendation resulted from a statement made in NUREG-1257, Appendix 8. Section 1.7.9, Recomendations Regarding NRC Guitlance.
The statement was:
"Consideration should be given to simplifying MC 0400 and MC 0610 regarding how to develop and document violnions of 10 CFR 50, Appendix P Criteria.
The need to evaluatt safety significance and all pertinent aspects of the licensee's quality assurance program may need to be emphasized."
OSP was tasked with addressing the last part of this recorrendation.
The recomendation applies to staff assigned to do inspections at Comanche Peak and means that inspectors should give careful consideration to the safety significance of an issue when pursuing and documenting noncompliances with 10 CFR Part 50, Appendix B.
Sfnce the assignment of Bob Warnick as Assistant Director for Reactor Programs last sumer, Bob has repeatedly emphasized this point during his review of inspection reports and weekly staff briefings. Bob has also discussed with the site staff the recently issued (December 1987) NRC Inspection Manual Chapter 0610. "Inspection Reports." These actions, as well as the several meetings held at tie site between senior OSP management and site staff, have clearly satisfied this recomendation. On this basis, I have instructed Bob Warnick to identify the status of CPRRG recomendation 69 as complete.
h,e k
Phillip F./McKee, Deputy Director Comanche Peak Project Division Office of Special Projects I
cc: R. Warnick D
C
. -gs inn (y
- - - - -