February 13, 1998
SUBJECT:
NRC INSPECTION REPORT NOS. 50-325/97 '
.10 50-324/97-12
Dear Mr. Hinnant:
,
Thank you for your response of January 7,1998, to our Notice of Violation-issued on December 8, 1997, concerning activities conducted at your Brunswick
,
,
facility. We have examined your response and found that it meets the
'
requirements of 10 CFR 2.201.
In your response, you admitted Violations A-D and denied Violation E.
>
After careful consideration of the basis for your denial of Violation E, we
'have concluded.-for the reasons presented in the ^nclosure to this letter,
,
that the violation occurred as stated in'the Notice of Violation. Therefore, in accordance with 10 CFR 2.201(a) please submit to this office within 30 days of the date of this letter a written statement describing steps which have been taken to correct Violation E and the results achieved, corrective
'
steps which will be taken to avoid further violations, and the date when full
-
compliance will be achieved.
We will examine the implementation of your actions to correct Violations A-D
during future-inspections.
We appreciate your cooperation.in this matter.
Sincerely
.
( Original signed by B. Mallett )
Bruce-S. Mallett Deputy Regional Administrator Docket Nos. 50-323 50-324 License Nos. 'DPR-71. DPR-62 Er.alosure:
Evaluat' ns and Conclusions c
cc w/ encl: _'(Seepage 2)l E ADS $ o E S2
-
G PDR t
8'b
,
__
_
--
.-
_ _ _ _
...
-
.
._.
.-
-
.
.
.
cc w/ enc 1:
Director Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 J. J. Lyash, Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport. NC 28461 D. B. Alexander. Manager Performance Evaluation and
-.atory Affairs OHS 7 Carolina Power & Light Company 412 S. Wilmington Street Raleigh. NC 27601 K. R. Jury, Manager Regulatory Affairs Carolina Power & Light Company Brunswick Steam Electric Plant
'
P. O. Box 10429 Southport. NC 28461-0429 Wtiliam D. Johnson Vice President & Senior Counsel Carolina Power and Light Company P. O. Box-1551 Raleigh, NC 27602 Mel Fry, Acting Director Division of_ Radiation Protection N.~C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh NC 27609-7721 Karen E. Long-Assistant Attorney General State of North Carolina P, 0. Box 629 Raleigh. NC 27602 (cc w/ encl-cont'd - See page 3)
,
.
-
. - -... _ _.
.
.
(cc w/ encl cont'd)
Robert P. Gruber Executive Director Public Staff NCUC P. O. Box 29520 Raleigh NC 27626 0520 Public Service Commission State of South Carolina P. O. Box 11649 Columbia. SC 29211 Jerry W. Jones. Chairman Brunswick County Board of Commissioners P. O. Box 249 Bolivia. NC 28422 Dan E. Summers Emergency Management Coordinator New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402 William H. Crowe. Mayor City of Southport 201 E. Moore Street Southpor+, NC 28461 Distribution w/ encl:
M. Shymlock Rll D. Trimble. NRR J. Lieberman. OE B. Summers. OE J. Colev RII R. Aiello. RII-
'J. Lenahan. RII
,
E. Testa. RII
-
D. Thompson RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Conrission 8470 River Road. SE Southport NC 28461-
,
ik '.i
- 'See previous concurrence 0*
b Ur t t CE -
Wil:DNP Ell:DEP 211:DRP Ril:DRP Ril:EICS Ril:DRP D J)[:N Ibbh
_
umK rE5 ream
'C9etterson
"tElecDonald
"N5hyistock
"ABe, Land
"JJohnson_ gifTho@ son DATE Z/
/95 Z/
/95 2/
/90 2/
/95 -
2/
/95 2/
/95 Z/ G /95
,
Lurir YE5 ND YE5 ED YE5 ND YE5 ND YE5 ND YES NO YE5 NO l
0FFICIAL REOMD COPf DDrtsEmi umpE: G:\\gau\\9712DENI.917
..
.. - - -
_
. -.
.
-
.
[
(cc w/enci cont'd)
Robert P. Gruber
/
Exec. tive Director
/
Public Staff NCUC P. O. Box 29520 Raleigh. NC 27626-0520 Public Service Commission
.
State of South Carolina-
P. O. Box 11649 Columbia, SC 29211 Jerry W. Jones Chairman Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Dan E. Summers Emergency Management Coordinator New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402 William H. Crowe, Mayor City of Southport 201 E. Moore Street Southport. NC 28461 Distribution w/ encl:
M. Shymlock, Ril D. Trimble, NRR J. Lieberman OE B. Summers. OE J. Coley, RII'
R. Aiello, RII J. Lenahan RII E. Testa, RII D. Thompson, RII PUBLIC NRC Resident Inspector U.- S. Nuclear Re'gulatory Commission-8470 River Road. SE Southport. NC-28461
- See previous concurrence UFFICE RII DRP Ell:1N RII:DRP Ril:DRP Ril:CICS
,, gy
,
51mTM gQ
,
. MfWE
"EBream
"CPetterscri EL ld
,unyieloc*
"A5oland
,'
DATE-2/
/95 2/
/95 2/
/95 2/
/95 2/
/95 2/ U
/95 7/
/95 wri r TE5 ED TE5 E
TEE
.L9 TE5 ND TES ND TES 11 0 TE5 NO OFFICIAL. RECORD COPY DOCL5ENT NAME: Ga\\RPS4%BRU\\9712DENI.917
-
-
-
-
.- -.
.
-
-
.
(cc w/ enc 1 cont'd)
Robert P. Gruber Executive Director Public Staff NCUC P. O. Box 295c0 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. O. Box 11649 Columbia. SC 29211 Jerry W. Jones. Chairman Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Dan E. Summers Emergency Management Coordinator New Hanover County Department of Emergency Management P. J. Box 1525 Wilmington, NC 28402 William H. Crowe, Mayor City of Southport 201 E. Moore Street Southport, NC 28461 Oh Distribution w/ encl:
Md. bg gi %
Wb M. Shymlock, RII D. Trimole. NRR j
J. Coley, RII R. Aiello. RII J. Lenahan RII E. Testa. RII D. Thompson. RII PUBLIC NRC Resident Insp ctor U. S. Nuclear Re ulatory Commission n,
8470 River Road SE V
28461
Southport. NC j j
g
- See previou concurrence UFFICE RII DRP Ell:DRP Ril'_DRP Ell:DRP pg
' ' ""E
wr (/ IR )
,
NAK liBream CPatterson 134ecDonald N5hyur16ck g
'
DATE 1/
/95-1/
/95 1/
/95 1/ p(J /95
' p /95 1/
/95 1/
/95 (IFY7 YE5 N0 YE5 ND YE5 NO YE5 NO (YE5 j NO YE5 NO YES NO
/
OFFICIAL RECORD COPY DOCISIEdI MAE : G:\\BRU\\9712DEh!,917
\\,/
j
..
_. _.
.
. _ _ _ _ _
_
__ _. _.
.. _ _.. _... _ _. _ _ _ _ _. _ _ _ _.. _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _
_
Jf44-29-1990 10:34 tRC BRUISJ!CK 19104379134 P.01
.
/
!
CPR i
(CC W/enCI cont'd)
Robert P. Gruber
Executive Director Public Staff NCUC i
i P. O. Box 29520
Raleigh NC 27626-0520 t
Public Service Comission d
l State of South Carolin-P. O. Box 11649 Coluncia. SC 29211
,
Jerry W. Jones. Cha an rd of Brunswick County /
Comissioners F. O. Box 249
/
Bolivia. NC
'
Den E. Sume Emergency Man gement Coordinator New Hanover nty Department of Emergene nap
'
P. O. kx
.'
Wtimingt NC 28402
,
,
W1:11am. Crowe, Mayor
'
C1ty of outhport
201 E.
re Street Sout
. NC 28461
,
31Staihutim Wunc1; i
(, 5 tymioc t. IL
,
D. Tflable. NRR J.
oley, RIl R.
tello, RII J..enahan, Ril
"
E. Testa. RII-
.
D Thompson, RII LIC
,
! Resident Inspector
,
u. S. Nuclear Regulatory Comission 8470 River Road. SE Southport, NC 28461
.
Sh f
,m i
853545W
"_ ;
",,, O
.4 -
u-v
-
v w.,.
IE C ;iiigpage,= =.infahmihr
"_
"
""
,
TOTAL P.01
.
.
..
_
__
.
_
_
.
.. _. _
. _ _ _ _ _ _ _
.
.
.. _ _. _
'
w EVALUATIONS AND CONCLUSION
,
On December 8, 1998, a Notice of Violation (Notice) was issued for five violations identified during a routine NRC inspection.
Carolina Power & Light Company (CP&L) responded to the Notice on January 7. 1998.
The licensee admitted Violations A-0. but denied Violation E on the bases that the
established procedural. controls, training, and qualifications of the security personnel monitoring the Central Access Point at the time of the events were adequate to detect unauthorized access into the protected area (PA).
The NRC's evaluations and conclusion regarding the licensee's arguments are as
follows:
Restatement of Violation Technical Specification 6.8.1.d requires that written procedures shall be established. implemented, and maintained covering implementation of the Security Plan.
Physical Security Plan. Revision 1. August 1997, states that a Member of the Security Force (MSF) located within a bullet resistant structure is responsible for the final access control function.
Security Instruction. 0S1-05 Security Post Duties. Responsibilities and Patrol Procedures, defines the responsibilities of the Access Control Person (ACP).
.
Contrary to the above, 0S1-05 failed to adequately define those actions required for the ACP to control the final access function into the protected area to prevent unauthorized access.
Specifically. no guidance existed for controlling a condition on October 3 and again on Octobar 7, 1997 wherein the ACr> failed to lock down the Protected Area turnstiles or remove the second individual from the area during a conditio1 which could have allowed an
,
unauthorized individual to gain access into the PA.
Summary of Licensee's Pesconse to Violation E The licensee contends that the procedural controls training, and qualifications of the security personnel monitoring the Central Access Point
(CAP) at the time of the events were adequate to detect unauthorized access
'
into the protected area, and that the security personnel would have responded had an attempt been made.
The licensee indicated that the procedures controlling the CAP adequately defined the Final Access Control (FAC)
operator's responsibility in the event an unauthorized individual attem)ted to gain access.
The licensee interviewed the responsible FAC operators, w1o
-
attested that had an individual attempted to gain unauthorized access they would have locked the full-length turnstiles or requested response from other MSF. The licensee also credits training provided in November 1996 as addressing the locking of the full-length turnstile when two individuals were located between the half-length and full-length turnstiles.
Enclosure
.
..
_
.
--
.
.
- - - -
.
.
-
- - - - - - - - -. -
-
-.
,
.
o i
'
NRC Evaluation of Licensee's Resoonse The NRC staff has carefully reviewed the licensee's response and determined that the procedural requirements did not provide adeguate guidance for the
'
situation observed to prevent unauthorized acces3.
Therefore, the Uritten procedure OSI-5 did not adequately implement this Security Plan access control function.
The licensee's response did not provide any additional information that changed the significance or validity of the violation.
The licensee maintains that the procedures were adequate and the FAC operators acted in accordance with those procedures and training provided concerning this type situation.. The NRC does agree that the personnel serving as FAC
'
operators were qualified to man that station, that training describing this situation was provided in November 1996, and that 0S1-05 discusses the responsibility of PA access control to the FAC operator.
However 031-05 did
,
not contain actions for the FAC operator to intervene when more that one
'
i individual was in the area between the full-length and the half-length turnstiles.
In addition, the training provided was prior to the completion and site-wide utilizaticn of the Central Access Point in August 1997 and did not address this situation for the different configuration of the new access building, Therefore, considering the failure to address the configuration change during training and by observations of the situation on October 3, and
7.- 1997 the inspector determined the training provided and procedure were not adequate to address this event.
NRC's review of the subsequent licensee's root cause analysis, the procedure revised as a result of the situation identified, and the PNSC meeting notes, support a finding that the procedural controls and training at the time of the
'
event were inadequate.
The licensee's Root Cause Condition Report 97-3964.
Plant Access Turnsti a Area, dated January 6, 1998, for this event stated that
,
'the one-half turnsta ies were introduced to enhance access control: however, this process change was not formally documented in plant procedures Security personnel instructions or site personnel training guides.
Failure to update these documents prior to introducing the onc-half turnstiles resulted in plant
personnel not understanding management ex3ectations." The corrective actions
reviewed by the NRC do not support that t1e procedures or training were.
edequate.
Corrective actions for this event included revision of the FAC operators lesson plan.and additional training on that plan, revision to 051-05, and an evaluation of the need to change the Initial / Retraining program E
to incorporate instructions for half-length turnstiles in the Central Access Building.. A review of OSI-05 revised January 1998 added unauthorized access
'to those situations required for FAC operator action.
Additionally, the Root c
Cause investigator when questioned by the Brunswick Plant Nuclear Safety Committee-(PNSC) during the December 18, 1997 meeting stated, as recorded in the PNSC minutes, that the security guards actions were not "what they were supposed to have done-their training had not been adequate to have them-control the situation in the right way."
Enclosure
-
_
-
-.
.
.
-
.- -
. - - -
.
. -
- -
-
-=
. -.-..
- -. -
,.
.
The violation was issued based on inadequacies in a security procedure as evidenced by observed security personnel performance.
The NRC is in agreement with the licensee that no attempt at unauthorized access was made hv the individuals observed.
The security force had the responsibility tv determine the individuals authorization prior to the individuals gaining access to the facility, when confronted with two individuals inappropriately between the half-length turnstiles and the full-length turnstiles as required by Technical Specification 6.8.1 of the Security Plan. The NRC ins)ection observed that neither the applicable procedure nor the training on tie procedure adequately addressed the actual situation where two individuals were between the turnstiles. Therefore, the NRC has determined that procedural controls were not adequate to implement the Security Plan when two individuals were in the area between the half-length and full-length turnstiles.
NRC Conclusion For the above reasons, the NRC staff concludes that ',ae violation occurred as stated.
!
Enclosure
..