ML20212J407
ML20212J407 | |
Person / Time | |
---|---|
Issue date: | 07/28/1998 |
From: | Webber R NRC |
To: | Cunninghan E NRC |
Shared Package | |
ML20212J316 | List: |
References | |
FOIA-99-341 NUDOCS 9910050138 | |
Download: ML20212J407 (1) | |
Text
f
- l. ;
i From Robert Webber To:
EMC3 7/28/98 3iO5pm Date:
ENGINEERING REQUIREMENT
Subject:
-Elinor:
I spoke with Lou and James.regarding the requirement to inspect
'the marble exterior surface of OWFN.
Lou mentioned that there is
.already-an accepted procedure for inspection, therefore, we can delete the existing requirement-(for designing a procedure) from your-SOW.
James will delete this requirement, amend the.IGCE and transmit the revised documents to you by tomorrow.
We can contract through GSA directly with GNM Associates, a-firm I am using for a' project for the OWFN Entrance Extension.
We need to get a delegation for contractual authority from Nydia Coleman, GSA Contracting Officer, once we get the revised documents.
Bob CC:
MHM1,.LX F, JRH1
- , U
'/q, t:
,r.k W p G y
\\
p.
k
,'l L fy j
Y v
-~., mh}Q
~
0#
1 9910050138 990928 O
.c((m 0 @ @
.