Informs That R Webber Spoke with Lou & James Re Engineering Requirement to Inspect Marble Exterior Surface of OWFN
ML20212J407
Person / Time
Issue date: 07/28/1998
From: Webber R
NRC
To: Cunninghan E
NRC
Shared Package
ML20212J316 List:
References
FOIA-99-341 NUDOCS 9910050138
Download: ML20212J407 (1)


Text

f

l. ;

i From Robert Webber To: EMC3 Date: .

7/28/98 3iO5pm

Subject:

ENGINEERING REQUIREMENT .

-Elinor:

I spoke with Lou and James.regarding the requirement to inspect

'the marble exterior surface of OWFN. Lou mentioned that there is

.already-an accepted procedure for inspection, therefore, we can delete the existing requirement-(for designing a procedure) from your-SOW. James will delete this requirement, amend the.IGCE and transmit the revised documents to you by tomorrow. We can contract through GSA directly with GNM Associates, a-firm I am using for a' project for the OWFN Entrance Extension. We need to get a delegation for contractual authority from Nydia Coleman, GSA Contracting Officer, once we get the revised documents.

Bob CC: MHM1, .LX F , JRH1