Category:Response to Request for Additional Information (RAI)
MONTHYEARCNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024
[Table view]Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 ML24004A0402024-01-0303 January 2024 Response to Nrc’S November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation ML23117A1162023-04-27027 April 2023 Response to Follow-up Questions to TVAs Response to NRCs Request for Supplemental Information (Rsi) Related to August 4, 2022, Sequoyah ISFSI Exemption Request CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 ML22353A0662022-12-19019 December 2022 Response to Request for Supplemental Information (D-RSI) Request for Exemption from Non-Destruction-Examination Compliance CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-21-024, Partial Response to Additional Request for Information Re Application to Revise Updated Final Safety Analysis Report Re Changes to Hydrologic Analysis (TS-19-02)2021-06-15015 June 2021 Partial Response to Additional Request for Information Re Application to Revise Updated Final Safety Analysis Report Re Changes to Hydrologic Analysis (TS-19-02) CNL-21-039, Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2021-05-0505 May 2021 Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-082, Partial Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (TS-19-02)2020-11-10010 November 2020 Partial Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (TS-19-02) CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-20-057, Tennessee Valley Authority - Application to Revise Sequoyah Nuclear Plant Units 1 & 2 Updated FSAR Changes to Hydrologic Analysis - Partial Response to Additional Request for Additional Information (TS-19-02)2020-08-12012 August 2020 Tennessee Valley Authority - Application to Revise Sequoyah Nuclear Plant Units 1 & 2 Updated FSAR Changes to Hydrologic Analysis - Partial Response to Additional Request for Additional Information (TS-19-02) ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request CNL-20-032, Response to Request for Additional Information (TS-19-02) Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis2020-05-14014 May 2020 Response to Request for Additional Information (TS-19-02) Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis CNL-20-026, Supplement to Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2020-02-18018 February 2020 Supplement to Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-19-119, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Unit 1 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-19019 November 2019 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Unit 1 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-061, Seismic Probabilistic Risk Assessment for Sequoyah Nuclear Plant, Units 1 and 2 - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task2019-10-18018 October 2019 Seismic Probabilistic Risk Assessment for Sequoyah Nuclear Plant, Units 1 and 2 - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Fo ML19231A2082019-08-19019 August 2019 Response to Request for Information Regarding Unit 2 Cycle 22 - 180-Day Steam Generator Tube Inspection Report CNL-19-068, Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for2019-07-22022 July 2019 Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for .. CNL-19-057, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISl-12019-06-19019 June 2019 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISl-1 CNL-19-002, Response to Request for Additional Information Regarding Application to Modify Sequoyah Nuclear Plant Units 1 and 2, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,.2019-03-21021 March 2019 Response to Request for Additional Information Regarding Application to Modify Sequoyah Nuclear Plant Units 1 and 2, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,. CNL-19-016, Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report2019-01-30030 January 2019 Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report CNL-18-089, Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-0342018-07-23023 July 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-034 NL-18-044, Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Pre2018-04-19019 April 2018 Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Prec CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation.2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation. CNL-17-063, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2017-10-26026 October 2017 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-17-104, Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-08-0707 August 2017 Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-27027 July 2017 Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-0707 July 2017 Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..2017-03-10010 March 2017 Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. CNL-16-194, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2016-12-23023 December 2016 Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-196, Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-12-19019 December 2016 Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-52016-07-28028 July 2016 Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information CNL-15-171, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional Information2015-09-11011 September 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional Information NL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.2015-08-0303 August 2015 Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor. CNL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.2015-08-0303 August 2015 Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor. CNL-15-146, Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482)2015-08-0303 August 2015 Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482) CNL-15-136, Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-072015-07-22022 July 2015 Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-07 ML15176A6792015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 ML15176A6812015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 ML15176A7482015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 8 of 8 2024-08-19 Category:Technical Specification MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023
[Table view]Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22145A1412022-05-16016 May 2022 Technical Specification Bases, Manual ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-072, Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03)2019-07-14014 July 2019 Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03) ML19151A5842019-05-31031 May 2019 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays ML17333A4012017-11-29029 November 2017 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-16-011, Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01)2016-03-11011 March 2016 Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01) CNL-15-128, Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 82015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 8 ML15176A6822015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 8 ML15176A6792015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 ML15176A7182015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 6 of 8 ML15176A6642015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 ML15176A7402015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 ML15176A7482015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 8 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 ML15176A6812015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 CNL-14-176, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03)2014-12-0202 December 2014 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) ML14342B0042014-12-0101 December 2014 Cycle 19 - 180-Day Steam Generator Tube Inspection Report ML13193A0392013-07-0505 July 2013 Revisions to the Technical Requirements Manual and Specification Bases ML11249A0612011-08-31031 August 2011 Application for Temporary Change to TS to Allow Use of Penetrations in Shield Building Dome During Modes 1 Through 4;and Request for Specific Usage of Alternate Source Term Methodology for Calculating Radiation Doses Associated. ML11195A1172011-07-29029 July 2011 Issuance of Amendments Regarding the Cyber Security Plan (TS-09-06) (TACs ME4955 and ME4956) ML11129A1882011-05-0606 May 2011 TS 11-06, Emergency Technical Specification Change for One-Time Extension of Surveillance Requirements Associated with Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation ML1014701582010-05-24024 May 2010 Revisions to Technical Requirements Manual and Technical Specification Bases ML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 ML0833701212008-12-0101 December 2008 Revisions to the Technical Requirements Manual (TRM) and Technical Specification (TS) Bases (Unit 1 Revisions 31, 32, and 33; Unit 2 Revisions 30, 31 and 32) ML0710101532007-04-0202 April 2007 Additional Information for Technical Specification Change 05-09 - Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Deletion of License Condition ML0702500312007-01-12012 January 2007 Technical Specification (TS) Change 06-06 - Revised Steam Generator (SG) Voltage-Based Repair Criteria - Probability of Prior Cycle Detection (Popcd) ML0634700292006-12-0707 December 2006 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes Supplemental Information ML0635302012006-11-30030 November 2006 Correction to Amendments Regarding Addition of Limiting Condition for Operation 3.0.7 on Inoperable Snubbers - Tech Specs Unit 2 - S118818 ML0635302082006-11-30030 November 2006 Correction to Amendments Regarding Addition of Limiting Condition for Operation 3.0.7 on Inoperable Snubbers - Unit 1 Tech Specs - S118819 ML0622300952006-08-0202 August 2006 Tech Spec Pages for Amendment 309 Regarding Changes to Cyclic and Transient Limits with Design Features Revision (TS 05-02) ML0622301112006-08-0202 August 2006 Tech Spec Pages for Amendment 298 Regarding Changes to Cyclic and Transient Limits with Design Features Revision (TS 05-02) ML0621401022006-07-12012 July 2006 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes 2023-09-20 Category:Bases Change MONTHYEARML23277A0462023-10-0404 October 2023
[Table view]Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML22145A1412022-05-16016 May 2022 Technical Specification Bases, Manual CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-19-072, Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03)2019-07-14014 July 2019 Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03) ML19151A5842019-05-31031 May 2019 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays ML17333A4012017-11-29029 November 2017 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-16-011, Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01)2016-03-11011 March 2016 Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01) ML15176A6812015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 8 NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 ML15176A6642015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 ML15176A6792015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 ML15176A7482015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 8 of 8 ML15176A7402015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 ML15176A6822015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 8 CNL-15-128, Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 82015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 8 ML15176A7182015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 6 of 8 CNL-14-176, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03)2014-12-0202 December 2014 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) ML14342B0042014-12-0101 December 2014 Cycle 19 - 180-Day Steam Generator Tube Inspection Report ML13193A0392013-07-0505 July 2013 Revisions to the Technical Requirements Manual and Specification Bases ML11249A0612011-08-31031 August 2011 Application for Temporary Change to TS to Allow Use of Penetrations in Shield Building Dome During Modes 1 Through 4;and Request for Specific Usage of Alternate Source Term Methodology for Calculating Radiation Doses Associated. ML1014701582010-05-24024 May 2010 Revisions to Technical Requirements Manual and Technical Specification Bases ML0833701212008-12-0101 December 2008 Revisions to the Technical Requirements Manual (TRM) and Technical Specification (TS) Bases (Unit 1 Revisions 31, 32, and 33; Unit 2 Revisions 30, 31 and 32) ML0710101532007-04-0202 April 2007 Additional Information for Technical Specification Change 05-09 - Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Deletion of License Condition ML0702500312007-01-12012 January 2007 Technical Specification (TS) Change 06-06 - Revised Steam Generator (SG) Voltage-Based Repair Criteria - Probability of Prior Cycle Detection (Popcd) ML0634700292006-12-0707 December 2006 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes Supplemental Information ML0621401022006-07-12012 July 2006 Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes ML0513102802005-04-27027 April 2005 Technical Specifications Change 04-06 - Relocation of Specifications in Accordance with Part 50.36 in Title 10 of the Code of Federal Regulations. ML0428600542004-09-30030 September 2004 Units 1 and 2 - Technical Specification Change No. 04-01 - New Specification for Loss of Power Instrumentation for Emergency Diesel Generator and Auxiliary Feedwater Actuation. ML0423804982004-08-12012 August 2004 Technical Specifications Change 03-11 Deletion of Vacuum Relief Flow Requirements from Auxiliary Building Gas Treatment System Surveillance Requirements L-87-009, Revisions to the Technical Requirements Manual (TRM) (Revisions 21, 22, 23, 24, 25, 26, and 27) and Technical Specification (TS) Bases (Unit 1 Revisions 22, 23, and 24; Unit 2 Revisions 22 and 23)2004-05-0505 May 2004 Revisions to the Technical Requirements Manual (TRM) (Revisions 21, 22, 23, 24, 25, 26, and 27) and Technical Specification (TS) Bases (Unit 1 Revisions 22, 23, and 24; Unit 2 Revisions 22 and 23) ML0407608862004-03-0505 March 2004 Technical Specifications (TS) Change 03-05, Physics Tests Exceptions and Refueling Operations. ML0330404062003-10-22022 October 2003 Technical Specification (TS) Change 03-12, Application for TS Improvement to Extend the Completion Time for Action a of TS 3/4.5.1, 'Accumulator,' Using the Consolidated Line Item Improvement Process (Cliip). ML0316108592003-06-0505 June 2003 TS Change No.03-08, Reactor Coolant System Heatup & Cooldown Curves ML0314903552003-05-19019 May 2003 Revised Information Regarding TS Change 02-07, One Time Frequency Extension for Type a Test Containment Integrated Leak Rate Test ML0313507612003-05-0909 May 2003 Tech Spec Change 01-09, Operations Involving Positive Reactivity Additions. ML0307902812003-03-13013 March 2003 TS Change 03-01, Revision of Boron Requirements for Cold Leg Accumulators & Refueling Water Storage Tanks ML0303401192003-01-29029 January 2003 Application for Technical Specification (TS) Change - Missed Surveillances Using the Consolidated Line Item Improvement Process (Revision 2) ML0229404772002-10-0404 October 2002 Seqouyah Units 1 & 2 Technical Specification (TS) Change No. 02-07, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt). ML0215504372002-05-0808 May 2002 Unit 2 - Supplemental Information to Support Emergency Technical Specification (TS) Change 02-05, Steam Generator (SG) Inspecton Scope - TAC MB4994 2023-10-04 |