ML16098A129
From kanterella
Revision as of 07:52, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML16098A129 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 03/23/2016 |
From: | Wamser C J Entergy Nuclear Vermont Yankee |
To: | Office of Nuclear Material Safety and Safeguards, State of VT, Dept of Environmental Conservation |
References | |
D008, D011, SVY 16-007 | |
Download: ML16098A129 (3) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:Drawing
MONTHYEARML16098A1292016-03-23023 March 2016
[Table view]Notification to State of Vermont of Disassembly and Demolition of the North Warehouse - Docket No. DPR-028 ML15266A4252015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191151, Rev 19, General Arrangement Radwaste Building Plans. ML15266A4442015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 1 ML15266A4432015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191161, Rev. 22, Flow Diagram, Maxe-up Water Treatment System. ML15266A4402015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 8 ML15266A4362015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 7 ML15266A4352015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 6 ML15266A4342015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 5 ML15266A4332015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 4 ML15266A4322015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 31, Flow Diagram Instrument Air System. Sheet 3 ML15266A4302015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 24, Flow Diagram Instrument Air System. Sheet 2 ML15266A4292015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 37, Flow Diagram Instrument Air System. Sheet 1 ML15266A4282015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 100, Flow Diagram Service Water System. Sheet 2 ML15266A4272015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 92, Flow Diagram Service Water System. Sheet 1 ML15266A4262015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191152, Rev. 14, General Arrangement Radwaste Building Section. ML15266A4452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 2 ML15266A4242015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191150, Rev. 20, General Arrangement Reactor Building Section. ML15266A4232015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191149, Rev. 27, General Arrangement Reactor Building Plans Sheet 2. ML15266A4222015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191148, Rev. 23, General Arrangement Reactor Building Plans Sheet 1. BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 2 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191161, Rev. 22, Flow Diagram, Maxe-up Water Treatment System.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191161, Rev. 22, Flow Diagram, Maxe-up Water Treatment System. BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 52015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 2 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 32015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 1 ML15267A6082015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 2 BVY 15-046, Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf.2015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf. ML15267A6612015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15267A6592015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 1 ML15267A6562015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15267A6542015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. ML15267A6512015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 2 ML15267A6492015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 ML15267A6472015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 3 ML15267A6452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 2 ML15267A6412015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191451, Circulating Water System Intake Structure-M, Sheet 1 ML15267A6112015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15267A6102015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 4 ML15267A6092015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 42015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 4 ML15267A6072015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6062015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15267A6052015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 30, 480V Aux. One Line Diagram Swgr BUS-9, MCC-9A, 9C. Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 32015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 2 2016-03-23 Category:Letter MONTHYEARBVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024
[Table view]Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report 2024-09-18 Category:Map MONTHYEARML16098A1292016-03-23023 March 2016
[Table view]Notification to State of Vermont of Disassembly and Demolition of the North Warehouse - Docket No. DPR-028 ML1020302892010-07-13013 July 2010 Map - Sit Map, Vermont Yankee ML1020304742010-03-15015 March 2010 Map - Groundwater Contour Plan, Figure 3 ML1021103762010-03-0202 March 2010 E-Mail from Noggle to Beissel, a Couple of VY Maps ML0701705182007-01-17017 January 2007 VYNPS - SEIS Web Reference - Roaring Brook Wildlife Management Area ML0636202042006-12-0505 December 2006 2006/12/05-E-Mail: VY License Renewal Application Amendment 22 - (PA) ML0629203522006-10-0303 October 2006 2006/10/03-(E-Mail) Vermont Yankee License Renewal ML0617700672006-05-25025 May 2006 VYNPS Land Use Map, Vegetation and Cover Type, Delineated Site Wetlands, and Riparian Zone ML0617404352006-05-25025 May 2006 Federal Facilities and Lands within 50 Miles of VYNPS ML0613002822006-05-10010 May 2006 2006/05/10- Request for Comments Concerning the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0613004802006-05-10010 May 2006 2006/05/10 - Request for Comments Concerning the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0613006842006-05-10010 May 2006 2006/05/10 - Request for Comments Concerning the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0613101442006-05-10010 May 2006 2006/05/10 - Request for Comments Concerning the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0613101332006-05-10010 May 2006 2006/05/10- Request for Comments Concerning the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0612801282006-05-0505 May 2006 2006/05/05- - Request for List of Protected Species within the Area Under Evaluation for the Vermont Yankee Nuclear Power Station License Renewal Application Review ML0521601342005-08-0202 August 2005 E-mail Ennis, NRR, to Wu, NRR, VY EPU Steam Dryer Audit ML0521601362005-08-0202 August 2005 E-Mail Gucwa, Entergy Nuclear Northeast, to Ennis, NRR, VY EPU Steam Dryer Audit ML0617303162005-06-0202 June 2005 VYNPS Wetlands Delineation Map ML0618703262005-04-0505 April 2005 VYNPS Sampling Maps 2004 Juvenile American Shad ML0617303122003-02-11011 February 2003 VYNPS Site Plan for Leachfields ML0617302902001-05-31031 May 2001 VYNPS NPDES Outfalls Map ML0617303132001-05-0101 May 2001 VYNPS Site Plan - Recognized Environmental Conditions ML0617303011994-02-0101 February 1994 VYNPS Map. Reference K: Oil/Hazmat Locations 2016-03-23 |