ML16111B291
From kanterella
Revision as of 07:36, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Similar Documents at LaSalle | |
---|---|
Category:Technical Specification
MONTHYEARML24103A2042024-04-12012 April 2024
[Table view]Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22332A4512022-11-10010 November 2022 Attachment 3 - Markup of Technical Specification Bases Pages (for Information Only) RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22111A2572022-04-13013 April 2022 Technical Specification Bases RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink2020-07-17017 July 2020 Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-20-029, Technical Specification Bases2020-04-13013 April 2020 Technical Specification Bases RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator2018-04-19019 April 2018 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-18-044, Revised Technical Specification Bases2018-04-11011 April 2018 Revised Technical Specification Bases RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-080, Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases2016-04-11011 April 2016 Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases RS-15-002, License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating2015-01-12012 January 2015 License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.2014-12-22022 December 2014 License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process RS-12-184, Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 152012-10-11011 October 2012 Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 15 RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages ML1003213072010-01-27027 January 2010 Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-08-132, Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 52008-10-23023 October 2008 Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 52008-10-23023 October 2008 LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im RS-08-045, Technical Specification Bases2008-04-14014 April 2008 Technical Specification Bases RS-07-165, License Amendment Request Regarding Spent Fuel Storage Pool Criticality2007-12-13013 December 2007 License Amendment Request Regarding Spent Fuel Storage Pool Criticality RS-07-069, Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink2007-06-29029 June 2007 Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process RS-07-034, Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection2007-04-0606 April 2007 Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report2006-12-15015 December 2006 Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program.2006-11-17017 November 2006 Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. RS-06-089, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power2006-08-16016 August 2006 Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power ML0504902692005-02-0404 February 2005 Request for Change to Technical Specifications Traversing In-core Probe (TIP) System ML0434900702004-12-10010 December 2004 Tech Spec Pages for License Amendments 170 & 156, Pressure-Temperature Limits RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-04-30030 April 2004 Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RS-03-079, Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing2003-05-19019 May 2003 Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.82003-04-18018 April 2003 Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 RS-03-040, Request for Amendment to Technical Specifications Section 5.7, High Radiation Area.2003-03-31031 March 2003 Request for Amendment to Technical Specifications Section 5.7, High Radiation Area. RS-03-029, Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation.2003-03-31031 March 2003 Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation. ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.2002-10-24024 October 2002 Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. RS-02-110, Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation.2002-07-0808 July 2002 Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation. RS-02-076, Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-122002-05-31031 May 2002 Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12 2024-04-12 Category:Bases Change MONTHYEARML22332A4512022-11-10010 November 2022
[Table view]Attachment 3 - Markup of Technical Specification Bases Pages (for Information Only) RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22111A2572022-04-13013 April 2022 Technical Specification Bases RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-029, Technical Specification Bases2020-04-13013 April 2020 Technical Specification Bases RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator2018-04-19019 April 2018 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-18-044, Revised Technical Specification Bases2018-04-11011 April 2018 Revised Technical Specification Bases RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-080, Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases2016-04-11011 April 2016 Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases RS-15-002, License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating2015-01-12012 January 2015 License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.2014-12-22022 December 2014 License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. ML1003213072010-01-27027 January 2010 Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-08-045, Technical Specification Bases2008-04-14014 April 2008 Technical Specification Bases RS-07-069, Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink2007-06-29029 June 2007 Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0504902692005-02-0404 February 2005 Request for Change to Technical Specifications Traversing In-core Probe (TIP) System RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.82003-04-18018 April 2003 Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 2022-04-13 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24108A1562024-04-15015 April 2024
[Table view]Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML22111A2462022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2532022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2302022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2342022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2392022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML22146A3812022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (ML22111A249 Redacted) ML22146A3792022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 7 of 7 (ML22111A245 Redacted) ML22146A3802022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (ML22111A248 Redacted) ML22146A3822022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Appendices (ML22111A254 Redacted) ML22111A2362022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22111A2502022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2472022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2282022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Letter and Attachments A-F ML22111A2522022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2512022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22111A2322022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2332022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22111A2292022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, List of Effective Pages ML22146A3682022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (ML22111A235 Redacted) ML22146A3782022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 6 of 7 (ML22111A244 Redacted) ML22146A3702022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System (ML22111A238 Redacted) ML22146A3692022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (ML22111A237 Redacted) ML22146A3732022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 2 of 7 (ML22111A240 Redacted) ML22146A3762022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 4 of 7 (ML22111A242 Redacted) ML22146A3742022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 3 of 7 (ML22111A241 Redacted) ML20153A7922020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 009 Chap 09 Auxiliary Systems-ML20111A256 Redacted ML20153A8182020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 015 Chap 09 Figures Part 6 of 7-ML20111A262-Redacted ML20153A8152020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 014 Chap 09 Figures Part 5 of 7-ML20111A261-Redacted ML20153A8122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 013 Chap 09 Figures Part 4 of 7-ML20111A260-Redacted ML20153A8212020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 016 Chap 09 Figures Part 7 of 7-ML20111A263-Redacted ML20153A7992020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 011 Chap 09 Figures Part 2 of 7-ML20111A258-Redacted ML20154K6122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of Usfar Rev 24 and FPR Rev 9 - 020 Chap 13 Conduct of Operations-ML20111A267-Redacted ML20154K6082020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 019 Chap 12 Radiation Protection-ML20111A266-BKV-Redacted ML20150A2592020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 008 Chap 08 Electric Power-ML20111A255_Redacted ML20147A6712020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 Appendices (Amended)-ML20133J880_Redacted ML20147A6762020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 LAS FRP Rev_9 ML 20111A273-Redacted ML20150A2562020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted ML20153A8102020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 012 Chap 09 Figures Part 3 of 7-ML20111A259-Redacted ML20111A2482020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20111A2512020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20111A2572020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML20111A2692020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20111A2652020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20111A2462020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Table of Contents ML20111A2502020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems ML20111A2452020-04-13013 April 2020 Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 9 to Fire Protection Report ML20111A2682020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20111A2702020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications 2024-04-15 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16111B291&oldid=382224"