ML22240A036
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML22240A036 | |
Person / Time | |
---|---|
Issue date: | 06/24/2015 |
From: | NRC/NRR/DSS/STSB |
To: | |
Craig Harbuck NRR/DSS 301-415-3140 | |
Shared Package | |
ML22240A001 | List:
|
References | |
Download: ML22240A036 (146) | |
Similar Documents from NRC/NRR/DSS/STSB | |
---|---|
Category:Guidance Document
MONTHYEARML22240A1112016-04-29029 April 2016
[Table view]Some use of "" in your query was not closed by a matching "".Changes Related to AP1000 Gts Subsection 3.8.5, Distribution Systems Operating ML22240A1102015-11-18018 November 2015 Integrated Table of Final Gtsts Vs Incorporation of TSTFs by TSTF 11-18-2015 ML22240A1092015-11-18018 November 2015 Integrated Table of Final Gtsts Vs Incorporation of TSTFs by Gtst 11-18-2015 ML22240A0212015-09-0202 September 2015 Changes Related to AP1000 Gts Section 5.7, High Radiation Area ML22240A0132015-06-29029 June 2015 Changes Related to AP1000 Gts Section 3.0, Surveillance Requirement (SR) Applicability ML22240A0372015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.2, RTS Source Range Instrumentation ML22240A0462015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.11, ESFAS Startup Feedwater Flow Instrumentation ML22240A0382015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.3, RTS Intermediate Range Instrumentation ML22240A0202015-06-29029 June 2015 Changes Related to AP1000 Gts Section 5.6, Reporting Requirements ML22240A0452015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.10, ESFAS Reactor Coolant System Hot Leg Level Instrumentation ML22240A0472015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.12, ESFAS Reactor Trip Initiation ML22240A0492015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.14, ESFAS Spent Fuel Pool Level Instrumentation ML22240A0122015-06-29029 June 2015 Changes Related to AP1000 Gts Section 3.0, Limiting Condition for Operation (LCO) Applicability ML22240A0502015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.15, ESFAS Actuation Logic Operating ML22240A0102015-06-29029 June 2015 Changes Related to AP1000 Gts Section 1.4, Frequency ML22240A0442015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.9, ESFAS Manual Actuation ML22240A0432015-06-29029 June 2015 Changes Related to AP1000 Gts Subsection 3.3.8, Engineered Safety Features Actuation System (ESFAS) Instrumentation ML22240A0982015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.8, Main Steam Line Leakage ML22240A0942015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.4, Secondary Specific Activity ML22240A0952015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.5, Spent Fuel Pool Level ML22240A0962015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.6, Main Control Room Emergency Habitability System (Ves) ML22240A0972015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.7, Startup Feedwater Isolation and Control Valves ML22240A1012015-06-26026 June 2015 Changes Related to AP1000 Gts Subsection 3.7.11, Spent Fuel Pool Boron Concentration ML22240A0332015-06-25025 June 2015 Changes Related to AP1000 Gts Subsection 3.2.3, Axial Flux Difference ML22240A0352015-06-25025 June 2015 Changes Related to AP1000 Gts Subsection 3.2.5, On-Line Power Distribution Monitoring System ML22240A0312015-06-25025 June 2015 Changes Related to AP1000 Gts Subsection 3.2.1, Heat Flux Hot Channel Factor ML22240A0192015-06-25025 June 2015 Changes Related to AP1000 Gts Section 5.5, Programs and Manuals ML22240A0922015-06-25025 June 2015 Changes Related to AP1000 Gts Subsection 3.7.2, Main Steam Isolation Valves (Msivs) ML22240A0072015-06-25025 June 2015 Changes Related to AP1000 Gts Section 1.1, Definitions ML22240A0362015-06-24024 June 2015 Changes Related to AP1000 Gts Subsection 3.3.1, Reactor Trip System (RTS) Instrumentation ML22240A0082015-06-24024 June 2015 Changes Related to AP1000 Gts Section 1.2, Logical Connectors ML22240A0222015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.1, Shutdown Margin ML22240A0302015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.9, Chemical and Volume Control System Demineralized Water Isolation Valves and Makeup Line Isolation Valves ML22240A0282015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.7, Rod Position Indication ML22240A0272015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.6, Control Bank Insertion Limits ML22240A0262015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.5, Shutdown Bank Insertion Limits ML22240A0242015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.3, Moderator Temperature Coefficient ML22240A0232015-06-0202 June 2015 Changes Related to AP1000 Gts Subsection 3.1.2, Core Reactivity ML22240A0112015-06-0202 June 2015 Changes Related to AP1000 Gts Chapter 2, Safety Limits ML22240A1142015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.9.1, Boron Concentration ML22240A0172015-05-27027 May 2015 Changes Related to AP1000 Gts Section 5.3, Unit Staff Qualifications ML22240A0162015-05-27027 May 2015 Changes Related to AP1000 Gts Section 5.2, Organization ML22240A0152015-05-27027 May 2015 Changes Related to AP1000 Gts Section 5.1, Responsibility ML22240A0562015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.2, RCS Minimum Temperature for Criticality ML22240A0572015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.3, RCS Pressure and Temperature Limits ML22240A0582015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.4, RCS Loops ML22240A0602015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.6, Pressurizer Safety Valves ML22240A0612015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.7, RCS Operational Leakage ML22240A0622015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.4.8, Minimum RCS Flow ML22240A1052015-05-27027 May 2015 Changes Related to AP1000 Gts Subsection 3.9.4, Refueling Cavity Water Level 2016-04-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML22240A036&oldid=3722182"