Submission of Periodic Reports
ML24275A007
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/01/2024
From: Mack K
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2024-147
Download: ML24275A007 (1)


Text

L-2024-147 10 CFR 52.3 10 CFR 50.59 10 CFR 52.97(c)

October 1, 2024

U.S. Nuclear Regulatory Commission Attention : Document Control Desk 11545 Rockville Pike One White Flint North Rockville, MD 20852-2746

Turkey Point Units 6 and 7 Dockets52-040 and 52-041 Combined License Nos. NPF-104 and NPF-105

Submission of Periodic Reports

References :

1. FPL Letter L-2019-074 dated April 9, 2019, License Conditions 2.D.(11) Schedules-Initial Submittal 2. FPL Letter L-2019-176 dated September 25, 2019, Tier 1 and Updated Final Safety Analysis Report Annual Submittal 3. FPL Letter L-2023-142 dated October 16, 2023, Submission of Periodic Reports (ADAMS Accession No. ML23290A081)
4. FPL Letter L-2024-013 dated March 28, 2024, Submission of Periodic Reports (ADAMS Accession No. ML24088A195)

The purpose of this letter is to submit periodic reports for Turkey Point Units 6 & 7 (PTN 6 & 7) as required by NRC regulations and/or license conditions as a Part 52 combined license (COL) holder. The following reports are addressed by this letter, updated from the previous reporting period (References 1 and 3):

  • Semi -Annual Departures Report
  • Semi-Annual Changes, Tests, and Experiments Report
  • Semi-Annual Update of the Operational Programs Implementation Schedule

Flor ida Power & Light Company

700 Un iverse Boulevard, Juno Beach, FL 33408 Turkey Point Units 6 and 7 L-2024-147 Docket Nos.52-040 and 52-041 Page 2 of 2

Semi-Annual Departures Report and Semi-Annual Changes, Tests, and Experiments Report - For PTN 6 & 7, in accordance with the requirements of 10 CFR 50.59( d)(2) and 10 CFR 52, Appendix D, paragraphs X. B.1 and X. B. 3. b, during the period April 1, 2024 through September 30, 2024:

  • No changes, tests or experiments were implemented pursuant to 10 CFR 50.59(c).

Semi-Annual Update of the Operational Programs Implementation Schedule - Pursuant to the PTN 6 & 7 COLs Section 2.D.(11), the schedule for implementation of operational programs is to be updated every six months. Because there are no changes to FPL's construction decision, the schedule provided in Reference 1 is reaffirmed.

Annual Update of the Tier 1 Material and UFSAR -For PTN 6 & 7, in accordance with the requirements of 10 CFR 52, Appendix D, paragraphs X.B.2 and X.B.3.b, during the period of September 1, 2023 through August 31, 2024:

  • No changes were implemented to the Tier 1 Material and UFSAR.

Therefore, the previously submitted Tier 1 Material and UFSAR (Enclosures 1 and 2 of Reference 2) remain applicable.

If you have any questions, or need additional information, please contact Maribel Valdez, Fleet Licensing Manager, at 561-904-5164.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 1st day of October 2024.

Sincerely,

KenethAack -~z~

Director, Regulatory Affairs Florida Power & Light Company

cc: USNRC Regional Administrator, Region II USNRC PTN 6 & 7 Project Manager, NRR/DNRL USNRC Senior Resident Inspector, Turkey Point Nuclear Plant