ML24045A260

From kanterella
Revision as of 15:09, 5 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
News Release-IV-23-003: NRC to Conduct Open House to Discuss 2022 Performance of Columbia Generating Station
ML24045A260
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/11/2023
From:
Office of Public Affairs Region IV
To:
References
News Release-IV-23-003
Download: ML24045A260 (1)


Text

No: IV-23-003 April 11, 2023 CONTACT: Victor Dricks, 817-200-1128 NRC to Conduct Open House to Discuss 2022 Performance of Columbia Generating Station

Nuclear Regulatory Commission staff will discuss the 2022 safety performance of the Columbia Generating Station during an in-person open house scheduled for April 27. The plant is in Richland, Washington, and is operated by Energy Northwest.

The open house will be held from 3 -4 p.m., Pacific time, at the Richland Public Library, Conference Room A, 955 Northgate Drive in Richland. NRC resident inspectors based full-time at the plant and other staff responsible for plant inspection and oversight will be available to answer questions about the safety performance of the plant and the NRC's role in ensuring its safe operation.

The NRC determined that Columbia Generating Station operated safely during 2022. All inspection findings and performance indicators were green or very low safety significance. As a result, the plant remains under the NRCs normal level of oversight. This oversight entails approximately 3,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of inspection each year.

The NRC Reactor Oversight Process uses color-coded inspection findings and indicators to measure plant performance. The colors start at green and increase to white, yellow or red, commensurate with the safety significance of the issues involved. Inspection findings or performance indicators with more than very low safety significance trigger increased NRC oversight.

Plant inspections are performed by two NRC resident inspectors and inspection specialists from the agencys Region IV office in Arlington, Texas.

The annual assessment letter and meeting notice for the plant are available on the NRC website. Current performance information is available and is updated quarterly.