ML24127A186

From kanterella
Revision as of 16:18, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure
ML24127A186
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/09/2024
From: Michael Mahoney
Plant Licensing Branch II
To: Coffey B
Florida Power & Light Co
Mahoney, M NRR/DORL 415-3867
References
EPID L-2024-LLL-0009
Download: ML24127A186 (1)


Text

May 9, 2024

Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company 700 Universe Blvd.

Mail Stop: EX/JB Juno Beach, FL 33408

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR TURKEY POINT NUCLEAR GENERATING, UNIT NOS. 3 AND 4 (EPID L-2024-LLL-0009)

Dear Bob Coffey:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 30, 2024 (Agencywide Documents Access and Management S ystem (ADAMS) Accession Package No. ML24122A724), Florida Power and Light Company (FPL) submitted an affidavit dated March 15, 2024, executed by Zachary Harper, Senior Manager, Licensing Engineer, Westinghouse Electric Company (Westinghouse ), requesting that the following document be withheld from public disclosure pursuant to Section 2.390, Public inspections, exemptions, requests for withholding, of Title 10 of the Code of Federal Regulations (10 CFR):

Westinghouse LTR-CECO-23-078-P, Revision 0, License Renewal Bounding Analysis Evaluation for the Turkey Point Units 3 & 4 Steam Generator Divider Plant Assemblies

A nonproprietary copy of this document has been placed in the NRCs Public Document Room and added to the NRC Library under ADAMS Accession No. ML24122A725.

The affidavit stated that the submitted information should be withheld from public disclosure for the following reasons:

(5)(a) The information reveals certain distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(5)(c) Its use by a competitor would reduce [its] expenditure of resources or improve [its] competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

B. Coffey (5)(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

We have reviewed the request and the material in accordance with the requirements of (10 CFR) 2.390 and, based on the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all revi ew situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at Michael.Mahoney@nrc.gov or (301)-415-3867.

Sincerely,

/RA/

Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-250 and 50-251

cc: Zachary Harper Senior Manager, Licensing Engineer Westinghouse Electric Company 1000 Westinghouse Drive, Suite 165 Cranberry Township, PA 16066

cc: Listserv

ML24127A186 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME MMahoney ABaxter DWrona MMahoney DATE 05/08/2024 05/08/2024 05/08 /2024 05/09/2024