ENS 55807
ENS Event | |
---|---|
04:00 Jan 27, 2022 | |
Title | Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification |
Event Description | The following is a summary of the information provided by Engine Systems, Inc. (ESI) via fax:
ESI reported that a fatigue crack was discovered in the fireface of an EMD cylinder head, P/N 40121485, D/C 18K, installed on an emergency diesel generator set. The crack initiated on the coolant side and propagated through the fireface wall of the combustion side resulting in a water leak. Fatigue failure was likely caused by a reduced fireface thickness which reduced overall rigidity of the fireface, allowing increased deformation and ultimately failure due to high tensile stress at the blend between the fireface and valve seat. A reduced fireface thickness could result in a through wall crack that would introduce jacket water into the combustion chamber. Over time if the crack propagated or went undetected engine damage may occur. Ultimately, a crack in the fireface could lead to a failure of the diesel engine which would prevent the emergency diesel generator set from performing during a safety-event. This Part 21 applies to the Cylinder heads from D/C 18K, supplied within some power pack assemblies at Watts Bar Nuclear Power Plant. Corrective Actions: ESI recommends an ultrasonic thickness inspection on the fireface to confirm thickness is within specified range to plants with these power pack assemblies. ESI has also revised its dedication package to increase the number of ultrasonic thickness inspection points. An additional enhancement is the inclusion of an inspection map for guidance and clarity of the locations to be measured. The revision was implemented on March 15, 2022. Technical questions concerning this notification can be directed to Dan Roberts, Quality Manager and John Kriesel, Engineering Manager at (252) 977-2720. |
Where | |
---|---|
Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 2) | |
Organization: | Engine Systems, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1477.63 h61.568 days <br />8.795 weeks <br />2.024 months <br />) | |
Opened: | Dan Roberts 16:38 Mar 29, 2022 |
NRC Officer: | Karen Cotton-Gross |
Last Updated: | Mar 29, 2022 |
55807 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |