ENS 53037
ENS Event | |
---|---|
04:00 Oct 25, 2017 | |
Title | Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start |
Event Description | The following information was received by facsimile from the vendor:
Component: Speed switch P/Ns ESl50267C, ESl50267E, ESl50267H, and ESl50267K. Summary: Engine Systems Inc. (ESI) began a 10CFR21 evaluation on September 12, 2017 upon notification of a potential issue with speed switch P/N ESl50267K supplied to Hope Creek Nuclear Generating Station. The speed switch had reportedly failed in service which resulted in a failure to start of the emergency diesel generator (EDG). An analysis performed by Exelon Powerlabs determined the failure was due to a shorted capacitor that is installed on the speed switch's relay output contacts to ground. The evaluation was concluded on October 25, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. The speed switch output contacts are utilized in the engine's start circuitry and failure to function properly could adversely affect the safety-related operation of the emergency diesel generator set. Impact on Operability: If the resistance path to ground were sufficiently low, the ability of the relay output contacts to pick-up and/or drop-out associated components would be compromised. The speed switch relays are used in safety-related EDG start circuitry to control various electrical relays. Failure to properly control any of these components could adversely affect the safety-related operation of the emergency diesel generator. Root cause evaluation: The root cause of the failure is a deficiency in the design and selection of the EMC (Electromagnetic compatibility) mitigating components. Consideration was not given for the impact of voltage transients imparted on the capacitors during coil de-energization. For customers without suppression from the inductive kick, the magnitude of voltage transients may be sufficient to damage and ultimately degrade the capacitors to the point of failure. Affected nuclear plants include Nine Mile Point, Quad Cities, Dresden, Davis Besse and Hope Creek. |
Where | |
---|---|
Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+37 h1.542 days <br />0.22 weeks <br />0.0507 months <br />) | |
Opened: | Tom Horner 17:00 Oct 26, 2017 |
NRC Officer: | Vince Klco |
Last Updated: | Oct 26, 2017 |
53037 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |