ENS Event | |
|---|---|
05:00 Feb 10, 2014 | |
| Title | Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing |
| Event Description | Component: Starting air pressure regulator (Nordberg P/N 1776 506).
Summary: Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 12/13/13 upon completion of a failure analysis performed on a pressure regulator part number 1776 506 (S/N 20776487) that was returned by Brunswick Nuclear Plant (BNP) following a failure that occurred during post-installation pressure testing on their emergency diesel generator [EDG] set. The downstream pressure would not maintain its set point and began to equalize to the inlet pressure. This evaluation was concluded on 02/10/14 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. The failure to regulate downstream pressure is attributed to an o-ring within the piston guide assembly of the pressure regulating valve that was improperly installed at the factory. Failure of the o-ring's pressure boundary allows inlet pressure to leak to the outlet pressure side eventually causing equalization to occur. This equalization is undesirable since it could lead to pressures that exceed the capabilities of the engine's downstream air start solenoid valve; thereby potentially preventing the diesel engine from starting during an emergency event and performing its safety related function. |
| Where | |
|---|---|
| Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 1) | |
| Organization: | Engine Systems, Inc. |
| Reporting | |
| 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
| Time - Person (Reporting Time:+107.65 h4.485 days <br />0.641 weeks <br />0.147 months <br />) | |
| Opened: | Tom Horner 16:39 Feb 14, 2014 |
| NRC Officer: | Steve Sandin |
| Last Updated: | Feb 14, 2014 |
| 49830 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |