ML23278A096

From kanterella
Revision as of 00:15, 25 October 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ameren Missouri - EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document
ML23278A096
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/29/2023
From: Cunningham C
Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23278A094 List:
References
Download: ML23278A096 (1)


Text

PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: CammieCunningham Date: 08/29/2023 Procedure Dept: EP Document #: EIP-ZZ-OO1 01 ADDENDUM 2 New Rev. # 021

Title:

Emergency Action Level Technical BasesDocument Level of Use: Continuous Reference Infotmation Mu1tipIe EN/A 2.0 Reason for Change/Description of Change (List commitments, (Rs eB Change I?ecjztests, OERs, Plant iIods ete, anti record nuntbers here.

CR 202305763. Corrected wrong name of start up transformer See SOC for more details.

3.0. Document I)ispositfon flfernp Change flNew Docun [JfVIaicw Revision DMinor Revision flcancellation Administiative Correction fl /3 I -

DeptIlead or Designatetl Approver recjiredforAdministrative no other sina1tires reoç1 4.0 Interim Approval (Tcmp Change Only) Temp. Change #: Expiration Date:

CognizantStipervisor (Signature/PIN/Daft) SR()(Signature!PEN/Datc)

5.0 Comments

, Continucd: D 6.0 Rcvievs anti Signatures (NOT requiredfor Administrative Corrections)

Revicjps Rcquired Dept PIN { Signature 1)tite Attitchec!

Preparer N/A Techiiical Review Yes fl No TechiiicalRevw j Yes No AddlReview  : EJYcs flNo Add! Review E Yes El No DAdditional Reviews (See Attached CZ1 013 9Jorins). Number of additional CAO I 3 9s:

Type j__ ,_

COOICllfIatOr - PIN Sigitafure Date ,_4CAO139 Attached Va1idation e s UNo

-L- .:. .

50.59 Review flCA25 I 0 CA25 I 1 1JCA25 1 2 1 EN/A (per 1PA-Z/OQI43)

Screener Initial, PIV Revicoer lottiat I PIV (Dept. Head or Designated Approver) Is a Change Management Plan required? LIYes LNo tiF YES, attach QA2773 or UA2?74)

Is a Cross-Disciplinary review required? EYes LINo 7.0 Approval ([(it/icr cipprovut mztst be qualt/led c Pl T 1fR or P. 1 i/U. IFR in QoLZIA faster)

EEl snio [)irector Nuclear Operations Approval (perAPA-Z/-OOlt)1) fl t)RC is required in accordance with APA-ZZOOO91 u Department Head Final Review and Approval ()RC Meeting:

I)ept. Head or [)esignated Approver Senior DireCtor Nuclear operations (Signature/PIN/Date) --- -- -fl-- (Signature/PIN/Date) ivote Page 2 [)tf)VtdeS instructions to cc)tnplele t/itsJorin and may be Utsearded 1Qfl{fll 2 A1OOtt2 69 M1QOOOOlPic1 of ( ()(3 APA-ZL-OO1O1 Rev. t)t)2