ML20335A097
| ML20335A097 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/18/2020 |
| From: | Exelon Generation Co |
| To: | Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML20335A110 | List: |
| References | |
| Download: ML20335A097 (3) | |
Text
60000 55000 50000 -
-:e
- , 45000 t-
/
V
-3: V
,,, /
"O
-:e C.
- s C
40000
.V I I., 35000 I Acceptable Region co
- s I I 30000 25000 20000 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Enrichment (wt% U235)
- This curve is valid for all assemblies that have cooled at least 9 years.
- All assemblies loaded into DSC must meet the source spectra requirements of Technical Specification 2.1.
- This bounding radiological limit curve may be superceded with bundle specific source spectra calculations based on actual cooling times.
Calvert Cliffs Nuclear USAR 24P DESIGN BASIS RADIOLOGICAL LIMIT CURVE FOR Power Plant, Independent Figure 7.2-1 Spent Fuel Storage 660 WATTS/ASSEMBLY Installation (Reference 7.20) Revision 20
1.E+01
=
'$; 1.E+00
(.)
C
- Bounds 24P/32P/32PHB --
ns a.
(.) ........ ~
(.)
1.E-01 0
~
0 0 ....
0 1.E-02
"'I\.
.c E
a, I "I E \
-a, ns a:
1.E-03 a,
0 1.E-04
' \.
0 1.E-05
\.
10 100 1000 10000 Distance Feet from H SM End (E/W)
DOSE RATES VS E-W DISTANCE FROM HSM USAR Calvert Cliffs Independent Figure 7.4-1 Spent Fuel Storage (HSM ENDS)
Installation [REFERENCES 7.21, 7.23, AND 7.24] Revision 26
1.E+01
-- -Bound s 24P/32P/32PHB ::
-s;:;
0 1.E+00
:---.. I'..
C ns
- a. ~ .......
- J 0 ...........
0 .......
0 1.E-01 r---...
0~
0
~
0 1.E-02 e...
(I)
E
....ns (I)-
1.E-03
\
0:::
(I) 0 II) 0 1.E-04
"\
\
\
1.E-05
\
10.00 100.00 1000.00 10000.00 Distance Feet from HSM Front (N/S)
DOSE RATES VS N-S DISTANCE FROM HSM USAR Calvert Cliffs Independent Figure 7.4-2 Spent Fuel Storage (HSM FRONTS)
Installation [REFERENCES 7.21, 7.23, AND 7.24] Revision 26