MONTHYEARAEP-NRC-2024-62, Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask2024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations 2024-08-08
[Table view] |
Text
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com September 1, 2020 AEP-NRC-2020-60 10 CFR 50.55a Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI
References:
- 1. NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and e--------HEIEleAEla-t0-tMe-A-SME-0M--ode-and-section--Xr-ctated--July-28-;L0 -
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv), and the guidance provided in the referenced document, Indiana Michigan Power Company (l&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for CNP Unit 1 and Unit 2. Specifically, l&M requests approval to use IWA-4540(b) of the 2017 Edition of the ASME B&PV Code. The enclosure to this letter provides details of the proposed change.
l&M requests approval of this request by September 19, 2020. There are no regulatory commitments in this letter.
If you have any questions concerning this letter, please contact Mr. Michael K. Scarpello, Regulatory Affairs Director, at (269) 466-2649.
sj~J~
Q. Shane Lies Site Vice President MBE/mll
U.S. Nuclear Regulatory Commission AEP-NRC-2020-60 Page 2
Enclosure:
Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) c: R. J. Ancona - MPSC EGLE - RMD/RPS J. B. Geissner- NRG Region Ill NRG Resident Inspector S. P. Wall- NRG Washington, D.C.
A. J. Williamson - AEP Ft. Wayne, w/o enclosures
Enclosure to AEP-NRC-2020-60 Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv}
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)( 4 )(iv) and the guidance provided in Reference 1, Indiana Michigan Power Company (l&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, requests Nuclear Regulatory Commission (NRC) approval to use specific provisions of a later edition of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (B&PV) Code,Section XI, for CNP Unit 1 and Unit 2. Specifically, l&M requests approval to use IWA-4540(b) of the 2017 Edition of the ASME B&PV Code.
- 1. ASME Code Component(s) Affected:
All Class 1, 2, and 3 items located in the ASME Section XI boundaries.
- 2. Requested Date for Approval:
Approval requested by September 19, 2020
-pp11cao1ecooeEait1on and A-INTERVAL ISi INTERVAL PLANT EDITION SCHEDULED INTERVAL START END Donald C. Cook 5 2013 Edition 03/01/2020 02/28/2030 Nuclear Plant, Unit 1 and Unit 2
- 4. Proposed Subsequent Code Edition and Addenda (or Portion):
l&M performs Repair/Replacement activities in accordance with the Donald C. Cook Nuclear Plant Unit 1 and Unit 2 ISi Program Inspection Plan Fifth Ten-Year Inspection Interval. This program plan is based on an Edition of ASME Section XI which, at present, is the 2013 Edition.
Pursuant to 10 CFR 50.55a(g)(4)(iv), l&M requests permission to utilize IWA-4540(b) from the 2017 Edition. This subparagraph outlines items that are exempt from pressure testing after repair/replacement activities.
. Enclosure to AEP-NRC-2020-60 Page 2
- 5. Related Requirements:
10 CFR 50.55a(g)( 4 )(iv) states:
"lnservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met."
10 CFR 50.55a(b )(2) incorporates by reference Section XI, Division 1, of the ASME B&PV Code 2017 Edition as approved in Reference 3. l&M is requesting to use of IWA-4540(b) of the 2017 Edition of ASME Section XI to utilize the exemptions listed. There are no related requirements or applicable conditions associated with this subparagraph, IWA-4540(b).
- 6. Duration of Proposed Request:
The duration of this request will continue for the remainder of the site's current lnservice Inspection interval.
- 7.
References:
- 1. NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004.
- 2. U. S. Nuclear Regulatory Commission Memorandum from D. Rudland (Senior Level Advisor, Division of New and Renewed Licenses) to Anna H. Bradford (Director, Division of New and Renewed Licenses), "Summary of the June 25, 2020, Public Meeting with the Nuclear Industry to Discuss Title 1O of the Code of Federal Regulations Section 50.55a(b )(2)(xxvi) Condition on the Pressure Testing of Class 1, 2, and 3 Mechanical Joints," dated July 8, 2020 (ML20189A286)
- 3. Federal Register, 85 FR 26540, dated May 4, 2020
8. Precedents
No precedents have been identified.