IE Inspec Rept 50-367/78-06 on 780918 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl:Qc Procedures,Work Activities Re Pile Driving,& Quality Records
ML20062C421
Person / Time
Site: Bailly
Issue date: 10/03/1978
From: Maxwell G, Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20062C419 List:
References
50-367-78-06, 50-367-78-6, NUDOCS 7811090003
Download: ML20062C421 (3)


Text

, _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

..

U.S. NUCLEAR REGULATORY COMMISSION

0FFICE OF INSPECTION ~ AND ENFORCEMENT

REGION III

Report No. 50-367/78-06 Docket No. 50-367 License No. CPPR-104 Licensee: Northern Indiana Public Service Company 5256 Hohman Avenue Hammond, IN 46325 Facility name: Bailly Nuclear Generating Station - .;

I Inspection at: Bailly Site, Porter, IN l

- 1 Inspection conducted: September 18, 1978 Inspector: wey-HrW b - / C,}3 7/

Cff-chu s&r A-Approved by: R. L. Spessard, Chief /C!J!#7/* ,

Engineering Support Section 2 '- 1 Inspection Summary Inspection on September 18, 1978 (Report No. 50-367/78-06)

Areas Inspected: QC procedures; work activities concerning method of pile driving; and quality records. The inspection involved 1 1/2 inspector-hours on site by one NRC inspecto Results: No items of noncompliance were foun .

.

.

.

' 78110900 0

.

.

=

.

DETAILS Persons Contacted Principal Licensee Employees

  • R. J. Bohn, Manager, Nuclear Staff
  • J. W. Dunn, Nuclear Staff Engineer C. F. Braun Company
  • J. S. Fiedler, Project Manager M. A. Smith, QC Civil Engineer
  • D. K. Maxwell, Site QC Supervisor R. C. Patula, QC Inspector
  • Denotes those present at the exit intervie Functional or Program Areas Inspected Driving of Indicator Piles On September 18, 1978, the inspector was dispatched to the site to inspect pile driving activities being conducted. The following observations were made during the site visit: Approximately 128 indicator piles have been driven since August 7, 197 The current procedure, which is being utilized during the driving and inspection of these 128 indicator piles, is Thatcher Engineering Corporation procedure 10-3, titled

" Inspections--Pile Driving Procedure Inspection", dated July 7, 1978. This procedure does not include any provisions for the use of jetting or vibration equipmen Indicator pile number SA28 was being driven; and neither jetting nor vibration equipment was used. This observation was made by the inspector at approximately 3:30 p.m. on September 18, 197 There was neither jetting nor vibration equipment located in the immediate work area where indicator piles are being driven.

4 Laborers were loading some vibrator hardware equipment onto

. a transfer-truck; however, the hardware was located near a site storage /laydown are .

,

-2-

-

.-

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

. The inspector was informed by the C. F. Braun and Company site Quality Control Supervisor that there are eight test piles, located near the South-East corner of the Service Building, which were placed by jetting equipment; however, these eight (8) piles were placed in 1977, prior to IE's and NRR's concern about the site's pile driving activitie The inspector did not observe any indications that jetting or vibration equipment had been used on indicator piles placed since July, 197 No items of noncompliance were identifie . Documentation, Relative to Indicator Piles The> inspector reviewed a C. F. Braun and Company summary log book which contains summary statements concerning the placement of (~ indicator piles driven since August 7,1978. There was no indication in the log book that jetting or vibration equipment had been used during the placement of the indicator pile The inspector observed that eighteen of the Pile Driving Inspection Records (Thatcher Form DR-6) for indicator piles, which have been driven for the Reactor Building, had set-graphs attached to the According to the C. F. Braun and Company Site Quality Control Supervisor, these set-graphs could be related to the wave action caused by the driving of the applicable indicator pile No items of noncompliance were identifie Exit Inte rview The inspector met with site staff representatives (denoted under ,

Persons Contacted) at the conclusion of the inspection on September 18, l 1978. The inspector summarized the purpose and findings of the inspection. The licensee acknowledged the findings reported herei l

.

.