MONTHYEARML24324A0202024-11-21021 November 2024 Letter - Kairos Power LLC - Issuance of Construction Permits for the Hermes 2 Test Reactor Facility ML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24158A2322024-08-30030 August 2024 Letter to Kairos, Inc., Exemption and Final EA ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24144A0912024-05-23023 May 2024 Kairos Power, LLC - Submittal of the Hermes 2 Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, Revision 1, and the Postulated Event Analysis Methodology Technical Report, Revi ML24138A2122024-05-16016 May 2024 Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapters 3, 5, and 13 ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24135A3832024-05-14014 May 2024 Kairos Power, LLC - Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24131A1262024-05-10010 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 1, 4, 6-8, 10-12, 14, and 16-18 ML24101A0772024-04-23023 April 2024 Hermes 2 NPS Dea ML24101A0782024-04-23023 April 2024 Hermes 2 SHPO Dea ML24101A0722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, J ML24113A1732024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hill, D ML24113A1702024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bunch, J ML24113A1692024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bryan, a ML24113A1682024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Barnes, B ML24113A1712024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Cernek, J ML24113A1722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hicks, M ML24113A1742024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hoskin, Jr., C ML24113A1752024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, L J ML24113A1762024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Morrow, R K ML24113A1782024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Rogers, L ML24113A1772024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Osceola, Jr. M W ML24113A1792024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Sylestine, R ML24113A1822024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yargee, W ML24113A1802024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Wallace, G J ML24113A1812024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yahola, ML24101A2172024-04-19019 April 2024 Letter to Kairos Power, LLC-Notice of Availability of the Draft Environmental Assessment for the Construction Permit for Hermes 2 Test Reactors ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML24103A2422024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 ML24206A0852024-03-20020 March 2024 NPS Section 106 Initiation Response - Hermes 2 ML24073A3182024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 ML24072A2982024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 ML24065A1012024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report ML24039A1902024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 ML24032A1872024-02-0202 February 2024 Ltr Hon Chuck Hoskin Jr Principal Chief Cherokee Nation Re Hermes 2 ML24032A2002024-02-0202 February 2024 Ltr Libby Rogers, Principal Chief, Jena Band of Choctaw Indians Re Hermes 2 ML24032A1992024-02-0202 February 2024 Ltr Hon Wilson Yargee, Chief Alabama-Quassarte Tribal Town Re Hermes 2 ML24032A1982024-02-0202 February 2024 Ltr Hon Stephanie Yahola, Mekko Kialegee Tribal Town Re Hermes 2 ML24032A1972024-02-0202 February 2024 Ltr Hon Stephanie a Bryan Chairwoman Poarch Band of Creek Indians Re Hermes 2 ML24032A1962024-02-0202 February 2024 Ltr Hon Ryan K Morrow Town King Thlopthlocco Tribal Town Re Hermes 2 ML24032A1952024-02-0202 February 2024 Ltr Hon Rick Sylestine, Chairman, Alabama-Coushatta Tribe of Tx Re Hermes 2 ML24032A1942024-02-0202 February 2024 Ltr Hon Michell Hicks Principal Chief Eastern Band of Cherokee Indians Re Hermes 2 ML24032A1932024-02-0202 February 2024 Ltr Hon Marcellus W Osceola Jr Chairman Seminole Tribe of Fl Re Hermes 2 ML24032A1922024-02-0202 February 2024 Ltr Hon Lewis J Johnson Chief Seminole Nation of Oklahoma Re Hermes 2 ML24032A1912024-02-0202 February 2024 Ltr Hon Jonathan Cernek Chairman Coushatta Tribe of Louisiana Re Hermes 2 2024-09-16
[Table view] |
Text
September 26, 2022 Peter Hastings, Vice President Regulatory Affairs and Quality Kairos Power, LLC 707 W Tower Ave Alameda, CA 94501
SUBJECT:
NOTIFICATION OF THE ISSUANCE OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE KAIROS HERMES TEST REACTOR IN OAK RIDGE, TENNESSEE (DOCKET NUMBER: 50-7513)
Dear Vice President Hastings:
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application submitted by Kairos Power, LLC (Kairos) for a construction permit (CP) pursuant to Title 10 of the Code of Federal Regulations Part 50, that would allow construction of a non-power test reactor termed Hermes on a 185-acre site located in Oak Ridge, Tennessee. As part of the review of this CP application, the NRC has completed the draft environmental impact statement (EIS) as required by 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, the NRCs regulations that implement the National Environmental Policy Act (NEPA) of 1969, as amended. The draft EIS, NUREG-2263, Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor is publicly available from the NRCs Agencywide Documents Access and Management System (ADAMS) as ML22259A126. ADAMS is accessible from the NRC website at https://www.nrc.gov/reading-rm/adams.html.
The draft EIS includes analyses of relevant environmental issues and documents the NRC staffs determination regarding the effects of constructing the Kairos Hermes non-power test reactor. As discussed in chapter 5 of the draft EIS, the NRC staffs preliminary recommendation, unless safety issues mandate otherwise, is that the CP be issued as proposed. This recommendation is based on: (1) the analysis and findings of the staffs independent environmental review documented in the draft EIS; (2) consultation with Federal, State, tribal, and local agencies; (3) the environmental report submitted by the applicant; and (4) the consideration of public comments.
The NRC staff plans to hold a public meeting to discuss the analyses and results in the draft EIS on Wednesday, November 16, 2022, at the Hilton DoubleTree at 215 S. Illinois Avenue in Oak Ridge, Tennessee. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m. EST, as necessary. Those unable to attend in person may view and participate in the meeting virtually and should monitor the NRCs Public Meeting Schedule website at https://www.nrc.gov/pmns/mtg for access information. Meeting details will also be available by
P. Hastings 2 November 1, 2022, at https://www.nrc.gov/reactors/non-power/kairos-hermes.html. The meetings will be transcribed and will include: (1) a presentation of the contents of the draft EIS; and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft EIS. Additionally, the NRC staff will host an open house one hour before the start of the meeting during which members of the public may meet with NRC staff. You and your staff are invited to attend.
The NRC requests that you submit any information, comments, or concerns you may have on the draft EIS during the 60-day comment period which ends on December 6, 2022. Comments can be submitted: (1) by e-mail to KairosHermes-CPEIS@nrc.gov; or (2) in person during the public meetings. After consideration of public comments received, as well as information received through consultation, the NRC will prepare a final EIS, which is scheduled to be published on or before September 2023.
Enclosed is the NRCs Federal Register (FR) Notice of Availability that will be submitted to the Office of the Federal Register. This notice advises the public that the draft EIS is available for public review and how to submit comments. There will be a separate notice of filing of the draft EIS in the FR through the U.S. Environmental Protection Agency.
If you have any questions concerning the NRC staffs environmental review of this CP application, please contact Tamsen Dozier via phone at (301) 415-2272 or via email at Tamsen.Dozier@nrc.gov; or Peyton Doub via phone at (301) 415-6703 or via email at Peyton.Doub@nrc.gov.
Sincerely, Kenneth T. Digitally signed by Kenneth T.
Erwin Erwin Date: 2022.09.26 15:18:29
-04'00' Kenneth Erwin, Chief Environmental Review New Reactors Branch Division of Rulemaking, Environment, and Financial Support Office of Nuclear Material Safety and Safeguards Docket No: 50-7513
Enclosure:
As stated
ML22243A252 *via email OFFICE PM:REFS LA:REFS OGC (NLO)
NAME TDozier AWalker-Smith MWright*
DATE 09/06/2022 09/07/2022 09/16/2022 OFFICE BC:REFS NAME KErwin DATE 09/26/2022