ML22271A705
ML22271A705 | |
Person / Time | |
---|---|
Issue date: | 05/12/2022 |
From: | NRC/OCM |
To: | |
Shared Package | |
ML22122A066 | List: |
References | |
M220512 | |
Download: ML22271A705 (58) | |
Text
1 UNITED STATES NUCLEAR REGULATORY COMMISSION
+++++
BRIEFING ON ADVANCED REACTORS ACTIVITIES WITH FEDERAL PARTNERS (PUBLIC MEETING)
+++++
THURSDAY, MAY 12, 2022
+++++
The Commission met in the Commissioners' Conference Room, First Floor, One White Flint North, Rockville, Maryland, at 10:00 a.m.,
Christopher T. Hanson, Chairman, presiding.
COMMISSION MEMBERS:
CHRISTOPHER T. HANSON, Chairman JEFF BARAN, Commissioner DAVID A. WRIGHT, Commissioner ALSO PRESENT:
BROOKE CLARK, Secretary of the Commission PANEL MEMBERS:
DR. ANTHONY CALOMINO, Space Nuclear Technology Portfolio Manager, Space Technology Mission Directorate, National Aeronautics and Space Administration ALISON HAHN, Director, Office of Nuclear Reactor Deployment, U.S.
2 Department of Energy JAMES SAMPLE, Principal Director of Infrastructure, Deputy Assistant Secretary of the Air Force for Environment, Safety, and Infrastructure, U.S. Air Force DR. JEFF WAKSMAN, Program Manager, Strategic Capabilities Office, U.S.
Department of Defense
3 1 P-R-O-C-E-E-D-I-N-G-S 2 10:00 a.m.
3 CHAIRMAN HANSON: Good morning everyone, I 4 convene the commission's public meeting on advanced reactors activities with 5 federal partners. It's a great pleasure to welcome colleagues from the 6 Department of Defense, the U.S. Air Force, the Department of Energy, and 7 the National Aeronautics and Space Administration. As we often say at the 8 NRC, we're independent, but not isolated. And so it is important, I think, to 9 do, and to have meetings like this today where we hear from our colleagues, 10 and other branches of the federal government.
11 One of the NRC strategies for regulating new reactor 12 technologies is effective coordination with DOE, and other U.S. government 13 organizations, including DOD and NASA. NRC appreciates these 14 interactions as opportunities to strengthen its capabilities for advanced reactor 15 regulation, while being mindful of our role, again, as an independent regulatory 16 authority.
17 So, I thank you all for supporting this meeting today, and I'm 18 looking forward to a great conversation. Before we start, I'll ask my 19 colleagues if they have any comments they'd like to make. Okay, with that, 20 we're going to begin with our first speaker, Dr. Jeff Waksman, the program 21 manager for the Strategic Capabilities Office of the U.S. Department of 22 Defense. Dr. Waksman, the floor is yours.
23 DR. WAKSMAN: Thank you. So, I'm going to be talking 24 today about Project Pele, if you could go to the next slide please. So, this is 25 the bottom line up front slide about what Project Pele is. Project Pele derives 26 from a 2016 Defense Science Board study on the need for mobile, reliable,
4 1 sustainable, resilient power. So, it is a transportable nuclear reactor that will 2 produce one to five megawatts of electrical power for a minimum of three 3 years. It needs to be transportable by army equipment, so trucks, C17, et 4 cetera. It's based on TRISO fuel, which I'll talk about on my next slide. We 5 began a two-year reactor design competition in March 2020, we actually 6 kicked that off in this building in the last week before COVID, so we had very 7 good timing for that.
8 We started with three companies. We then down selected 9 to two after one year, and we are now in the process of down selecting to one.
10 That winning company, their design is not 100 percent completed, but it's 11 close. So, we're going to wrap up the rest of the design, and then the plan is 12 to begin ordering hardware later this year. The plan is to take about two years 13 to fabricate, it will then be transported Idaho National Laboratory in mid-2024.
14 The reactor, and the fuel will be fabricated in different 15 locations. They will be shipped separately to Idaho National Lab. It will then 16 be fueled inside the treat facility, and then after operation readiness review, it 17 will begin operation. And again, hopefully that will be in the tail part of 2024.
18 Next slide please.
19 So, this is TRISO fuel. Id imagine the Commission is 20 probably familiar with this, but just for those watching who maybe are not, the 21 image in the upper right, that cut away is what a TRISO pellet looks like. The 22 red in the center is the uranium, and it's surrounded by these other layers that 23 includes a porous carbon material to absorb the fission product gasses, and 24 then silicon carbide.
25 The DOE spent a lot of effort and time developing this AGR 26 TRISO variant since 2002, and this fuel has been tested to 1800 degrees
5 1 Celsius for 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> with almost no breakage, which is obviously much hotter 2 than it'll ever experience inside a core.
3 Now, they did not primarily do this for safety, because as we 4 all know, nuclear reactors are already very safe in this country. The primary 5 goal was actually to reduce cost. The idea was that by having these 6 additional layers of protection you would maybe not need to have such 7 elaborate additional containment beyond, that would hopefully reduce capital 8 costs, and also reduce O&M costs. This has a couple additional benefits for 9 us in the DOD. In the DOD, we always have to consider the possibility of a 10 kinetic strike breaking open the reactor.
11 And obviously that's going to be a bad day regardless, 12 you're not going to have no radiation release, but the fact that the fission 13 product gases are inside millions of these little pellets should significantly 14 reduce the amount of fission gases that are able to escape. Also from a 15 proliferation perspective, we think this will make these very resilient to 16 proliferation. You'd have to get these tiny bits of uranium out from -- I don't 17 think anyone's actually figured out a way to recycle this sort of fuel yet, to get 18 through all the silicon carbide layers, everything else. So, and combine that 19 with the fact that this not HEU fuel, this is HALEU fueled, it's a very unattractive 20 proliferation target. So, next slide please.
21 So, this is a brief history lesson. For a lot of folks who don't 22 know, Army nuclear power has existed before, back in the 50s, the Army, and 23 the Air Force also had programs in addition to the Navy. The Army built eight 24 reactors, the first reactor to be plugged into the U.S. electric grid was an Army 25 reactor. That said, these were very unreliable. I'm sure it would give the 26 safety officials here hives to try to regulate one of these reactors today, so we
6 1 are certainly not bringing these designs back.
2 So, on the next slide please. So, why are we doing this 3 now if we haven't done this in 45 years? So, the DSB identified that energy, 4 and electricity are increasingly important to the DOD mission. Not only new 5 weaponry, like directed energy weapons, and UAVs, and drones, but also 6 we're looking to electrify the non-tactical fleet, and obviously climate change 7 and reducing fossil fuels in general has become much more of a goal.
8 It's now considered a strategic threat to the DOD. And at 9 the same time, getting energy around the world has never been more difficult.
10 In previous wars, we've always been able to get fuel pretty close to the front 11 before it's at risk, and that will not be the case in any future conflict. In fact 12 even within the contiguous 48 states, there are now risks of cyber attacks that 13 could take the grid down. And we need to be able to handle that as the DOD.
14 At the same time, nuclear power has advanced quite a lot.
15 Generation three reactors have been producing power on the grid around the 16 world since 1996, and generation four reactors are now here with the Chinese 17 HTRPM, which turned on last year. So, their conclusion was, someone 18 should see if nuclear power can work, someone should try to build one.
19 Next slide please. So, the Strategic Capabilities Office is a 20 very small office, we have not done a nuclear project before. So, we certainly 21 don't have a nuclear team in place. So, this has had to be a whole 22 government effort. One of the first things we did was a trilateral agreement 23 with the Department of Energy and Nuclear Regulatory Commission just to 24 provide technical advice, design advice.
25 We also have asked NRC to help us with future licensing 26 risk. We would like the possibility of either having the NRC potentially
7 1 regulate the next generation of Pele, or at the very minimum, have a Pele 2 commercial spin off that we'd want the NRC to regulate. So, we want to make 3 sure that we're not going down a pathway that's going to be hard to license.
4 The DOE is providing the safety oversight, and 5 authorization, that's also where the Price Anderson is flowing through. The 6 NRC does have a role while you're not regulating the reactor itself, we are 7 asking you to approve the -- or we're going to ask you to approve the reactor 8 module as a transportation package, and I'll talk about that a little more in a 9 future slide.
10 NEPA was done jointly with DOE and the Army Corps of 11 Engineers. And the fuel we're getting is from NNSA, they're providing us with 12 HEU, that we're getting ready to down blend to HALEU. And the TRISO is 13 being done jointly at the commercial scale TRISO facility that we've set up at 14 BWXT Lynchburg, we've done that jointly with DOE and NASA. Next slide 15 please.
16 So, we believe that Pele will facilitate commercial advanced 17 reactors in multiple ways. One is just obvious, once you build a reactor, you 18 can build a commercial spin off, you'll have a lot of data, it should be a lot 19 easier once you've already built one. But we hope that this will also be a path 20 finder for other advanced commercial reactors. We know that there's a 21 challenge in the country that no non-light water reactor has ever been 22 regulated by the NRC. And it's a huge first mover problem, because any 23 company that comes along doesn't know what's really going to be involved 24 here, there's a huge uncertainty, and I know that the NRC is working very hard 25 to develop that. I'm very familiar with the licensing modernization project, but 26 there's still a lot of uncertainty.
8 1 So, I think the NRC being arm in arm with us, and watching 2 what is involved in us demonstrating to DOE regulators that this reactor is safe 3 will hopefully provide understanding of okay, how much time, and effort, and 4 money is really involved in showing that a micro reactor is safe. TRISO was 5 originally developed to be a commercial game changer, that's why the DOE 6 spent 400 million dollars developing it.
7 But someone has to build one of these with AGR TRISO.
8 Obviously there were TRISO reactors back in the day, back in the 60s, but 9 that was obviously very different from the AGR TRISO variant. And we like 10 to point out that this is how this was done in the 50s as well. The commercial 11 sector did not come up with nuclear reactors from scratch. The first reactor, 12 the shipping port reactor was an aircraft carrier reactor. And it was built by 13 the Navy, and then it was handed off to industry. And to this day, the fact that 14 most reactors around the world are light water pressurized water reactors is 15 because that's what Admiral Rickover decided was best for a sub. And you 16 get technological lock in, you get supply chain lock in, but at the same time 17 the DOD can reduce risk. That allows commercial companies to say well 18 rather than develop our own technology, why don't we just use this one that 19 already has a lot of data? So, we do believe that this can be a real pathfinder 20 in that way. Next slide please.
21 So, speaking of Admiral Rickover, this is my scared straight 22 slide. So, Admiral Rickover has this famous essay that most people who are 23 involved in nuclear are familiar with. I put a piece on the left there, where he 24 talks about the difference between what he called an academic reactor, and a 25 practical reactor, which in 2022 parlance is a power point reactor versus a real 26 reactor. The nuclear industry is awash in power point reactors. And his
9 1 point here is things you think are hard might be easy, but things you think are 2 easy will be hard. And there's just a big step from power point reactors to 3 real reactors, and as I'm sure you're aware, all of the reactors that produce 4 power in the United States broke ground no later than the 1970s, and per the 5 IAEA, as of about two weeks ago, the number of non-naval power reactors 6 under construction in the U.S. is two; those are the Vogtle reactors. And two 7 ties us with such economic powerhouses as Bangladesh and Slovakia.
8 And we have to be realistic of where we are as a country, in 9 terms of where our supply chain is and where our industry is. So, we just 10 have to be realistic about that. So, next slide please.
11 So, how do we hope to actually do this? So, there's a few 12 pieces to it. One is obviously trying to wrap up the design, that's what we're 13 trying to do now. We have -- we're certainly aware that if we have to do 14 significant redesigns after we start manufacturing, that will be crippling to 15 budget and schedule, so we're going to try to avoid that at all costs. We know 16 that quality assurance is going to be a major issue. We're certainly aware of 17 the challenges that the Vogtle reactor had. It's not only that finding NQA1 18 certified suppliers is hard, but even if they're NQA1 certified, it does not mean 19 that they can necessarily deliver.
20 The Navy has gone through a lot of effort to develop its 21 supply chain, and it's not as easy as going on Amazon and buying 22 components. So, we cannot assume that subcontractors can deliver what 23 they say they can deliver, and that's a big part of what we're focused on. The 24 DOE authorization process is obviously something we have to do. We have 25 to get through PSAR, the FSAR, all the acceptance reviews, all the things you 26 would imagine you have to do, and obviously the operational readiness review
10 1 will be the last step there. Training operators, we have already -- I think we've 2 actually completed the hiring of a few people now who will be our first tranche 3 of operators. They will be learning off a demo, so that they'll be ready to 4 operate the reactor when it's there. And then they will also serve to train the 5 second generation of operators who will come from the Army Corps of 6 Engineers and the National Guard, who will be brought out to Idaho to learn 7 how to move the reactor, assemble, disassemble, and how to operate the 8 reactor. So, part of what we're doing now, is figuring out what the training 9 needs to be for folks like that who have experience doing prime power, but 10 don't have a nuclear background. Next slide please.
11 So, this gets me to our NRC engagement, and so we have 12 been engaging the NRC at a working level from the start. And I think we've 13 certainly had a very good relationship with the NRC. We're trying not to just 14 show up one day, and say hey, can you guys regulate this without having 15 coordinated to work this out with you all. So, as I mentioned before, a lot of 16 what NRC is doing is just providing informal advice. When we have design 17 reviews, folks at the NRC sit in, they're free to express thoughts or concerns 18 to us about our testing plan, anything else in an unofficial way. In a formal 19 way, what we are trying to do that's novel is to define the reactor as an over 20 the road transfer package per 10 CFR Part 71.
21 So, the idea is that our system is multiple 20-foot CONEX 22 boxes, so shipping containers. One of those boxes will have the reactor in it, 23 and any kind of control rod, or drum mechanisms I'm going to have to say 24 vaguely, and then the shielding. And then that box, in the field, should never 25 be opened. The idea is we try to move as many moving parts as possible 26 outside the radiative area so that we can do maintenance in a non-radiated
11 1 environment. And then that box should not be opened, which is good from a 2 proliferation perspective, you know now one is going to actually be able to get 3 to the uranium. But that box is what we want to ship, and obviously we need 4 to meet the whatever it is, ten millirems per hour, two meters. And obviously 5 a variety of other things we have to show we meet. So, this is obviously 6 something that hasn't been done before, and so we've been engaging the 7 NRC on this for awhile. In the end, it will be the winning vendor who will be 8 submitting, they will be submitting for this approval, it will not be us submitting, 9 it will be the company. And we've also -- DOT has been engaged as part of 10 this as well, we've engaged with DOT for a couple years as well. Next slide 11 please.
12 So, I'm not going to read this whole slide, because I don't 13 like people who just read slides, but there's a lot here of the different steps 14 we're undertaking here, starting with the probabilistic risk assessment, and 15 going down. And we're certainly happy to talk about this, and I've only got 73 16 seconds here, so I'm not going to try to read through more of this. But 17 certainly, this is stuff we've been going back, and forth many times with your 18 experts on a working level here, and I think we've had a very productive -- we 19 know there's work left to do, there's a lot of work left to do. But certainly the 20 folks we work with don't think there's any show stoppers here. So, I'm just 21 going to go to the last slide to close here.
22 And I have closed with this slide for a couple years in my 23 slide decks, and my point here is that I think there's two things about nuclear 24 power that literally everybody in America can agree with. And one is that if 25 we can make nuclear power work, if we can do it safely and cheaply, then it's 26 a total game changer for the DOD and the commercial sector, I think we can
12 1 all agree on that.
2 But I think also everyone can agree that it's hard. There's 3 a reason why no one has built one, it's not because smart people haven't tried, 4 and I think the challenges are not so much engineering, it's all the other things.
5 It's the regulatory regime, not that the regulatory regime is unreasonable, but 6 just figuring it out. Figuring out what exactly the regulatory regime is. The 7 environmental procedures, supply chain is a huge, huge problem, if anything 8 I would underline that one as the biggest one, supply chain. But figuring out 9 con ops, what exactly the technical requirements are, what the training's going 10 to be, there's just a lot that has to be done. And so to get back to the point 11 from the beginning, The only way we're going to know if we can do this is if 12 we build one. And that is the point of Project Pele. And so that's the end of 13 my slide deck, and thanks for the opportunity to speak to you, and I look 14 forward to any questions.
15 CHAIRMAN HANSON: Thank you Dr. Waksman, I 16 appreciate that presentation. We're going to hand it over now to Mr. Jim 17 Sample, he's the acting deputy assistant secretary of the Air Force for 18 environment safety, and infrastructure. Mr. Sample, the floor is yours.
19 MR. SAMPLE: Thank you sir. My presentation is going to 20 echo a lot of Jeff's I guess, themes, but we're kind of going in a little bit of a 21 different way. If you go to the next slide, thank you sir. I was the acting 22 director until about a week ago, we do have a new director, Ms. Nancy Balkus 23 would love to be here, she sends her thanks. She's actually in Colorado right 24 now, as we spin her up, and give her all the stuff that's going on. But our 25 division, when I was the acting, and what she's in charge of now, we are in 26 charge of for the Air Force, let me throw one caveat quick, I need to do it, we're
13 1 the department of the Air Force, because we now do have two services, we 2 have the Space Force and the Air Force. I find myself slip several times, and 3 say Air Force. A lot of combined requirements in those two services, and 4 some really unique requirements that really lend themselves to your area of 5 expertise. So, we'll be working with you, we're working with you extremely 6 closely on all this stuff, and we'll also be doing with some Space Force things 7 in the very near future.
8 As I said, my division does installation energy, all military 9 construction, environment, and safety. So, a lot of the stuff you're dealing 10 with, I'm relatively new to this, but it is an amazing technology, and we are so 11 excited about the project that we're going through. As I said, I'm the director 12 of built infrastructure now, so I'm in charge of all military construction the Air 13 Force does across the board.
14 We're going to use a contractor for this, but we are going to 15 do some lessons learned, and we're watching it from our construction side. I 16 do have to throw one shout out. Ms. Judith Willis, who is sitting in the back, 17 is my expert on all this. If I have to phone a friend, that's who I'm going to.
18 If we go to the agenda slide next. You'll see quickly, I'm just going to run 19 through these things. Not need to go over that -- good.
20 This is simply the what, why, and how we're going to do this 21 project. We could probably spend a lot of time on this, I'll go into more detail 22 as we go through. First off, as Jeff mentioned, this technology, micro nuclear 23 reactors, to the Air Force, just checks so many boxes for us. From the ability 24 both to produce power, and heat. Heat gets lost on a lot of things. People 25 don't realize heat, and when we get into Alaska, heat is ridiculously important.
26 Also supply chain, all the different supply chain issues we're having at the
14 1 moment, this technology is just amazing. You'll see, Ill go through this, 2 there's huge benefits for greenhouse gases, and things of that sort with this 3 technology, that's not why we're doing this, these are truly operational 4 reasons.
5 So, we're excited by this technology, what are we going to 6 do now? We are going to do a pilot project, and it's not a technology 7 demonstrator, this is a pilot project solely to determine the best way to 8 integrate these into our installations. So, we know this is a tactile issue we 9 want to go to, let's do a pilot project to run all the traps working with the NRC, 10 how we do that, working with states. I'll get to that in a little bit.
11 Working with the state, and local, public, environmental, all 12 those things are stuff that my shop does. What we don't do is operate nuclear 13 reactors. So, that is not a core competency in the Air Force, so we are going 14 to go, as part of this, we are going to work to buy the power from a commercial 15 product. So, while we don't do nuclear reactors, we do spend money well.
16 So, our goal is to do a 20-year power purchase agreement, 17 that we will guarantee we will buy the power for 20 years from a contractor 18 that comes in, and puts a small nuclear reactor on our location. So, we were 19 looking at places, where can we best do this? We're going to do a pilot 20 project in Alison Air Force Base in Alaska. Alaska, ridiculously remote, at the 21 tip of the spear at the moment, dealing with Russia, and things of that sort.
22 What we are operating at Alison is vitally important to our 23 operations, and the national interest. Currently, Alison is run, powered both 24 heat and power by a coal plant. That coal plant runs just on average, we're 25 burning 800 tons of coal a day at that location. Beyond the logistics of just 26 keeping that running getting the coal to it, you can see the vulnerabilities
15 1 associated with that.
2 That if we can get a small micro nuclear reactor to take some 3 of that load off. At the moment, we're just talking about five megawatts, they 4 have anywhere from 15 to 20 need daily, for a pilot project. But once again, 5 a pilot project is to determine how we can best do this and move forward going 6 there. That was most of the first slide. If you go to the next slide, where are 7 we at now, the current status.
8 We are in the process, we're almost done, we're actually in 9 the coordination of the RFP for this to go out. We're working with DLA 10 Energy, we mentioned their GC branch has it, they're having some problems 11 with staffing in GC, so that's the current hold up, but things are moving forward 12 extremely quickly. I have to say once again, thanks from the Department of 13 the Air Force to NRC. You guys, we have been teaming amazingly well with 14 you pushing this forward. You can see -- read all the slides on that.
15 One other thing I want to mention before, dealing with the 16 states. As we've been working this with 2016, working the project, we 17 realized when we chose Alaska, the Alaska state regulations involved in this, 18 they don't have anything for micro reactors. They all deal with big reactors, 19 just the time line, and reviews associated with the siting, and everything in 20 Alaska would have doomed this project. There's no way we would have it 21 anywhere in the near future to actually get results so we can move forward.
22 With that said, the Alaska legislature, both their state and their federal 23 senators have taken great interest in this. We've had a great relationship with 24 them, they have written an act relating to micro reactors, Senate bill 177, that 25 just passed the Senate May 3rd. We think it's going to go through, I think it 26 had -- I have the votes, it was like only two votes against. Great teaming, part
16 1 of that has been working with you all, but also the transparency of this.
2 We've gone to the communities, we've gone to the tribes, I'll 3 go into communications a little bit later. Frankly, we thought we were going 4 to have a lot more opposition, and we've been extremely happy with the way 5 things have been moving along. Next slide. So, the acquisition process.
6 It's kind of an eye chart on this. You see where we are at the moment. We 7 have completed almost everything associated with the RFP. We're doing the 8 final coordination, we hope to have plotted that out this summer. I can go 9 through the excruciating details on that, but you can see the details, a 30 year 10 lease for the land, 20 year power purchase agreement, that's just those 11 targets, it can be more, and we'll look at it as we go forward. Next slide.
12 Kind of interesting talking to the NRC about the application 13 process, considering you guys are the experts on this, not me. But you can 14 see this slide is just where we're going to get to the point where we get the 15 vendor to do an application. Kind of like Jeff said, we're hoping the vendor 16 will be the proponent for the application. They'll be the proponent for a lot of 17 the environmental work, but we are going to help them with this. We know 18 we are the catalyst for this, we are the reason it's happening, so we have to 19 be involved. But like I said, we're not the experts on this aspect of it, we are 20 great at the community outreach, 106 consultations, environmental, and 21 things of that sort, but we'll work with NRC on those things.
22 And that bottom line, the continuous stakeholder 23 engagement is by far the most important thing with this, as you've seen with 24 any nuclear project. So, once we get to the licensing application, if you go to 25 the next slide. You notice that left bar is still the same, so this is actually we 26 get the application to you, then we get to the licensing process.
17 1 You'll notice on this there's a little yellow dot that says DAF 2 involvement. That's kind of misleading, because we are obviously involved 3 in every aspect. Every box you see on this, the yellow dots are where we're 4 going to take a major -- not a lead, because you still have the rules of who is 5 in charge of it, but for public scoping meetings, obviously it's going to be on 6 an Air Force base, so we need to be up front. Environmental review, it's going 7 to be on an Air Force base, we need to be up front. But we will be working 8 with the NRC, and other partners going forward on this, including the public 9 comments. They should be talking to us. We're the ones driving this, we 10 need to be answering the public comments, we need your help from a 11 regulatory standpoint/expertise standpoint. But we know we're partners on 12 this, and this is not going to work without the partnership.
13 Part of this aspect will be the environmental, how we go 14 through the NEPA law on that. We see where we're still working with the 15 lawyers, and that's part of the stuff that's holding up, how exactly we do that, 16 where we're a cooperating agency, who is the lead agency. We don't see 17 any hiccups in doing that. We see we're all going to be a team working on 18 this anyway, but who is the actual stuckee for the lead, that's still coming 19 forward. Next slide.
20 This has been the greatest success so far. As I mentioned, 21 we thought we were going to have a lot more opposition, both from tribes, and 22 local. We've had very little. We've been out in the bushes telling people 23 what our plans are. Asking for their input, asking what they're worried about.
24 We had several interviews on local radio, just trying to get everyone's 25 concerns, and amazingly there hasn't been as much. I think that goes a lot 26 to your credit, and Jeff, and everyone else has been doing, getting this
18 1 technology out there, and they see what a benefit this is for us. Also the 2 national defense aspects of it. It's the end of the coal plant up there, we 3 thought we'd had more issues from coal lobbyists, we haven't had much at all.
4 The important thing is we're going to continue this process, continue complete 5 transparency all the way through, and want to be your partners on that. Next 6 slide.
7 So here's from, I mentioned that I'm in charge of military 8 construction for the Air Force. This is the chart, this schedule amazes me, 9 and excites me. You can see where we are in 2022, this is where we'll 10 release the RFP. One thing I skipped over, if you saw on some of the slides, 11 the previous slide on the stakeholder engagement. We're going to release 12 the RFP hopefully this summer, and then we're going to have a conference, 13 we're calling it a pre-proposal conference up in Alaska, where we can get 14 vendors in to look at the base.
15 If they want to make a proposal, they need to see where can 16 they put sites, where can it be on the base, ask questions of us, try to get as 17 much information out there to get successful proposals in as we possibly can 18 up front. We're going to probably do it somewhat hybrid, but every question 19 that's asked from any of the vendors will document, and put out, so everyone 20 has the same information that we're starting forward.
21 We would love NRC to be a part of this, either remotely, or 22 up in Alaska, it will be very interesting. So, that's going to happen this 23 summer, after we release the RFP. And then you can see the rest of that 24 time line, the interesting thing is that last foot, we expect this to be operational 25 in 2027. So, between proposal, vendor, NRC license, you'll notice that 2026 26 bullet is the build.
19 1 I know, I've taken to heart Jeff's last slide of yes, don't be 2 optimistic on planning, but with this technology, and with some of the work 3 Jeff's done with other folks, we think that's actually doable. That the actual 4 construction and development of this thing will only be about a year, and we'll 5 actually start using electricity and heat from this at Alison in 2027 with all your 6 help. And that's actually the last slide I had. I look forward to questions.
7 CHAIRMAN HANSON: Thank you, Mr. Sample. Next 8 we're going to hear from Ms. Alison Hahn, she's the director of Advanced 9 Reactor Deployment in the U.S. Department of Energy. Ms. Hahn?
10 MS. HAHN: Good morning, thank you for having me here 11 today. So, at the department we are working to address challenges in the 12 nuclear energy sector, and to leverage nuclear energy's role in combating the 13 climate crisis by enabling the continued operation of the existing fleet, enabling 14 the deployment of the advanced nuclear reactors, and developing the 15 advanced nuclear fuel cycle.
16 I'm pleased to be here today to share the work that DOE is 17 doing to ensure that innovative advanced reactors are available to meet our 18 energy needs, and our ambitious carbon production goals, while supporting 19 the economic vitality of our communities. Next slide please.
20 So, President Biden continues to make addressing climate 21 change a priority, and the Administration has set those ambitious goals of 22 achieving a 100 percent clean electricity generation mix by 2035, and a net 23 zero economy by 2050. And we know that we cannot meet these ambitious 24 goals without the clean, reliable power provided by nuclear energy. That's why 25 we are focused on both preserving that existing fleet, and driving deployment 26 of innovative advanced reactors. Next slide please.
20 1 So, while the current landscape for nuclear energy in the 2 United States is our large existing plants that provide that reliable firm power 3 for distributed grids, the future energy landscape is expected to look quite 4 different. A combination of existing fleet, advanced nuclear power plants, 5 coupled with fossil energy with CCUS, and renewable sources will not only 6 produce the electricity that we're used to seeing, but we'll be able to flexibly 7 provide heat and electricity to decarbonize other sectors of the economy, and 8 support the needs of the grid. And to meet these needs, dozens of U.S.
9 companies are working on advanced nuclear projects for a wide array of 10 capabilities.
11 These newer technologies are being offered in a variety of 12 sizes. The designs include light water cooled SMRs, as well as advanced 13 sodium, gas, and molten salt cooled reactors. And we see significant levels 14 of private sector investment, including with international partners to build out 15 the supply chain. Diversification beyond electricity will enable the 16 decarbonization of industrial processes that rely on thermal energy like 17 hydrogen production, as well as the electrification of new sectors, like 18 transportation. Next slide please.
19 Our advanced reactor technologies, or the ART Program, 20 works with industry, national labs, other federal agencies like the NRC, 21 universities, and international entities to support the development, and future 22 commercialization of innovative advanced reactors. Within the ART Program 23 there are four research campaigns.
24 So, first we have the fast reactor campaign, which focuses 25 on de-risking, and demonstrating fast reactor components and technologies 26 providing validated codes, and experimental databases to support licensing,
21 1 and code qualifying advanced structural materials to reduce costs, and 2 increase safety margins.
3 Then we have the gas reactor campaign. Within the ART 4 Program, this campaign is focused on metal alloy qualification and scaled 5 experiments. And as my colleagues have mentioned, we also have a 6 separate program that's working to qualify that TRISO fuel, and nuclear 7 grades of graphite for use in high temperature reactors.
8 Third, we have the molten salt, MSR research campaign.
9 This is focused on investigating fundamental salt properties, materials, 10 models, and fuels to support these reactors. And then lastly we have the 11 micro reactor research program. This program funds activities to mature 12 innovative components and semi autonomous operating regimes for micro 13 reactors. The program also supports non-nuclear testing to support micro 14 reactor development. And we're also working to establish the micro reactor 15 applications research validation, and evaluation, or MARVEL test bed, which 16 will offer nuclear integrated systems testing, and I have a slide on that 17 momentarily.
18 In addition to the four research campaigns, the ART 19 Program also supports cost shared partnerships with industry to reduce the 20 technical, and regulatory risks associated with a diverse set of advanced 21 reactor designs. The ARC20 Program, or Advanced Reactor Concepts 2020 22 is funding the development of three designs that could have a significant 23 impact on the energy market in the mid 2030s, so 2035 or later. Those three 24 concepts are Advanced Reactor Concepts, LLC, conveniently named, 25 General Atomics, and MIT. Next slide please.
26 In addition to supporting reactor development, the
22 1 department supports two programs focused on security and safeguards. The 2 advanced reactor safeguards program is working to address near term 3 challenges that advanced reactor vendors face in meeting U.S. domestic 4 material control and accounting, and then physical protection system 5 requirements as well.
6 So, specific focus areas for the ARS program, it doesn't look 7 great on the slides up there, but we have physical security. We're evaluating 8 new technologies, and approaches to physical security seeking to reduce up 9 front, and operational costs, and improve economics. The pebble bed 10 reactor MC&A approach is based around three item control areas. We've got 11 the fresh pebble storage, and then the reactor and pebble handling system, 12 and then the spent pebble storage area.
13 For the combined micro reactor PPS, and MC&A area, we're 14 working to develop a domestic licensing framework for micro reactors as a 15 function of design options. The liquid-fueled reactor MC&A approach for 16 liquid-fueled MSRs is being developed, and discussed with the NRC staff to 17 help inform work on measurement possibilities to support future licensing 18 applications.
19 Internationally, the ARS Program supports the generation 20 four, or Gen4 proliferation resistance, and physical protection working group, 21 and we're coordinating with the National Nuclear Security Administration to 22 support U.S. vendors with a deeper understanding of the differences between 23 the domestic, and international requirements. And then lastly, we're working 24 again with NSA on exploring potential vendor engagements.
25 So, while these engagements will produce generic 26 deliverables to share with all reactor vendors, they provide the opportunity for
23 1 more targeted work with specific reactor designs as well. And then we have 2 the cross-cutting technology development cyber security program, which 3 develops technologies, and methods to address cyber threats to the U.S.
4 nuclear power infrastructure. We work very closely with the Department of 5 Energy Cyber Security, Energy Security and Emergency Response, or 6 CESER Office, and support secure implementation of advanced technology, 7 such as wireless control, and remove, or autonomous operations. Next slide.
8 Through our advanced reactor regulatory development 9 program, the Office of Nuclear Energy coordinates closely again, with the NRC 10 and industry to address and resolve key regulatory framework issues that 11 directly impact advanced reactor demonstration, and deployment.
12 A key part of this program has been supporting an industry 13 led project developed to develop proposed guidance for an NRC license 14 application through the technology inclusive content of applications project, 15 TICAP. This cost shared project builds on the outcomes of the NRC 16 endorsed licensing modernization projects, risk informed, and performance 17 based approach, and proposes a structure to right-size license application 18 content through guidance that is flexible, clear, and appropriate for industry 19 applicants planning to use that approach. The advanced reactor regulatory 20 development program also supports targeted R&D to reduce the technical, 21 and regulatory risks by providing bases for the establishment of licensing 22 technical requirements. Work in this area generally addresses topics that are 23 beyond private sector capabilities, or that can be significantly accelerated 24 using national lab resources. Next slide.
25 So, I talked about the R&D. Through the Gateway for 26 Accelerated Innovation in Nuclear (GAIN), we facilitate the private access to
24 1 the technical, regulatory, and financial support. which is necessary to move 2 new reactor technology towards commercial deployment.
3 GAIN supports funding opportunities to accelerate 4 deployment through its voucher program, providing companies direct access 5 to national laboratory expertise, and capabilities to advance the commercial 6 readiness of their technologies. Next slide.
7 And if you think about GAIN being kind of a lower TRL focus, 8 and NRIC's more of the higher TRL focus. So, NRIC, the National Reactor 9 Innovation Center, led by the Idaho National Lab, is providing a range of 10 capabilities to support nuclear technology demonstrations, including the 11 establishment of demonstration test beds. These test beds will provide the 12 infrastructure where developers can demonstrate and test their technology, 13 such as fueled test reactors, and obtain the data they need to support their 14 designs in licensing applications. The demonstration and operation of micro 15 reactor experiments, DOME, got a lot of acronyms today, will support 16 demonstration of micro reactor technologies, and is expected to be ready for 17 the first planned test in 2024; that's the date we're working towards. We're 18 also working to establish a second NRIC test bed, which can support 19 experimental reactors that use safeguards category one materials for 20 operation.
21 Although not required for commercial concepts, some 22 reactor demonstrations, and experiments require that higher enrichment fuel 23 to keep the size of the reactor small, while still ensuring that neutronics and 24 thermal hydraulics are representative of their commercial designs. This 25 requires a safeguards category one facility for operation, which is difficult to 26 find outside of the DOE complex.
25 1 And then earlier this year, NRIC also initiated the advanced 2 construction technologies initiative. This initiative aims to reduce cost 3 overruns, and schedule slippages that we have seen recently in the 4 construction of nuclear plant projects. NRIC, in collaboration with industry 5 partners will develop advanced nuclear plant construction technologies that 6 can drive down costs and speed up the pace of advanced nuclear deployment.
7 Next slide.
8 I'm going to not read the title again, and just go with 9 MARVEL was inspired by the SNAP 10A space nuclear reactor with a primary 10 objective to produce an operational micro reactor on the most accelerated time 11 line as possible. We're planning to generate approximately 20 kilowatt 12 electric, using four commercially available off the shelf sterling engines.
13 The core will be made up of 36 fuel pins, and each pin will 14 have five uranium zirconium hydroxide fuel pellets using HALEU. MARVEL 15 will be installed in the treat storage pit at INL. This will allow us to leverage 16 the existing treat control room for the MARVEL reactor. Once operational, 17 MARVEL will serve as a nuclear test platform to validate operating regimes 18 and end use applications for micro reactors that haven't been demonstrated 19 before. So, think data centers, and things of the sort. One significant 20 accomplishment for the project, is that MARVEL is the first new reactor to 21 complete an environmental assessment array for NEPA compliance, which 22 sets the precedence for reactors being DOE authorized, and eventually NRC 23 licensed. Again, MARVEL is planned for operation in 2024. Next slide.
24 I mentioned this briefly earlier, but future energy systems 25 will need to be highly flexible and responsive, integrated energy systems will 26 provide a more secure, resilient, and sustainable energy infrastructure,
26 1 resource efficiency, national economic stability, and international 2 competitiveness. DETAIL combines systems that represent energy 3 generation sources, distribution systems, energy storage, and energy users 4 to demonstrate how novel integrated energy systems might be operated within 5 a microgrid under both nominal and off-nominal conditions. This allows 6 researchers to show how a nuclear reactor, which will be represented by a 7 250 kilowatt electrical heater, would physically connect with renewable 8 energy, energy storage, industrial plants, and within a microgrid.
9 It will also demonstrate control systems for this new type of 10 multi input, multi output energy system that can support multiple energy use 11 sectors. DETAIL integrates real world energy storage, electrical vehicles, 12 solar power, and more using physical hardware, grade emulators, and 13 modeling and simulation tools to form a working model of tomorrow's electric 14 grid. Next slide.
15 So, we are deeply invested in private, public partnerships 16 with a range of nuclear developers to address the highest technical, and 17 regulatory risks for commercialization. We're supporting three demonstration 18 projects to deploy first-of-a-kind reactors on the grid by the end of this decade.
19 It's hard to see the letters, but on the upper left we have the first one, the 20 Carbon Free Power Project will result in the first commercial demonstration of 21 the NuScale light water cooled SMR out of the national lab in 2029. The 22 natrium reactor is a sodium cooled fast reactor that's being demonstrated by 23 TerraPower in partnership with GE Hitachi. A novel molten salt thermal 24 energy storage system allows the plant to ramp up its electricity from 100 25 megawatt electric to 500 megawatt electric over five hours, making this plant 26 a price follower on the grid. The natrium plant will be sited at a retiring coal
27 1 site in the state of Wyoming, which is in the top coal producing region in the 2 United States. The Natrium reactor will be an energy powerhouse for 3 Wyoming, providing hundreds of high paying jobs and attracting industrial 4 manufacturing to the region.
5 And our third demonstration project is the X Energy high 6 temperature gas cooled reactor. This four module plant configuration of the 7 XE-100 module will provide 320 megawatt electric, and is ideally suited to 8 provide flexible electricity output again, as well as process heat for a wide 9 range of high temperature industrial heat applications, you'll see a trend there.
10 The reactor design will be fueled by TRISO pebbles providing a robust safety 11 profile. X Energy recently submitted a license application for its TRISO X fuel 12 fabrication facility to the NRC, I believe. And it is worth repeating that all three 13 of these demonstration plans are ideally sized to take advantage of the 14 infrastructure and work force of retiring coal plants, bringing energy security 15 to regions seeking to transition away from fossil fuels.
16 In addition to the three demonstration projects, we're also 17 funding five risk reduction projects aimed at reducing risk, and technical 18 uncertainty for a broad range of advanced reactor designs. Again, they're 19 located in the top right of the slide. The first project is Kairos Power; it will 20 support the design, construction, and operation of the Hermes test reactor to 21 be located in East Tennessee Technology Park in Oak Ridge, Tennessee.
22 We then have two micro reactor projects led by 23 Westinghouse and BWXT respectively. Westinghouse's design is a heat 24 pipe cooled design, while the BWXT banner reactor will be a high temperature 25 gas cooled reactor. Holtech is our only light water cooled SMR in the 26 Advanced Reactor Demonstration Program.
28 1 And then finally we have a project led by Southern Company 2 to design, construct, and build a molten chloride reactor experiment, or MCRE.
3 MCRE will be sited at the Idaho National Lab, and will not be NRC-licensed, 4 but will be authorized by DOE. Then I should note here the XE 100, the 5 Kairos Power/Hermes test reactor, and the Westinghouse, and BWXT micro 6 reactor designs again, as my colleagues have already pointed out, are 7 proposing to use that robust TRISO fuel form, which is being qualified by DOE.
8 And again, as was mentioned earlier, DOE has spent over 400 million dollars 9 to qualify this fuel, and graphite to be used in these programs. Next slide 10 please.
11 In conclusion, advanced reactors are crucial for achieving 12 national, and global carbon reduction goals. DOE's continuing to perform 13 foundational R&D on advanced reactor, and fuel cycle technologies to 14 improve nuclear energy safety, and performance. We are connecting 15 developers with the expertise, and capabilities of our national labs, and private 16 public partnerships are bringing first of kind demonstrations to the grid within 17 this decade. Thank you.
18 CHAIRMAN HANSON: Thank you, Ms. Hahn. Next we'll 19 hear from Dr. Anthony Calomino, he's the Space Nuclear Technology Portfolio 20 Manager for the Space Technology Mission Directorate within the National 21 Aeronautics and Space Administration. Dr. Calomino?
22 DR. CALOMINO: Thank you. Thank you for inviting me 23 to talk today, and I apologize for not being able to be there in person. Are 24 you guys hearing an echo?
25 CHAIRMAN HANSON: We're not hearing an echo here.
26 DR. CALOMINO: Okay, that's all that matters then. So, I
29 1 had some personal conflicts that prevented me from being there today, so I 2 apologize for that. If the slides are up, and you're looking at the slides, I can 3 start talking on where we're at. So, on the first slide, I just want to kind of talk 4 a little bit why NASA is interested in space nuclear technologies.
5 We've been interested in nuclear technology since the early 6 1960s. We've had activities related to propulsion on using actually fission 7 technology. As we begin to expand our interests in human exploration, both 8 near-term, or near cislunar and lunar operations, as well as looking for some 9 deep space missions, the two investments that we're looking to actually gain 10 from this is on power and propulsion.
11 As we expand the capabilities, NASA needs, one of the 12 things we're looking for is that it will help maintain our space leadership role, 13 as a global leader in space leadership. We are working towards, and 14 interested in working technology, but also contribute to enhancing the national 15 security, our global competition position, looking for infusion of products back 16 into the domestic economy, to grow that. And then contributing where we 17 can to green energy, and the reduction of our carbon footprint. Next slide 18 please.
19 The two technologies that I indicated that we're investing in, 20 fission surface power as well as nuclear propulsion. On fission surface 21 power, we're looking for something very close in power category, or class to 22 what the MARVEL system is that was spoken to. We're actually looking to 23 demonstrate something that would be on the lunar surface at first, and then 24 we want to have something that would be evolvable, or extensible to a Mars 25 human exploration mission, it would be somewhere in the late 2030s, or early 26 2040s timeframe. The space nuclear propulsion is enabling capability for its
30 1 mass density, for its efficiency in propellant, and actually being able to conduct 2 some cislunar operations, lunar tugs, moving to and from the surface of the 3 moon. But also for some of our deep space missions, where solar electric-4 type applications will become prohibitive because of the fact that we've lost a 5 lot of the solar intensity that we would have, plus temperatures would 6 decrease the efficiency of some of the solar power cells as well.
7 Our current focus right now is actually on the fission surface 8 power system that has a broad range of applications for our mission needs.
9 And so this is actually the priority that NASA has in terms of developing 10 capabilities. But we do have investments in both power, and propulsion that 11 are effective right now. The next slide on nuclear power for the moon and 12 Mars, I just want to talk a little bit on why it is that this is important for NASA.
13 Beyond the fact that we have these high energy density 14 systems, which are solar or chemical that we eventually use, fission power 15 systems are looked at as providing abundant, continuous power for all the 16 operations that we would need on the moon and Mars. You look at the moon, 17 and the day/night cycle, the night on a lunar night is about 14, and a half days.
18 It is a time period when you essentially have very cold operations on the moon 19 itself, the environment itself is one where you need to have these atomic 20 sources of power to maintain habitats, to keep them warm, to keep rovers 21 running, to continue to do operations during the night for 14 1/2 days. The other 22 interest we have large regions on the moon, NASA knows that we're going to 23 look for resources that we would use. One of the important ones is ice water, 24 and to actually be able to extract the ice from the ground, use that to produce 25 oxygen and hydrogen that can be used in the operations by the overall 26 architecture. But the ice deposits are actually sitting in the colder region, so
31 1 if we want to be able to operate in those regions to extract that ice, mine it, 2 and process it.
3 As you begin to look at operation on Mars, the big challenge 4 there that we have is the fact that we have the probability of dust storms on 5 the surface of Mars. Actually these dust storms could be rather significant.
6 If you look at the image there, between 2016 and 2018, you can see that 7 during one of the dust storms in 2018, a lot of the planet is actually obscured 8 by the dust storm that was going on the surface of Mars.
9 The dust storm has a few adverse effects for some of the 10 conventional systems like solar cells. One, it would cut down on the amount 11 of light we're going to get, and the other is that the dust itself deposits onto the 12 cells decreasing their efficiency even when the dust storm ends. For a 13 nuclear system, a nuclear system is not only mass competitive for the power 14 ranges needed on the surface of Mars. But it also is insensitive to the dust 15 storms, and to a lot of the other aspects that solar systems or conventional 16 power systems would need to be designed to survive. Next slide please.
17 So, just talking a little bit about what our requirements are, 18 and I would point out that as far as NASA is going down these lines, we're not 19 in terms of actual hardware designs, and activities related to hardware designs 20 for these end applications. We're not as far along as DOD Pele activity, but 21 we are on a course that hopefully will get us there relatively soon. For the 22 things such as power requirements, we are looking for about 40 kilowatt 23 capability to demonstrate that on the moon. As I said, that's close to the same 24 power category as the MARVEL system. We do want to have a system that 25 is capable of being transported, taken off of a landing platform, put onto a 26 rover.
32 1 Having the ability to move that power plant to where it is 2 going to be needed, depending on where the operations are moved as well.
3 One of the things that's important for a space based system that is not as 4 important for a land based system, and I think probably it is a bit of an issue 5 for Pele, because the mobility, but for NASA, it's really about mass. We have 6 to take this hardware, we have to get it out of the earth gravity well, and then 7 we have to transport it to another terrestrial body and deposit it, or land it safely 8 on that surface. So, whether we're landing it safely on the surface of Mars, 9 or landing it safely on the surface of the moon, all of that in terms of looking at 10 the mass, is a big driver in terms of architecture, and some of the things that 11 we can do.
12 We're looking to have a 40 kilowatt system that can weigh 13 about six metric tons, or less to fit into our architecture. And then we're also 14 looking for a lifetime on these power units of ten years, operate for ten years.
15 And one of the other aspects that we need, is we need to have fault tolerance.
16 So, if the system actually has a single fault, we want to still be able to produce 17 power at the kilowatt level, and that means we need to build some redundancy 18 into that power system itself.
19 Early on NASA was interested in looking at highly enriched 20 uranium solutions, and the big interest for highly enriched uranium solutions 21 is that will always give us the lightest, and the smallest reactor for a space 22 application. So, when you look at that mass driver, it is sort of a natural thing 23 that you want to look for higher enrichments to get that mass and volume 24 down.
25 But we've also looked at the opportunities, and the benefits 26 of engaging commercial industry and having partners in developing these
33 1 systems. And actually pulling from them on their innovation and some of their 2 technology that they have been working on getting this basis. So, we have 3 been looking at high assay LEU thermal reactor applications for NASA on the 4 propulsion side and on the power side.
5 And we're very surprised, that depending on what kinds of 6 technologies that can mature and get into these reactors, we can actually end 7 up with systems that have very comparable mass and slightly higher volumes 8 than where we were with HEU systems. And so we have been pivoting for 9 targeting more of our investments into the highly enriched LEU solutions.
10 Next slide.
11 For nuclear propulsion, just talking about two of the 12 capabilities that NASA is looking at, and when we look at these systems, one 13 of the aspects that we were interested in doing is targeting a human Mars 14 mission. And in that regard, we have payload requirements, we have both 15 opposition-class missions as well as conjunction-class missions that we're 16 looking at, sometimes those two words, opposition, and conjunction don't 17 carry a lot of meaning for others. But basically the way it works is that there's 18 an alignment between Earth and Mars, the synodic period, where we can have 19 very low amounts of energy to make the jump from Earth to Mars, and it's 20 typically about every two years, and it's something that we've been doing with 21 our probes and our rovers to date. Mars 2020 was actually launched on the 22 synodic period.
23 But once you do that, you actually arrive at Mars, and you're 24 basically going to be there until the alignment for the next period arrives, which 25 is about two years. So, if the astronauts do a conjunction class mission, they 26 have a relatively short transportation time to Mars, but then their stay there is
34 1 going to be a little longer before they can come back.
2 And then we have this other opposition class mission, which 3 is basically doing a fast transit out, you have about a 30-day mission that you 4 can conduct on the surface of Mars, and then you can do a fast transit back 5 to Earth. And that actually though requires a lot more energy. That's really 6 where some of these nuclear systems pay big dividends for NASA, in terms 7 of the energy capability that they provide.
8 While the nuclear thermal propulsion, as well as nuclear 9 electric propulsion can close that mission, and we're looking at both, the 10 nuclear electric propulsion has some benefits associated with fewer launches, 11 a little lower mass, and also the technologies that we would use for a nuclear 12 electric system are considered to be of a higher maturity. The challenges in 13 terms of getting them in use are not as big on those. And we can actually 14 even leverage some of the technology that we would be developing, hopefully 15 from the fission surface power system to advance the nuclear electric system.
16 On a nuclear electric system, we're using the reactor to generate the 17 electricity. That electricity is then distributed out to electric thrusters, hull 18 thrusters. And then the hull thrusters are actually what push the vehicle 19 forward. Very high propellant efficiency on those.
20 The other system, which is a much simpler system, but it 21 has quite a few other higher challenges associated with it, particularly on the 22 reactor side, is that we're using the nuclear reactor as a large heat exchanger 23 generating a significant amounts of heat in the reactor, typically right now 24 we're looking at these reactors that operate somewhere in 2700 Celsius 25 region, the heat propellant that we need. And then we exhaust that heated 26 propellant out the back. The big challenge for the nuclear thermal propulsion
35 1 system is materials that we can use. There's very few, and actually getting 2 them to survive that high temperature environment with flowing hydrogen, and 3 the neutronics has been a big challenge for us, but we have been working 4 that, and we do have some material solutions that have been evolving as 5 we've been moving forward. Next slide.
6 So, as I said, we kind of pivoted towards a low enriched 7 uranium solution, as this has opened up our ability to actually reach out, and 8 engage some of the commercial industry reactor designers in this. Back in 9 August, we released three design awards with industry partners: USNC, 10 BWXT, and General Atomics; began to develop a reactor that is capable of 11 handling the temperatures, and the performance goals that we need for the 12 nuclear thermal propulsion system.
13 We're a little more than halfway through the execution of 14 those contracts right now. What they're going to deliver, is they'll end up 15 delivering a preliminary design for reactors with frequent design innovations 16 from industry on this. Those performance periods will end in August of 2021.
17 And our intent is to use the information gained from these design efforts to 18 look at additional engagements with industry downstream; to actually tighten 19 some of our design requirements; to get better alignment with industry; and to 20 have a better sense of their innovations and their approaches to be able to 21 (audio interference) on within NASA. Next slide.
22 We are also recognizing that as we move towards these low 23 enriched uranium solutions for NASA's application, the technologies that we 24 need to get the mass and volume down have lower technology maturity. so 25 we need to do investments there to bring them up to speed. A lot of this is 26 associated with fuel development. We are partnering with DOD on some fuel
36 1 manufacturing capabilities; I'll talk a little bit about that in some later slides.
2 Although Jeff, and his team are looking at really the TRISO, which is really ---
3 the TRISO fuel for their application, and want to take advantage of the 400 4 million dollar investment that DOE has in qualifying that fuel.
5 That fuel system for NASA's application is not going to get 6 us to the performance metrics that we need, particularly for the NTP reactor.
7 But one of the things that it does do, it gives us the advantage of the carbide 8 manufacturing capability, probably look at changing the fuel chemistry, looking 9 at a uranium nitrate chemistry, and a zirconium carbide pressure coating on 10 the system to get to the higher temperatures, and the other performance 11 metrics that NASA needs.
12 But in terms of the manufacturing capability itself, we can 13 basically do that in some very similar facilities, or actually the same exact 14 facility as the DOD scope. So, we're looking at these fuel chemistries, we're 15 looking at some of the processing requirements for those chemistries. We're 16 also making investments in moderator materials to be able to use liquid 17 hydride materials, and reactors at the base. To take advantage of the 18 neutron benefits they provide to the reactor itself. And then for us, it's back 19 to the manufacturing these reactors in space, they're not going to look like 20 terrestrial systems. They're not going to perform exactly as terrestrial 21 systems do. We need higher temperatures speaking on the power side, than 22 what we would see in a power system. So, the manufacturing methods bring 23 in some of the more advanced materials into these reactor designs, and 24 working those technologies as well. A lot of this effort is being worked both 25 between and in partnership with DOE. We have been actually integrating 26 with our development teams, and we work together to advance these
37 1 technologies and get them ready.
2 One of the things I want to point out in terms of our operating 3 conditions and what we're doing. Any of the testing that we would do on the 4 ground for flight hardware for NASA is really going to be at zero power critical.
5 We're going to minimize the generation of any of the fission products, because 6 it would be a logical concerns with operating in and around, and actually 7 getting a hardware system into the launcher payload to prepare it for either 8 the moon or for Mars. Next slide.
9 So, on the interagency collaborations, we have been 10 reaching out, and this is actually also motivated by some of the policy 11 changes, NSPM 20 and SPD 6, looking to have better synergy and 12 commonality with other government agencies to advance this technology. I 13 think this is a win/win for us all. We all have our use cases that we have for 14 these technologies. We've reached out to, and work with the Defense 15 Innovation Unit on some of their small NEP high efficiency systems, and 16 contributing to some of the ideations of their proposals. We are collaborating 17 with DARPA on their DRACO space craft flight demonstrator that right now is 18 planned for FY26. As I said already, we've been working for a few years now 19 with DOD and the Pele Program to invest in a common field manufacturing 20 capability.
21 And then we do work with DOE in terms of the materials 22 element, and some of the tests that we need to get those done. And that is 23 an ability for us to actually leverage commonality between the two where we 24 have alignment, and use capabilities that have benefit for us all. Next slide.
25 On the federal policy and processes and how it's impacted 26 NASA, NSPM 20 has really had a big benefit to us in terms of coming back
38 1 and giving us quantifiable tiers that we can design in mission to minimize the 2 radiological risks or exposure to the public for any of the nuclear payloads.
3 And it actually lays out a path that NASA can follow in terms of its procedures 4 and requirements to develop a process that would get us to align a flight 5 approval of the launch as we're actually developing, and designing the 6 hardware itself.
7 The nice thing about NSPM 20, it does to a level/allow us to 8 keep the launch authorization process within the agency itself, as opposed to 9 going up to the Executive Office. SPD 6 has actually worked out well for us 10 in terms of laying out some of the common road maps between some of the 11 different agencies. It also lays out some guidelines on when and how both 12 LEU and HEU can be used. And so it's good to have all of that codified into 13 a policy for our development on our efforts as well.
14 And then the other two things that we've been working on is 15 we are about to issue a report that outlines what NASA's 20-year mission 16 outlook looks like for nuclear missions, and the capabilities that we're going to 17 need to complete those missions. That report should be out in the next 18 couple of months. And then we continue to work with OSTP and NSC on 19 evolving these policies and procedures, and making sure that as they're 20 implemented as we're moving further down the development pathway, that 21 we're getting good alignment with other federal agencies, and with our needs 22 that -- within our own agency. Next slide.
23 I'm not going to go over into this too much. I just want to 24 leave this out there, we do have a road map, this is going to be an evolving 25 process. We're identifying our synergies and our link ups with agencies like 26 DARPA. Obviously, DARPA is a big player with us right now in terms of
39 1 nuclear propulsion, and we're working very closely with them on that 2 capability. As we begin to make more significant investments into the electric 3 propulsion, we'll reach out to more of the electric propulsion technology areas, 4 particularly our fission surface power effort, as well as looking towards 5 investments, and innovations that are coming out of the Pele program, and 6 some of the terrestrial programs for power units on Earth. Next slide.
7 This is my get off the stage slide. I kind of want to go here 8 though -- we are pretty far along in terms of where we're going, and what we're 9 doing. In terms of getting some of these technologies in place, I think the 10 reach out to industry, getting them engaged on the propulsion side. We 11 expect to have very similar industry engagements on the power side next 12 month, we have awards for a power reactor in the next month. And we realize 13 it's just the beginning. And as we look to establish these capabilities and look 14 actually at eventually finishing out detailed designs, and building and testing 15 hardware, there are other areas that we begin to need to explore as we move 16 forward.
17 We need to resolve what it means to have a space irradiated 18 reactor and space design standards. Although a lot of the terrestrial design 19 standards are going to be great guides, and we certainly are going to use them 20 to guide our work, not all of them are going to be able to be applied to a space 21 reactor.
22 So, we need to understand where some of our design 23 standards are going to have to be modified or tailored to adapt to these 24 systems. NASA's going to need probability methods for nuclear launch 25 safety analyses and to change that landscape a little bit, we've got to modify 26 some of our methods and analysis methods for nuclear launch safety.
40 1 We're going to have to address human operations and 2 safety concerns for operating reactors off Earth, and make certain that we 3 have the same level of safety and operational reliability for a reactor that would 4 be either on the moon or on Mars, as you would want on Earth for human 5 operations around them. One of the other aspects, and its been talked a little 6 bit about here, is that NASA, we don't want to own this capability. It's not a 7 government capability, which is one of the big benefits of bringing commercial 8 interests in, and that is to be able to infuse this into industry, make it an 9 industry capability. And we would look to industry as sort of the leaders in 10 terms of looking at what is going to be required to commercialize and license 11 that capability for space.
12 Eventually we've got to look at reactor controls, 13 maintenance, disposal, we're not considering things right now in terms of 14 refueling these systems, but it could be a possibility. We do want them to 15 operate for ten years without maintenance for the initial couple of operations 16 that we're out. But eventually that would be something that we could look at 17 downstream, is having a maintenance cycle on them.
18 And then end of life disposal is another area that we are 19 going to have to look at as we get further into this. And then as NASA begins 20 to enter its build, test, and development for flight units, obviously we'll begin 21 to engage some of the same activities that DARPA and DOD are doing right 22 now in terms of looking at NEPA, ground testing requirements, transportation, 23 launch operations for (audio interference) as on Earth.
24 And in terms of the Price Anderson, and coverage for 25 activities related to that, a lot of the work that we do is through DOE, and we 26 do that to gain that coverage now from some of our industry participants, and
41 1 activities. And that's the end of my time.
2 CHAIRMAN HANSON: Thank you Dr. Calomino. Thank 3 you all for your presentations. We'll start with questions with Commissioner 4 Baran.
5 COMMISSIONER BARAN: Thanks. Well, thank you all 6 for joining us today, and for presentations on these initiatives, which are really 7 very exciting. Mr. Sample, since the application for Alison Air Force Base 8 micro reactor will be reviewed by NRC, let's start with that one. What's the 9 latest thinking on when the Air Force will select a vendor - is that something 10 you're planning on for later this year?
11 MR. SAMPLE: So, the RFP should come out later this 12 year, so it's probably in the next year, or so.
13 COMMISSIONER BARAN: Okay, and then what's your 14 expectation about how long it would take for the vendor to put together an 15 application for submission to NRC?
16 MR. SAMPLE: I think we have that on that last one, so let 17 me -- just so I don't tell you the wrong thing. We're hoping to get the 18 application by the end of 23.
19 COMMISSIONER BARAN: Okay, so about a year then, 20 basically.
21 MR. SAMPLE: About a year for that, yeah.
22 COMMISSIONER BARAN: And does the Air Force have a 23 view about which NRC regulatory framework would be used for the 24 application? Are you contemplating a Part 50 approach with a construction 25 permit, followed by an operating license? Are you thinking that's going to be 26 up to the vendor - how are you looking at that?
42 1 MR. SAMPLE: We would like to leave it up to the vendor 2 for the moment. I expect that will be the case, but we are going to look at the 3 applications or proposals, and see what they propose. So, we're not putting 4 that as a constraint that you shall follow this, or you shall follow that. We 5 are saying that they will be responsible for going through the NRC process -
6 how they choose to do that is up to them, and that'll be reviewed as part of the 7 proposals.
8 COMMISSIONER BARAN: And what level of pre-9 application engagement between the vendor and the NRC staff are you 10 anticipating? We've seen that where we have really good pre-application 11 engagement like we recently had with Kairos and their Hermes application.
12 That can put NRC in a position to have a shorter review period, and more 13 certainty. Is that something you all are thinking about?
14 MR. SAMPLE: Absolutely. Between the conference, after 15 we release the RFP to -- I mean that will start the game there. But once we 16 do select a vendor, we see a lot of pre-application work between them and us 17 also, all of us as a whole-of-government team. Because we want the 18 application to be good and hit it all right at once.
19 COMMISSIONER BARAN: All right, good. Dr. Waksman, 20 I appreciate your Admiral Rickover slide about how nuclear power is hard, and 21 in some ways, Project Pele is especially hard, right? Because you're 22 contemplating something that's both mobile and could be operated in a 23 battlefield setting. Could you talk a little bit -- probably at a high level, about 24 how DOD is approaching this kind of question of reactor survivability and the 25 hostile conditions of a battlefield? You referred a little bit to the TRISO, is 26 that the primary focus? Are there other ways in which you're looking at
43 1 making it more robust than something that you would see deployed 2 domestically?
3 DR. WAKSMAN: Yeah, so one clarification is that in Army 4 parlance, this is actually not a mobile reactor, it's a transportable reactor.
5 They define mobile, and different agencies define those words differently.
6 Because in Army world, a mobile reactor, you could just plug your cell phone 7 right into the side of the truck and from the highway you can power it, and 8 that's obviously not what we're doing here.
9 In terms of battlefield, so in some sense the whole world is 10 a battlefield. But we do not anticipate these being in a tactical zone. We 11 don't think that's really the best use of these. So, if you envision a front per 12 se, we anticipate being minimum, hundreds of miles, if not thousands of miles 13 behind where that is. Now, obviously anywhere in the world things can be 14 struck. We know our adversaries have missiles that can hit anywhere in the 15 world, that's why we still have to take into account kinetic, in addition there's 16 always the risk of sabotage, terror attack, all of these things are things that 17 we've had to take into account. So, we view this as part of the risk calculus.
18 The Army has a lot of experience having to protect valuable things. They 19 have modular protection systems that are used to protect things, and there's 20 also always going to be the option of taking this reactor, and say trying to bury 21 it underground, something like that. So, the way we view it is we need to 22 provide the data of what a certain threat would do to it, and then the Army can 23 consider where they feel most comfortable deploying it, that they feel confident 24 they won't create a radiological incident.
25 COMMISSIONER BARAN: Okay, that's helpful. And you 26 mentioned the commercial scale TRISO facility at BWXT, can you talk again
44 1 at a high level probably about capabilities volumetrically, and other things 2 there?
3 DR. WAKSMAN: Sure, so I'm sure you guys are very 4 familiar with that facility, it's the same facility where they make the naval 5 reactor cores. It's also the same facility where DOE did the AGR TRISO 6 work. A lot of that equipment was still sitting there, it was mothballed. And 7 so with the money, jointly NASA money and DOD money, along with some 8 incoming work from DOE, we got that equipment back up. We've also bought 9 additional equipment to expand the throughput. Right now we're talking 10 about a through put of maybe a few hundred kilograms a year. It's not a huge 11 throughput, but they have the ability to expand further if there were to be 12 additional demand. There's additional space in the facility that they could buy 13 more equipment and expand the throughput.
14 COMMISSIONER BARAN: Okay, great. And Dr.
15 Calomino, the discussion of the fission surface power effort for the moon and 16 Mars is fascinating. As NASA looks to develop a 40 kilowatt reactor, who is 17 going to handle the safety and environmental reviews and oversight? Is 18 NASA going to do that itself, or is DOE going to take on that role?
19 DR. CALOMINO: Currently we would expect that DOE 20 would handle that role, that NASA would not -- we work in partnership with 21 DOE, but because we are using DOE for coverage on Price Anderson, we 22 would rely on them to be the custodians of what that would be.
23 COMMISSIONER BARAN: Okay. And you mentioned 24 end of life disposal, as you kind of gaze into the future, if one or more of these 25 micro reactors are used on the moon or Mars, what would happen to them 26 after their ten year power production period? Are you envisioning they would
45 1 be left in place or retrieved? Is that something you all are thinking about at 2 this stage, or is it too early to be focused on that?
3 DR. CALOMINO: It's still early to focus on this. I mean 4 certainly we've talked about it, I can tell you what we're not going to do. And 5 that is that we're not going to bring these assets back to Earth. Once a reactor 6 is off Earth and it's away, we're not bringing them back into Earth and running 7 a risk that we would have any kind of public exposure from that.
8 So, a lunar system would stay on the lunar surface, and the 9 question about whether or not it would stay in place, I don't know that that's 10 what we would do. We may very well -- it would still be in an operational area; 11 we may very well move that to another location, another safe location where 12 it would be stored.
13 COMMISSIONER BARAN: Okay, great, thank you very 14 much. Thanks, Chairman.
15 CHAIRMAN HANSON: Thank you Commissioner Baran.
16 Commissioner Wright?
17 COMMISSIONER WRIGHT: Thank you, Chairman.
18 Thats very interesting conversations and presentations, thank you so much.
19 And this is an area that's becoming more and more interesting, and we're 20 getting more and more involved in it every day with our trips and things that 21 we're involved in. Jeff, I want to start with you I guess. So, in licensing the 22 Pele reactor module as a transportation package under Part 71, it's novel, 23 right? And it requires a different way of looking at things, looking at 24 commercial nuclear power, particularly the use of PRA, right? So, do you 25 have any initial sense of what might be the most challenging to address or 26 resolve in these?
46 1 DR. WAKSMAN: Yeah, so I think there's two parts that are 2 going to be challenging. So, one is water inundation is a challenge, because 3 high temperature gas reactors are under moderated, and so you have to be 4 able to show that in any sort of water inundation scenario, that it's not going 5 to go critical. But in addition, a challenge for us is going to be that we do not 6 anticipate being able to meet all the requirements that a traditional spent fuel 7 cask can do. We're not going to take this reactor and drop it from 30 feet.
8 And so when we've been working with the NRC staff at a working level on is 9 okay, how do we modify those and then try to make up for it with some sort of 10 mitigation? And we've talked about the different sort of mitigations that we 11 can do. And I'm not going to get to all them here, and I'd probably miss one 12 if I tried to say it, but that's the perspective that we've been trying to take. And 13 I think the NRC staff has been very helpful in helping to guide us in what would 14 be the right level of mitigation.
15 COMMISSIONER WRIGHT: Very good, yeah, that's very 16 interesting, the mitigation part of it. So, there's been considerable attention 17 on how our advanced reactor regulatory framework, called Part 53, and I'm 18 sure you're familiar with it, and whether or not it's hitting the right mark, in 19 particular with consideration of certain things like again, PRA and ALARA.
20 So, I'd be interested in hearing your perspectives, and the rest of you too if 21 you have any, on what role you see PRA having in smaller micro reactor 22 concepts - a leading role, a supporting role, or anything like that?
23 DR. WAKSMAN: Yeah, I mean I think just the nature of 24 how different these designs are from what's come before. In the past, while 25 the traditional fleet that were all pressurized water reactors, they're all 26 different, but they're all kind of the same. And when you're trying to envision
47 1 how would you regulate, I don't know, a molten salt reactor, it's going to be so 2 different that it seems like you've got to use some sort of probabilistic risk 3 assessment. Try to get all the smart safety folks, and try to come up with 4 everything that could go wrong. What happens if there's an earthquake, what 5 happens if some tree falls on it, what happens if it falls off a bridge into the 6 river? And just figure out what the likelihoods of that are, and what the 7 consequences of it are. I mean I'm hardly an expert in this, I have people a 8 lot smarter than me supporting me on this, but at least to my unfrozen cave 9 man brain, it seems like the way you've got to go.
10 COMMISSIONER WRIGHT: Anybody else? That makes 11 perfect sense to me.
12 MS. HAHN: I would just like to say that for the knowledge 13 that we've gained in the PRA space, incorporating early on in this advanced 14 reactor design is going to be key. The existing fleet uses PRAs, but being 15 able to start early, and incorporating that stuff early on in the design is going 16 to be very helpful.
17 COMMISSIONER WRIGHT: Thank you. So, I'm going to 18 stay with you for a minute. In one of your slides, I think it was 12, if I 19 remember right, but you had like three things that were listed. You noticed 20 some significant regulatory challenges, that's what you were talking about, 21 that would have to be addressed in the area of uncertainty. Can you 22 elaborate a little bit on which one, do you see one of these being more critical 23 to address in the near term? And I guess how, if at all, could the NRC help?
24 DR. WAKSMAN: Well, I would say in terms of regulatory 25 challenges, the challenge is not so much on the first-of-a-kind, because we're 26 using DOE process, that is, I think, fairly well understood. It's how we would
48 1 regulate the Nth of a kind. Because if these are actually being deployed 2 operationally, they're not going to be DOE licensed. So, figuring out how that 3 would be, whether the Army is going to have to -- or whatever service would 4 have to hire up, get their own regulators, or would the NRC license approve 5 the design, and then that way the services could leverage that. I certainly 6 think it would be a lot easier if the services did not have to hire up. I don't 7 think anyone is going to try to create a second Naval reactors.
8 So, being able to leverage the NRC's expertise, and being 9 able to demonstrate that the designs are safe, and to have confidence that the 10 factory that's making these reactors is doing everything up to snuff, then the 11 service can feel confident in it. Now, these are certainly decisions being 12 made later, that a service would have to make if they choose to transition this.
13 But I would think to myself, that the NRC would have to play a large role in 14 that, because the non-Navy services simply don't already have the 15 infrastructure to do that.
16 COMMISSIONER WRIGHT: Yeah. Earlier in your 17 comments, I was watching your reactions on some things, and kind of going 18 at what do you see is the biggest obstacle is what I'm looking for from you 19 here maybe, to get something like Project Pele up to scale, is it the licensing 20 process, is it going to be available resources, or funding, or is there something 21 else?
22 DR. WAKSMAN: I think all those things are major 23 challenges. Obviously funding is a big one. We certainly appreciate the 24 healthy funding that this administration has given us, as well as bipartisan 25 support in Congress. I'm very concerned about supply chain and I am 26 constantly hammering that one. We have heard some unbelievable horror
49 1 stories from other programs.
2 And one of the big things that happens from power point 3 reactor to real reactor is to figure out well who can actually make that? Can 4 someone actually make that? Just because your CAD system can make that, 5 doesn't mean that it can actually be made. And what happens if it's in a 6 radiative environment - is it going to become brittle, is it going to start to fall 7 apart?
8 And this is a way, I think Pele can actually help other 9 reactors. Because I know one of the challenges that other reactors have had 10 is well how do you demonstrate that reactor will be safe in a regime that hasn't 11 been done before? You can model all you want, but if you don't have data of 12 a real reactor, it's a challenge. So, hopefully the data that we collect from this 13 reactor will help facilitate other reactors.
14 COMMISSIONER WRIGHT: Okay, thank you. Alison, 15 good to see you. As I mentioned to you earlier, I was at RPE yesterday, and 16 had a couple hour meeting, great meeting with the team over there and they 17 shared with me all the different projects that they were kind of standing up, 18 and that some of those things might flow through, that NE would be pushing 19 out the door even more.
20 Which kind of brings me to a question that there is a tool out 21 there, and it's from NEICA, the Nuclear Energy Innovation Capabilities Act that 22 was passed, where the possibility would exist if -- so DOE's the promoter, 23 they're the salesman. We're the safety regulator, we've got to be prepared to 24 review anything that comes before us. But the Department of Energy doesn't 25 necessarily have to do that, right?
26 You can pick a winner and if Congress wants to help you,
50 1 they can help fund, where you could fund, maybe pass money along with that 2 project to the NRC in an MOU to review that particular technology, whatever 3 it is. Is that something that y'all are -- is that something that you're looking to 4 maybe get involved in with the NRC on a partnership kind of thing? Where 5 we would dedicate our people to do that through the process, but there would 6 be funding that would come to help the -- I guess it would assist the applicant 7 in a way, right? Because some of them don't have deep pockets.
8 MS. HAHN: I'm sorry, I misunderstood the question.
9 Would it be helpful for NRC to be involved in the process of selecting?
10 COMMISSIONER WRIGHT: No, y'all would -- it's your 11 technology, and then you would say to the NRC, hey we'd like to enter into an 12 MOU, where we're going to send this technology applicant to you to review.
13 But we're going to send some money along with it, but with that money we'd 14 like for you to dedicate your tiger team, core team, whatever, to take this 15 through the process start to finish. In order to try to, I guess gain some --
16 build some time, shorten the timeframe through. Is that something that DOE 17 is looking at doing some of, or more of?
18 MS. HAHN: So, for DOE developed technology, we try to 19 include NRC staff from the very beginning so that we've gotten the feedback 20 early on, we can incorporate any comments, and feedback that NRC is able 21 to give us throughout the process. In terms of providing money for DOE 22 technology to go through a more official NRC review process, which is what I 23 think you're saying, it could be very helpful. We've got a number of codes 24 and technologies that would be very helpful to be NRC qualified or licensed 25 moving forward.
26 COMMISSIONER WRIGHT: Right, because I think that
51 1 might be the purpose of what NEICA was there for. So, just would like to see 2 how that plays out, right?
3 MS. HAHN: Yeah.
4 COMMISSIONER WRIGHT: Thank you Mr. Chairman, 5 that's all I've got.
6 CHAIRMAN HANSON: Thank you, Commissioner Wright.
7 Thanks all again for your presentations. Part of the mission of the NRC is to 8 promote the common defense and security, so our collaboration with DOD, 9 and DOE, and NASA, and others is really critical. I guess I'll start with kind 10 of a high-level question kind of for the three of you, maybe particularly Mr.
11 Sample and Ms. Hahn, the two of you.
12 This actually came from a comment that Dr. Calomino said, 13 which is he said NASA doesn't want to own this. And that made me think 14 back to kind of a payment for milestones approach that I think NASA has taken 15 to commercial launch vehicles. And there's been some thought promulgated 16 by Matt Bowen, and others about applying this to the nuclear realm as well.
17 And it has the potential to apply to NRC, because you can incentivize 18 potentially licensability, or NRC reviews. You get through your environmental 19 review, you get a payment, you get through your safety review with the NRC, 20 you get a payment. Is that something that, as you explore these concepts for 21 deployment, that DOD or DOE has considered for some of these 22 technologies?
23 MS. HAHN: So, the other transaction authority is 24 something that is very intriguing and very interesting. The milestone-based 25 payments, as you said, could be something that's very helpful moving through 26 these awards. It's something that yeah, we're interested in looking at. We
52 1 haven't done it yet at DOE, NE specifically, but we are currently working 2 through a possibility in the near term.
3 MR. SAMPLE: I can't say that we've looked at it specifically 4 for this, but we use other transaction authority across the Air Force for other 5 things. So, it seems like it would make perfect sense to open up to something 6 like this.
7 CHAIRMAN HANSON: Okay. Go ahead Dr. Waksman.
8 DR. WAKSMAN: Sure. So, I was going to mention Pele 9 is an OTA, and as just an interesting historical coincidence, the two people at 10 NASA who were behind the COTS program went to DOD, and started Pele.
11 So, we have, we're cousins with it. And I can tell you that as part of our 12 evaluation and our recent down select, one of the things that the companies 13 were graded on was going to be their ability to meet the NRC requirements 14 for transportation. So, we were evaluating what their transportation plan was, 15 how they were going to apply, and deliver, and that was one of the things that 16 was a significant grading metric.
17 CHAIRMAN HANSON: Great, thank you. Ms. Hahn, 18 you've had, I think in one of your slides talking about helping fill regulatory, 19 and technical risk, particularly with some of the facilities out at Idaho. And I 20 think from an NRC perspective, that kind of thing is absolutely valuable, 21 absolutely critical. Filling those gaps with experimental and real world data 22 as much as possible. I was just wondering if you could kind of talk about, get 23 a little more specific, and give us some examples of that work.
24 MS. HAHN: Absolutely. So, the DOME test bed and the 25 LOTUS test bed that NRIC is hosting will provide that real world data to some 26 of the concepts that are coming in. For example, we've got the MCRE reactor
53 1 led by Southern that will go into the LOTUS test bed to operate and provide 2 that data for you for the commercial design later on, so that's one example.
3 Another example is the MARVEL test platform that I 4 mentioned. We're developing that test -- the nuclear driven test platform, but 5 we're going to also connect it to these end use applications. And there's a lot 6 of discussion about what can nuclear do besides electricity production, but we 7 haven't done it quite yet. DOE has a couple hydrogen demonstrations, I think 8 at four operating facilities, weve awarded so far. But what else can we do?
9 What else are the options? And so having that platform for other industries 10 not usually tied to nuclear come in, connect it to a nuclear driven platform, and 11 demonstrate that the capability is there, and achievable. Those are just two 12 examples.
13 CHAIRMAN HANSON: Yeah, that's great, thank you. One 14 of the things I noticed was, I think the micro reactor test bed for the 40 that 15 you have, as well as MARVEL, those were going to be ready in kind of the 16 2024 timeframe. That 2024 is a critical year for Mr. Sample's project as well, 17 and just kind of, because a lot of the engagement that you're going to have at 18 Idaho, the technologies that are going to come off that then are going to be 19 potentially available for Mr. Sample. So, maybe the two of you can just kind 20 of talk about how that's -- and it implies us as well, maybe you can talk about 21 how you think -- see that syncing up.
22 MS. HAHN: We're trying to work very closely with all of our 23 partners, industry, and other government entities to identify their needs, and 24 make sure that our capabilities are there and ready and supporting them. I 25 don't know if you have anything else to add.
26 MR. SAMPLE: Nothing to say, other than we are
54 1 completely dependent on both these people. We feel like we're taking all 2 their hard work, and we'll take credit for it later. But with that said, no, 3 MARVEL, we're already talking about a trip up to see it in two months, or so, 4 yes. We love all the stuff they're doing, and we're working as a whole 5 government -- the things we learn as we go through, feed them back to our 6 teammates to help the development of that.
7 CHAIRMAN HANSON: Okay. Is transportability -- not 8 mobility - is transportability a criteria in the RFP for the Alison project?
9 MR. SAMPLE: Currently the Department of the Air Force 10 is not really looking at transportability. Part of that is the way we operate. The 11 Department of the Air Force and completely, the Space Force, our installations 12 are our power platforms. Until we come up with a nuclear airplane, our 13 forward deploy stuff are kind of dependent on jet fuel. So, we do our 14 operations from the U.S. or from our installations, wherever they are. Not 15 that we're going to benefit from the mobile, even if it's something we just take 16 and park, but that's not a component in our application at the moment.
17 CHAIRMAN HANSON: Thank you. Dr. Waksman, the 18 international engagements that the NRC has are really important, not only to 19 the U.S. government kind of writ large, but also here, our work with both very 20 mature regulators around the world, but also kind of embarking countries, and 21 capacity building is really critical. So, I'm thinking about the deployment of 22 Pele down the road.
23 And how important is acceptability outside the continental 24 United States for one of these reactors? And kind of, is there a role there for 25 NRC to engage international partners on maybe standing up a regulatory 26 framework or an oversight framework? I don't know what -- I'm not sure what
55 1 we want to call it yet, but have you all thought a little bit about that into the 2 future?
3 DR. WAKSMAN: Yes, so as a historical thing, one of the 4 reactors that the Army had in the 50s' and 60s was Project Iceworm in 5 Greenland. And my understanding is that they initially installed up there 6 without informing the Danish government, and the Danish government was 7 not happy when they found out. And that is not the way the DOD operates in 8 the 21st century, whatever century we're in.
9 Yeah, so we've been thinking a lot about that. And so we 10 were tasked by Congress in the 21 NDAA to do a report about a number of 11 things, which included international issues, and we've been working closely 12 with the NRC staff, and OSD policy, and State Department to develop that out.
13 And I think part of the conclusion is that we are in a grey area. Is this a 14 submarine? Is this an export? I don't think it's an export, but these are 15 things that I think have yet to be 100 percent decided. So, the nature of our 16 report is not going to be to tell everybody what all the answers are, but to 17 simply establish the questions and the options. And I think this will need to 18 be continued to be discussed. I think the Aukus is a really important 19 pathfinder for us. And in our engagement with the State Department, they 20 are continually tying Pele to Aukus. It's obviously a bit different, but there are 21 a lot of similarities to it. So, I think a lot of that is going to be TBD.
22 CHAIRMAN HANSON: Yeah, well the NRC is happy to 23 contribute, particularly on Aukus, where we're talking to our regulatory 24 counterparts, sometimes we've got overlapping and sometimes separate 25 regulatory responsibilities, but there's a lot of creative thinking yet to be done, 26 so I hope we can participate in that.
56 1 I also hope that we can participate or inform some of the 2 personnel issues. You were talking about the operations core potentially 3 being lodged in the Army Corps of Engineers. Finding qualified people 4 across the industry for NRC with our agreement states, and even I've had 5 these discussions internationally, is really critical. Certified health physicists, 6 radiation protection people, so it's not just operators, et cetera.
7 Is there a kind of strategic work force plan that's in the works 8 at DOD, that maybe DOE is informing? We spend a lot of time on work force 9 planning here just for our own needs, let alone needs kind of more broadly out 10 there in the world.
11 DR. WAKSMAN: Yes, I can tell you in our case, so for 12 putting together our training plan, we've actually hired a long time NRC 13 employee to help put that together.
14 CHAIRMAN HANSON: Excellent.
15 DR. WAKSMAN: And we continue to engage with the NRC 16 on that, and certainly we appreciate the help on that. In terms of work force, 17 I'd say in general the nuclear industry has a shortage of people right now. I 18 know the NRC is struggling with a shortage of people, I know Naval reactors 19 is struggling, every company is just hiring from each other, it's a zero sum 20 game. And so if there are any undergraduates listening right now, now's a 21 very good time to go into nuclear engineering grad school. But it's definitely 22 a challenge that we are taking seriously, and we are focusing on it.
23 CHAIRMAN HANSON: Great, thank you. All right, well I 24 think that -- go ahead Alison.
25 MS. HAHN: I was just going to mention Department of 26 Energy has that nuclear energy university program, which provides
57 1 fellowships, and scholarships not just to four-year institutions, but also trade 2 schools, and community colleges as well to help with the PhDs, master's 3 program, but also some of the trades that we need in the industry as well.
4 CHAIRMAN HANSON: Great. Well, and we've got the 5 university nuclear leadership program here to do both faculty development, as 6 well as support students. And we're looking at hopefully to expand that to 7 minority serving institutions. Kind of no brain left behind when it comes to 8 nuclear these days, so really appreciate that. All right, well I think we've come 9 to the end of our time. Again, really appreciate your presentations.
10 I would like to take the opportunity to recognize we have a 11 number of foreign assignees here from Poland, I'd like to recognize them.
12 We're going to be hosting them for lunch here in just a little while. They are 13 here in the United States for some on the job training from both the Polish 14 Atomic Authority, as well as their industrial regulator.
15 They're here at headquarters. They're going down to our 16 technical training center is Chattanooga, Tennessee, as well as to visit the 17 Vogtle construction site, and get some, like I said, on-the-job training. Our 18 relationship with Poland now goes back probably a decade, and helping them 19 on their path, and building a robust regulatory entity is a high priority both for 20 the NRC and the U.S. government writ large.
21 So, I'd like to welcome them, and recognize them this 22 morning, I'm glad they could join us for a Commission meeting. With that, I 23 want to thank you all again. I am really gratified, I think, by the level of 24 coordination, and the partnership we have with you all, with NASA, and glad 25 we could do this, thanks again for coming to Rockville. Mr. Calomino, I'm 26 sure we'll see you in person here at some point, thanks for --
58 1 DR. CALOMINO: Yes, I hope to be there in person the next 2 visit.
3 CHAIRMAN HANSON: No worries at all. Thanks to my 4 colleagues. As usual, we've covered a lot of real estate this morning, and 5 with that we're adjourned.
6 (Whereupon, the above-entitled matter went off the record 7 at 11:41 a.m.)
8 9
10 11 12 13 14 15 16