Letter Sequence Other |
---|
|
|
MONTHYEARML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept Project stage: Other 1983-08-18
[Table View] |
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:QUICK LOOK
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] |
Text
!
l E~l Lawrence Livermora National Laboratory i o
, INTERIM REPORT NRC TAC No(S). 8501, 8500 REPORT No. UCID-xxxx COfffRACT PROGRAM OR PROJECT TITLE:
Selected Operating Reactor Issues Program 11 Sua)ECT OF THIS DOCUMENT: .
Technical Evaluation Report on the Proposed Technical Specification Changes for the Inservice Surveillance of Safety-Related Hydraulic and Mechanical Snubbers at the Peach Bottoc Atomic Power Station, Units 2 and 3 TYPE OF DocuMarr:
Informal Report AUTHOR (S):
James C.'Selan - - - - - - - - - - - - - - - - -
DATE OF DOCUMENT: -
August 18, 1983 RESPONSIBLE NRC Iro1VIDUAL AND NRC OFFICE OR DIVISION:
Harold Gregg, NRC Region I This document pas prepared primarily for preliminary or internal use. It has not raccived full review and approval. Since there may be substantive changes, thic document should not be considered final.
Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C.
Under DOE Contract No. B&R201910111 NRC FIN No. A0250 0309120290 030025 PDR ADOCK 05000277 P PDR umve,urorc.uom,. INTERIM REPORT L:wr:ece Uvermore Navone'L.boratory P.O. Box 4 $
Mercury. Nevac. 89023
UCID-TECHNICAL EVALUATION REPORT ON THE PROPOSED TECHNICAL SPECIFICATION CHANGES FOR THE INSERVICE SURVEILLANCE OF SAFETY-RELATED HYDRAULIC AND MECHANICAL SNUBBERS AT THE PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (Docket Nos. 50-277, 50-278)
James C. Selan August 18, 1983 0
3 8 h
, y :n%,7yggy
- ~;;J. ' ?; e. &
- n; k;s%} ;;;fx;PkOMf? 2*' %?g..n;;gggggy%yhfogQ ,.
a'. w
%%^L
,ww 9 4oyo j _ ;,-- - - --- - _- d_"Mtr ' aqgy ,; ., .
a ._ __
.meyw g,4 .ga
- iMM> 3 m..
Y AM8 This is an informal report intended primarily for internal or limited external distribution. Js.my#1Q(
g sf.y@m ,p= P The opuuons and conclusions stated are those of the author and may or may not be those '.7f{3j[
jfi:j3%
of the Laboratory. #^"' :e- -#
"Q d[: .,W'@'
3 This work was supported by the Urtited States Nuclear Regulatory Commission under u a \lrmorandum of Understanding with the United States Department of Energy. N'M; 7-:gy;@g;y%f46 .,
- ^-. . g w SRC TIN No. A-0250 d ~~
+w<.Mw
t ABSTRACT J
This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveil-lance Requirements and Bases for safety related hydraulic and mechanical snub-bers at the Peach Bottom Atomic Power Station, Units 2 and 3. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee 's submittal with the NRC requirements and includes ' Proposed Resolution' of the ' Deviations'. The licensee 's proposed Technical Specification changes, when modified to complete each Appendix A ' Proposed Resolution' in a manner acceptable to the NRC staff, will either provide conformance to the Standard Technical Specification or will provide justification for the deviations.
1 FOREWORD This report is supplied as part of the Selected Operating Reactor 3 Issues Program II .being conducted for the U. S. Nuclear Regulatory Commission, through the Of fice of , Nuclear Reactor Regulation, Division of Licensing, for i NRC Region 1, by Lawrence Livermore National Laboratory.
j The U. S. Nuclear Regulatory Commission funded the work under the j authorization entitled " Selected Operating Reactor Issues Program II,"
t B6R 20 19 10 11 1, FIN No. A-0250.
i i
n
-t-
% i l
1 1
l i
TABLE OF CONTENTS Page
- 1. INTRODUCTION . . . . . . . . . . . . . . . 1
- 2. REVIEW BASIS CRITERIA . . . . . . . . . . . . 2
- 3. EVALUATION . . . . . . . . . . . . . . . 2 4 CONCLUSION . . . . . . . . . . . . . . . 3 REFERENCES . . . . . . . . . . . . . . . . 4 APPENDIX A . . . . . . . . . . . . . . . . 5 6
-111-
TECHNICAL EVALUATION REPORT ON THE PROPOSED TECHNICAL SPECIFICATION CHANGES FOR THE INSERVICE SURVEILLANCE OF SAFETY-RELATED HYDRAULIC AND MECHANICAL SNUBBERS AT THE PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (Docket Nos. 50-277, 50-278)
James C. Selan Lawrence Livermore National Laboratory, Nevada
- 1. INTRODUCTION The operability of snubbers is required to provide assurance that the structural integrity of the reactor coolant system and all other safety-related systems is maintained during and following a seismic or other event initiating dynamic loads. The operability is verified by an inservice inspec-tion and testing program specified in the plant's Technical Specifications (TS). Recent operating experience has indicated the need for changes, clar-ifications, and improvements in the inservice surveillance requirements for hydraulic snubbers and to include similar requirements for mechanical snubbers.
By letter dated November 20,1980 (Ref.1], the NRC requested that all power reactor licensees (except SEP licensees) incorporate the revised model NRC Standard. . Technical Specifications (STS) into the plant specific TS for hydraulic and mechanical snubbers. A similar request was sent to the SEP licensees in a letter dated March 23, 1981 (Ref. 1).
The NRC model STS requires that a visual inspection frequency be based upon maintaining a constant level of snubber protection to the safety-related systems. Additionally, in order to provide assurance that the hydraulic and mechanical snubbers function reliably, a representative sample of the plant's installed snubbers will be functionally tested at least once per 18 months during plant shutdowns. The required sampling provides a confidence level of 95% that 90% of the plant specific snubbers will be operable within acceptable limits.
By letters dated March 24, 1981 [Ref. 2), August 6, 1981 (Ref. 3],
and December 13,1982 [Ref. 4), Philadelphia Electric Company (PECO), the licensee, submitted proposed TS changes to incorporate an inservice inspection and testing program for the safety-related hydraulic and mechanical snubbers at the Peach Bottom Atomic Power Station, Units 2 and 3. These proposed changes to the TS Limiting Conditions for Operation (LCO), Surveillance Requirements, and Bases were discussed during an NRC/ licensee meeting on June 21, 1983
[Ref. 5].
The purpose of this report is to evaluate the proposed TS changes with respect to the review basis criteria to determine that they meet the NRC requirements.
4
- 2. REVIEW BASIS CRITERIA The review criteria that were applied in determining the accept-abliity of the inservice surveillance requirements for the operability of the safety-related snubbers are contained in the following:
(1) Generic letter from D. G. Eisenhut to all Power Reactor Licensees (except SEP licensees) dated November 20, 1980, with enclosed Standard Technical Specifications (STS) Snubber Surveillance Requirements.
(Criteria also applicable to SEP Licensees based on March 23, 1981 NRC letter.) [Ref. 1].
(2) Technical Specifications and Bases for Snubbers as incorporated in the McGuire Units 1 and 2 and Byron Unit 1 plant Technical Specifications:
TS 3/4.7.8 [Ref. 6].
(3) NRC memorandum, L. Engle (Lead PM) to G. C. Lainas, AD/OR, DL, " General Guidance (Region I thru V) for MPA Items b-17 and B-22, Hydraulic and Mechancial Snubbers, Respectively, for Technical Specification Surveillance Requirements," dated March 2, 1983 [Ref. 7].
- 3. EVALUATION The NRC generic letter [Ref.1] STS enclosure stated the requirements that were to be incorporated in the plant's TS. The STS was reviewed and a check list of STS requirements was developed and is presented in Appendix A.
Appendix A was used as a check list for the data comparison of the licensee's proposed TS to the NRC model STS. The check list-describes the requirements with a 'YES' or 'N0' column that is marked to indicate conformance or nonconformance. When a 'N0' is marked, the ' Deviation and Resolution,' or
' Proposed Resolution' is described. A ' Resolution' requires no further licensee action and provides the explanation. A ' Proposed Resolution' requires further licensee action and describes the action needed to resolve the deviation. Also
. found in the check list are ' Remarks' which are used for additional clarification.
These items were discussed during the NRC' licensee meeting [Ref. 5].
During the meeting, the NRC staff representative explained how the licensee could either provide conformance to the STS by revising the proposed TS or provide an acceptable justification for the deviation. During the discussion there were instances where the licensee's representatives agreed to revise the proposed TS changes, or desired to review the TS to see how confor=ance could be obtained, or desired not to modify the TS. In all cases the ' Proposed l
Resolution' contains the NRC described dual option to modify the TS to be l
consistent with the STS or to provide justification for the deviation even if not explicitly stated. Also, in each of these cases a ' Proposed Resolution' is identified, and a written resubmittal is required from the licensee.
Completion of each ' Proposed Resolution', in a manner acceptable to the NRC staf f, will either bring the plant's TS for snubbers into conformance with the STS or will provide justification for the deviations. The proposed LCOs will then contain the correct identification of snubbers required to be operable, applicable modes of operability, and action with one or more snubbers inoperable. The proposed Surveillance Requirements will then contain an aug-mented inservice inspection program which includes scheduled visual inspections and functional testing of a representative sample.
- 4. CONCLUSION Based on the information submitted by PECO for the Peach Bottom Atomic Power Station, Units 2 and 3, it is concluded that the proposed TS for snubbers, when modified to complete each Appendix A ' Proposed Resolution' in a manner acceptable to the NRC staf f, will either provide conformance to the STS or will provide justification for the deviations. - - - -
f REFERENCES
- 1. NRC letter (D. G. Eisenhut) to all power reactor licensees (except SEP licensees), dated November 20, 1980 and NRC letter (D. G. Eisenhut) to all SEP licensees, dated March 23, 1981.
- 2. PECO ler. (E. J. Bradley) to the NRC (H. R. Denton), dated arch 24, 1981.
- 3. PECO ltr. (E. J. Bradley) to the NRC (H. R. Denton), dated August 6,1981.
- 4. PECO ltr. (E. J. Bradley) to the NRC (H. R. Denton), dated December 13, 1982.
- 5. Meeting of June 21, 1983; W. Birely, W. Alden, and J. Nagle of PECO, H. Gregg and D. Haverkamp of NRC Region 1, and J. Selan and R. White of LLNL.
- 6. Technical Specifications and bases for snubbers as incorporated in the McGuire Units 1 and 2 and Byron Unit 1 plant Technical Specifications (3/4.7.8). -
- 7. NRC memorandum, Leon B. Engle to Gus C. Lainas, dated March 2, 1983.
I l .
l
APPENDIX A SNUBBER SURVEILLANCE PEACH BOTTOM, UNITS 2 AND 3 Data Comparison of Licensee Proposed TS Versus NRC Model STS
REFERENCES:
(1) PECO ltr. (E. J. Bradley) to the NRC (H. R. Denton), dated March 24, 1981.
(2) PECO ltr. (E. J. Bradley) to the NRC (H. R. Denton), dated August 6,1981.
(3) PECO ltr. (E. J. Bradley) to the NRC (H. R. Denton), dated December 13, 1982.
(4) Meeting of June 21, 1983; W. Birely, W. Alden, and J. Nagle of PECO, H. Gregg and D. Haverkamp of NRC Region 1, and J. Selan and R. White of LLNL.
YES NO I. LCOs A. All snubbers listed required to be operable X B. Mechanical / hydraulic types designated in separate tables X Deviation: The licensee 's proposed TS Table'7.11.D.Tidenti ---~~-
fies both hydraulic and mechanical snubbers in a common table with an'H or M designation.
Resolution: This meets the STS intent for identifying snubber types (Ref. 4).
C. Modes of applicability include modes 1-4 (and modes 5, cold shutdown and 6, refueling) X Deviation: The licensee 's proposed TS 3.11.D.1 does not include the cold shutdown and ref ueling modes of applica-bility per the STS.
Proposed Resolution: Change the TS to include the STS modes of applicability and delete TS 3.11.D.3 [Ref. 4).
D. Inoperable snubbers replaced or operability restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and X Deviation: The licensee 's proposed TS 3.ll.D.2 for LCO action requirements were not stated per the STS.
Proposed Resolution: Change the TS to conform with the STS action requirements while maintaining the word structure consistent with the plant's existing TS word structure (Ref. 4).
~5-
YES NO E. Engineering evaluation on the supported components within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> cg; X Deviation: Same as I.D above Proposed Resolution: Same as I.D above F. Follow appropriate action statements for the supported X system Deviation: Same as I.D above Proposed Resolution: Same as I.D above G. Snubbers may be added to the table without prior license a mend rent request etc. (as in STS table footnotes) X H. Modifications to the table in high radiation zone column can be made without prior license amendment request etc.
(as in STS table footnotes) X l
Deviation: The licensee's proposed TS do not include the STS provision for modifying the table for snubbers listed in "High Radiation Zones During Shutdown. "
Resolution: The licensee does not specifically list snubbers in "High Radiation Zones During Shutdown," therefore this provisi'o'n is not needed (see also II.E.5) [Ref. 4]..
II. SURVEILLANCE REQUIREMENTS A. Each snubber demonstrated operable by an augmented inservice inspection program and X Deviation: The licensee 's proposed TS 4.ll.D does not include the general STS statement f or an augmented inser-vice inspection program.
Proposed Resolution: Include the appropriate STS statement and ref erence existing inservice surveillance requirement TS 4.6.G.
B. The requirements of Specification 4.0.5 or equivalent are referenced X Deviation: ' Same as II.A above Proposed Resolution: Same as II. A above
YES NO C. Visual Inspection
- 1. First inspection interval defined (not applicable for N/A reactors in operation > 2 yrs)
- 2. Second interval defined (12 months + 25%) if less than two found inoperable in first interval (not N/A applicable for reactors in operation > 2 yrs)
- 3. Subsequent inspection intervals defined X Deviation: The licensee 's proposed TS 4.ll.D.1 does not contain the STS statement " provisions of Specifi-cation 4.0.2 are not applicable." with respect to the inspection interval schedule.
Proposed Resolution: Provide an equivalent statement which references TS 1.0 DEFINITIONS [Ref. 4].
- 4. Inspection intervals not lengthened more than one step at a tire X
- 5. Snubbers categorized into accessible / inaccessible groups and inspected independently X D. Visual inspection acceptance criteria
- 1. No visible indication of damage / impaired operability X
- 2. Attachments secure X
- 3. Manual inducement for freedom of movement X 4 Inoperable snubber determined operable, provided
- a. Cause of rejection is established & remedied for that snubber and others generically susceptibl.e, and X
- b. Functionally tested in as found condition and determined operable X
- 5. Open fluid ports cause for inoperability X
- 6. Common fluid reservoirs addressed for inoperability (not applicable if. common reservoir not used) N/A
_7_
l l YES NO l E. Functional Tests i
- 1. Once per 18 months during plant shutdown X Deviati on: The licensee 's propcsed TS 4.ll.D.4.a states "once each refueling cycle". Also, TS 4. ll.D.4.a pro-poses an interim delay in mechanical snubber testing.
Proposed Resolution: Change the surveillance frequency to "once each operating cycle during shutdown" which meets the STS requirement. Als o , revise the time exten-sion and provide an appropriate basis for the deferral of the nechanical snubber tests [Ref. 4].
- 2. 10% of each type tested in place or in a bench test X Deviation: The licensee 's proposed TS 4.11.D.4.e exempts testing of snubbers of > 50,000 lb. capacity.
Proposed Resolution: Delete TS 4.11.D.4.e [Ref. 4].
- 3. 10% additional of that type for each snubber f ailing test X 4 25% of sample selected from the 3 defined areas X
- 5. Sn'ubbers identified as "especially dif ficult to remove" or in "high radiation zones during shutdown" and included in test samples X (See Remarks)
Re marks : Snubbers are not specifically designated "yes" or "no" in the high radiation zone column of the table, but TS 4.11.D.4.d states that snubber; in both high radiation zone and difficult to remove shall be included in the test sample [Ref. 4].
- 6. Footnote statement regarding permanent or other execptions . . . . may be granted, etc. included X Deviation: The licensee's proposed TS does not include the STS footnote statenent addressing exemptions.
Resolution: TS 4.ll.D.4.d does include provisions for addressing snubber exemptions, therefore, the footnote statement is not required [Ref. 4].
- 7. Retesting of previous f ailed snubbers and i replacements X
)
- 8. Testing of all snuhbers where any one failed and was determined generic X j l
I
YES NO
- 9. Inoperable snubbers require Engineering evaluation perf ormed on supported components X F. Hydraulic snubbers functional test acceptance criteria
- 1. Activation (restraining action) is achieved within specifications of velocity and acceleration in both compression / tension X
- 2. Snubber bleed rate within specified range X
- 3. Snubbers required to not displace are verified X G. Mechanical snubbers functional test acceptance criteria
- 1. Force for free movement is < specified max drag force. Drag force has not increased >50% X
- 2. Activation (restraining action) is achieved within specifications of velocity and acceleration in both compression / tension X
. 3. Snubber release ' rate within specified-range X _
4 Snubbers ' required to not displace are verified X H. Snubber service lif e monitoring
~~
- 1. Records of service life maintained Deviation: The licensee's proposed TS do not include a service life monitoring program.
Proposed Resolution: Include a service life monitoring program consistent with the STS requirements [Ref. 4].
III. BASES A. Adequate explanation in Bases X Deviation: The licensee's proposed TS 3.ll.D Bases are not consistent with the STS Bases.
Proposed Resolution: Revise the Bases to be consistent with the proposed LCO and Surveillance Requirement changes (Ref. 4].
-