ML20083A462

From kanterella
Revision as of 07:49, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Addendum to Application for Amend to Licenses DPR-57 & NPF-5,forwarding NEDO-30059, Power Operation of Hatch 1 & 2 Reactors W/O Forced Recirculation, Inadvertently Omitted from 831128 Application
ML20083A462
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/12/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20083A202 List:
References
NED-83-612, TAC-53306, TAC-53307, NUDOCS 8312200294
Download: ML20083A462 (1)


Text

____ _ _ _ _ _ _ _ _ _ _ _ _ _ .

Georgia Pcwer Compr.ny 333 Pedmont Avenue Atlanta. Georg'a 30308 Y" Te'ephone 404 $26-6526 MaAng Address-Post Offsce Box 4545 l

I At'anta, Georgia 30302 b Georgia Power L T. Gucwa the southem entre snrem Managm Nuc! car Engineenng NED-83-612 and Chief Nucient Engneer December 12, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 NRC DOCKm'S 50-321, 50-366 OPERATIE LICENSES DPR-57, NPF-5 EIMIN I. HATCH NLCIEAR PLANP UNITS 1, 2 ADDENDEM TO REQUEST FOR TTHNICAL SPECIFICATION CHAN3E ALLOWIE PLANP OPERATION WITHOUP FDRCED RECIRCULATION FLOW Gentlemen:

By letter dated November 28, 1983 Georgia Power Conpany (GPC) proposed an amendment to the Edwin I. Hatch Units 1 and 2 Technical Specifications (Appendix A to each Operatirg License) which would allow plant operations for up to 30 minutes without forced recirculation flow. This subnittal referenced the General Electric Conpany (GE) document NEDO-30059, Class I, February 1983, " Power Operation of the Hatch 1 and 2 Reactors Without Forced Recirculation."

GPC had intended to include the GE document as part of the November 28, 1983 submittal, however it was inadvertantly not enclosed. Therefore, NEDO-30059 is hereb/ enclosed for use by the NBC as part of the review of the above mentioned Technical Specification change proposal.

Pursuant to the requirements of 10 CFR 50.92, J. L. Ledbetter of the Georgia Department of Natural Resources will be sent a copy of this letter and the enclosure.

Sincerely yours:

P O O O3h1 PDR L. T. Gucwa Chief Nuclear Engineer CBS Erclosure xc: H. C. Nix, Jr.

Senior Resident Inspector J. P. O'Reilly, (NBC-Region II) d[

J. L. Iedbetter l