ML20080J798
| ML20080J798 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/06/1984 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NED-84-046, NED-84-46, TAC-53306, TAC-53307, NUDOCS 8402150197 | |
| Download: ML20080J798 (1) | |
Text
Georgia Power Corrpany 333 Piedrnont Avenue Atlanta. Georgia 3tV08
- Tekmhone 404 5266526 Mamng Addrest Post Oftce Box 495 Atlanta, Georg;a 30302 Georgia Power L T. Gucwa r4 s, urton e4* fnc sem Manager Nuclear Engineanng and Chief Nuclear frgneer NED-84-046 February 6,1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 WITHDRAWAL OF RD]UE5f FOR TECHNICAL SPECIFICATION CHANGE ALIDWING PLANT OrtxATION WIDiClTT FORLtu RECIRCULATION FLOW Gentlemen:
By letter dated November 28, 1983, Georgia Power Company proposed an amendment to the Plant Hatch Units 1 and 2 Technical Specifications (Appendix A to the Operating Licenses).
This amendment would have changed requirements to allow plant operations for up to 30 continuous minutes without forced recirculation flow.
This proposal is hereby withdrawn froin further consideration by the NRC at this time.
Very tnily yours:
% (%-/w L. T. Gucwa Chief Nuclear Engineer CBS xc:
H. C. Nix, Jr.
Senior Resident Inspector
[00l J. P. O'Reilly, (NRC-Region II) llO 8402150197 840206 PDR ADOCK 05000321 P