ML20115A428

From kanterella
Revision as of 06:32, 23 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Submits Proposed Wording Revs to 920918 Application for Amends to Licenses NPF-68 & NPF-81 Re Antitrust License Conditions,Per Telcon W/Nrc
ML20115A428
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/07/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115A431 List:
References
ELV-04070, ELV-4070, TAC-M84531, TAC-M84532, NUDOCS 9210140288
Download: ML20115A428 (2)


Text

7 .

Georga power Company

, . 40 Irwernets Ccnter Parkwaf ofy,t Off.ce IW 1295

.Bergom. Alaba rd 35201 T&p%>ne ?C5 8771122 C. K. McCoy Georgia Power Vce Present NMer vcen nw n ~~wecu>~

October 7, 1992 Docket Nos. 50-424 ELV-04070 50-425 TAC M84531 a84532 U. S. Nuclear Regulatory Ccmmission ATIN: Document Control Desk Washington, DC 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT REVISION TO LICENSE AMENDMENTS APPLICATION SOUTHERN NVCLEAR TO BECOME THE LICENSED OPERATOR On September 13, 1992, Georgia Power Company (GPC) submitted proposed amendments to Facility Operating License Nos. NPF-68 and NPF-81 which would authorize Southern Nuclear _ Operating Company, Inc. (Southern Nuclear) to become the licensed operator and have exclusivo responsibility and control over the physical construction, operatten, and maintenance of Vcgtle Electric Generating Plant, Units I and 2.

As a result of telephone conversations between GPC and the NRC, GPC is now proposing wording revisions to the changes to the, Facility Operating Licenses Nos. NPF-68 and NPF-81. Tnese wording revisions, which are provided in the attachments, with respect to the antitrust license conditions, do not have any impact on the application or the significant hazards consideration evaluation provided in the September 18, 1992 submittal and are made for better clarity and precision.

Accordingly, Georgia Power Company hereby concurs with and transmits the revisions discussed with the MC. Associated pages from the marked-up operating licenses in the SepRmber 18, 1992 submittal should be removed and replaced with the revised pages which are provided in Attachment 1.

r b gd*S s

9210140288 921007 PDR ADOCK 05000424 b

P pop gigi

4 .

m4

- ( ..icorgia Powel E.

U. S. Nuclear Regulatory Commission ELV-04070 Dage 2 in accordance with the requirements of 10 CfR 50.91, a copy of this letter and its attachmer,t will be sent to Mr. J. D. Tanner of the Environmental Protection Division of the Georgia Department of Natural Resources.

Sincerely,

/

C. K. McCoy CXM/JDK Sworn to and subscribed before me Attachment this 7 day of Oc# , 1992.

Notary Public "h]k(LAq L{}, t1L[bti cc: Geotoia Powei Company W Cu % s n w a s us Q

-m Mr. R. P. Mcdonald, Executive Vice President Mr. W. B. Shipman, General Manager - Plant Vogtle NORMS U. S. Nuclear Reculatory Commission. Washinoton. DL Mr. D. S. Hood, Licensing Project Manager - Vogtle U. S. Nuclear Reculatory Commission. Reaion 11 Mr. S. D. Ebneter, Regional Administrator Mr. B. R. Bonser, Senior Resident Inspector - Vogtle State of Gecrcia Mr. J. D. Tanner, Commissioner, Department of Natural Resources l

twns

.