TAC:52483
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Open | |
Questions Answers Results
Other: ML20080Q819, ML20081B157, ML20081K549, ML20083C544, ML20083C551, ML20083H377, ML20129E491 | |
From | |
MONTHYEARML20080Q8191983-10-0505 October 1983
[table view]Notifies That Plans Being Developed for Replacement/Insp of Main Recirculation Stainless Steel Piping During Outage Tentatively Scheduled to Begin Jan 1984.Summary of Plans Provided.Proposed Outline Encl ML20078H6221983-10-0505 October 1983 Provides Schedule for Plant Outages & Activities Associated W/Recirculation Piping Insp Required by IE Bulletins 82-03 & 83-02,as Discussed at 830928 Meeting W/Nrc.Replacement of Piping Planned for Unit 2.Viewgraphs Encl ML20081B1571983-10-20020 October 1983 Proposed Tech Spec Re Cooling & Protection of Fuel in Reactor Vessel After Removal of All Fuel ML20081B1481983-10-20020 October 1983 Application for Amend to License NPF-5,consisting of Tech Spec Change Request Revising Applicability of Limiting Condition for Operation of Sys & Instrumentation Associated W/Cooling & Protection of Fuel ML20081K5441983-11-0707 November 1983 Forwards Recirculation Piping Replacement Rept, Describing Reactor Coolant Recirculation Sys Piping to Be Replaced During Jan 1984 Outage.Application for License Amend Submitted 831020.Replacement Involves NSHC ML20081K5491983-11-0707 November 1983 Recirculation Piping Replacement Rept ML20082D2721983-11-16016 November 1983 Withdraws 831020 Application to Amend Tech Specs,Changing Applicability of Limiting Conditions for Operation of Sys & Instrumentation Associated W/Cooling & Protection of Fuel in Reactor Vessel ML20082F3671983-11-21021 November 1983 Application for Amend to License NPF-5 to Allow RCPB Piping Replacement During Outage Commencing in Jan 1984.NSHC Determination & Safety Evaluation Encl ML20082E5941983-11-23023 November 1983 Revised Application to Amend License NPF-5,replacing RCPB Piping.Submittal Clarifies 831121 Amend Proposal & Amplifies Basis for Determination of No Involvement of Significant Hazard ML20083C6311983-12-16016 December 1983 Withdraws Proposed Amend to License NPF-5 Per 831201 Meeting.Piping Replacement Will Be Performed Under Provisions of 10CFR50.59.Appropriate Reviews & Analyses Will Be Documented & Maintained for NRC Audit ML20083C5511983-12-20020 December 1983 Rev 1 to Recirculation Piping Replacement Rept to Nrc ML20083C5441983-12-20020 December 1983 Forwards Rev 1 to Recirculation Piping Replacement Rept to NRC, Consisting of Editorial & Listed Substantive Changes to 831107 Submittal.No Unreviewed Safety Question Identified ML20083H7621983-12-27027 December 1983 Forwards Response to NRC Questions Re Radiological Aspects of Recirculation Pipe Replacement Project Raised During 831206 Telcon.Job Description Draft Encl ML20083H3771984-01-0606 January 1984 Confirms 840105 Telcons W/Nrc Re Recent Developments Concerning Plans to Replace Recirculation Sys Piping. Scheduled Shutdown Delayed for Wk or Later Date in Jan,Due to Delay in Fabrication of Piping ML20129E4911985-06-28028 June 1985 Forwards Project Completion Addendum to 831107 Rept Re Replacement of Main Recirculation & Attached Sys Piping During 1984 Maint/Refueling Outage 1983-11-07 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:52483&oldid=3461120"