Forwards Rev 1 to Recirculation Piping Replacement Rept to NRC, Consisting of Editorial & Listed Substantive Changes to 831107 Submittal.No Unreviewed Safety Question Identified
ML20083C544
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/20/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20083C547 List:
References
NED-83-627, TAC-52483, NUDOCS 8312230179
Download: ML20083C544 (2)


Text

Georgia Power Cornpany

. 333 Piedrnont Avenue A :anta. Georg;a 30308 Telephone 404 5264526 Mailing Address:

Post Office Box 4545 At!anta. Georg<a 30302 h

Georgia Power L T. Gucwa the souFern electoc 5v tem Manager Nuc! ear Engineenng and Chief Nuclear Eng:neer December 20, 1983 NED-83-627 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 REVISION TO RECIRCULATION PIPING REPLACINFNT REPORT TO NRC Gentlemen:

By letter dated November 7, 1983, Georgia Power Company (GPC) transmitted a report to NRC concerning the recirculation piping replacement at Plant Hatch Unit 2. "Ihat report has been updated to clarify and amplify the information provided. Eight (8) copies of the revised report are enclosed. The ' revisions consist of certain editorial changes and the following substantive changes:

1. De role of the Georgia Power Company Quality Assurance Department is described (subsection 2.6.1 and section 16.0).
2. The description of the seismic analysis has been rewritten (subsection 5.3.3).
3. We description of the pipe whip restraint design has been rewritten (subsection 5.3.5).
4. A description of the analysis for LOCA effects has been added (subsection 5.3.6).

Our November 7, 1983, letter indicated that proposed changes to the plant's Technical Specifications to accommodate the piping replacement had been sQbmitted by our October 20, 1983 letter. Review by NRC determined that the proposed changes were unnecessary based on its interpretation of Technical Specifications with regard to the applicability of limiting conditions for operation while all fuel is removed from the reactor vessel.

Consequently, GPC withdrew the proposed Technical Specification changes by letter dated November 16, 1983. \

t agna8aNaaab P

P I

GeorgiaPower d Director of Nuclear Reactor Regulation Operating Reactors Branch No. 4 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 December 20, 1983' Page 2 In addition, our November 7, 1983, letter indicated that GPC would submit a proposed amendment to the operating license to address the piping replacement.- Subsequently, the NRC staff provided guidance on piping replacement at a December 1, 1983, meeting with several BWR owner utilities, and our 10 CFR 50.59 safety evaluation determined that no unreviewed safety questions exist. 'Iherefore, GPC has withdrawn by letter dated December 16, 1983 our November 23, 1983 submittal which proposed an amendment to the operating license.

'Ihe procedural guidance provided by NRC for pipe replacement at BWRs was used in the preparation of the safety evaluation per 10 CFR 50.59. As discussed above, no unreviewed safety question has been identified. The enclosed revised report is, therefore, supplied only for your infomation and use.

Should you have any questions in this regard, please contact this office.

Sincerely yours, f E Q11 =

L. T. Gucwa JAE/b1m Enclosure xc: J. T. Beckham, Jr.

H. C. Nix, Jr.

Senior Resident Inspector J. P. O'Reilly (NRC - Region II) 700775