ML22070A089

From kanterella
Revision as of 21:00, 5 April 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301
ML22070A089
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/07/2022
From: Eugene Guthrie
NRC/RGN-II
To: Chick G
Southern Nuclear Operating Co
References
IR 2021301
Download: ML22070A089 (9)


Text

March 7, 2022 Mr. Glen Chick Southern Nuclear Operating Co., Inc.

Vogtle Electric Generating Plant 7825 River Road, BIN 63031 Waynesboro, GA 30830

SUBJECT:

REISSUE - VOGTLE ELECTRIC GENERATING PLANT UNIT 3 & 4- NRC OPERATOR LICENSE EXAMINATION REPORT 05200025/2021301 AND 05200026/2021301

Dear Mr. Chick:

On November 5, 2021, the US Nuclear Regulatory Commission (NRC) issued the Operator Examination Report for the Vogtle Electric Generating Plant Unit 3, ADAMS Accession Number ML21312A191. In reviewing this report, we identified that the Report Number (5200026/2021301), Facility Docket (5200026) and License number (NPF-92) and the Enterprise Identifier (EPID: L-2021-OLL-0051) for Vogtle Unit 4 were not included in the report.

We request that the cover letter and report be replaced with the enclosure to this letter.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public inspection, exemptions, requests for withholding of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, of the Publicly Available Records (PARS) component of NRCs ADAMS; accessible from the NRC Website at https://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No: 5200025 and 5200026 License No: NPF-91, NPF-92

Enclosure:

Examination Report: 05200025/2021301 and 05200026/2021301

ML22070A089 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS/OB RII/ DRS//OB RII/ DRS/ OB NAME DEgelstad DLanyi EGuthrie DATE 3/7/2022 3/ 7/2022 3/ 7 /2022 November 5, 2021 Mr. Brian H. Whitley Nuclear Development Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT UNIT 3 & 4- NRC OPERATOR LICENSE EXAMINATION REPORT 5200025/2021301 AND 5200026/2021301

Dear Mr. Whitley:

During the period June 1 through August 15, 2021, the Nuclear Regulatory Commission (NRC) reviewed the accumulated experience for 10 Reactor Operators (ROs) and 4 Senior Reactor Operators (SROs) that had previously passed an NRC written examination and operating test.

The issuance of the licenses was deferred until after the operators completed their required plant operating experience.

All applicants satisfactorily completed all required experience requirements. All ten of the ROs and all four SRO were issued licenses.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

If you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No: 5200025 and 5200026 License No: NPF-91, NPF-92 Enclosure

ML21312A191 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS//OB RII/ DRS/ OB NAME DLanyi EGuthrie DATE 11/ 2 /2021 11/ 5 /2021 3

U.S. NUCLEAR REGULATORY COMMISSION REGION II Examination Report Docket No.: 5200025; 5200026 License No.: NPF-91; NPF-92 Report No.: 05200025/2021301; 05200026/2021301 Enterprise Identifier: L-2021-OLL-0048; L-2021-OLL-0051 Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Unit 3 & 4 Location: Waynesboro, GA Dates: June 1 - August 15, 2021 Examiner: David Lanyi, Senior Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety

4

SUMMARY

ER 05200025/2021301 AND 05200026/2021301; operating license deferred item inspection June 1 - August 15, 2021; Vogtle Unit 3 & 4; Operator License Issuance.

A Nuclear Regulatory Commission (NRC) examiner conducted a review of documentation associated with completion of deferred requirements to obtain operator licenses for Vogtle Unit 3 & 4. The examiner also reviewed the licensees requalification training program. This review ensured that all operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable, were satisfactorily completed.

All ten Reactor Operator and all four Senior Reactor Operators were issued licenses.

No findings were identified.

5 REPORT DETAILS

4. OTHER ACTIVITIES 4OA5 Operator Licensing
a. Inspection Scope The region previously evaluated each of the applicants preliminary applications using the guidance in 10 CFR 55.31(a)(4), NUREG-1021, and NEI 06-13A, Template for an Industry Training Program Description.

NEI 06-13A, Appendix A, Cold License Training Plan, identifies the following requirement for cold license applicants:

Six months of practical and meaningful work assignments that includes preoperational testing, and one or more of the following: Procedure development and validation, human factors engineering activities, task analysis verification, and licensed operator classroom presentations or simulator training implementation.

NUREG-1021, ES-202, Section D.4 (page 13 of 16) states that the cold licensing process is described in Nuclear Energy Institute (NEI)06-13A, Template for an Industry Training Program Description, Revision 1, issued March 2008. The NRC accepted the guidance of NEI 06-13A on December 5, 2008, for use in the combined operating license applications for new plants. Cold licensed operator candidates did not need to satisfy RG1.8 or NANT-2010 experience requirements before entering a licensed operator training program. The experience requirements that had not been met at the time the licensed operator examination was administered would be certified by the licensee as being complete prior to the individuals NRC operator license being issued.

The license applications were approved to allow the applicants to sit for NRC exams with the requirement that the practical and meaningful work assignments would be deferred until after the exam. Additionally, the licensee committed to create and maintain a requalification program based upon the Systematic Approach to Training (SAT) process and that each applicant would routinely attend this requalification training after successfully completing an NRC exam.

During the time frame of June 1, 2021 through June 30, 2021, the licensee submitted to the NRC documentation certifying that 14 individuals had completed the experience requirements and provided documentation associated with their SAT based requalification program. On August 12, 2021, Southern Nuclear Corporation (SNC) formally requested the issuance of nine Reactor Operator (RO) and four Senior Reactor Operator (SRO) licenses. On September 27, 2021, SNC formally requested the license for the tenth RO.

The NRC evaluated the deferences and records associated with completing the deferred experience requirements for these 14 licenses. This evaluation consisted of reviewing operating logs, testing records, and individual operator eligibility and training records to verify each had completed the experience requirements required by NEI 06-13A, Appendix A.

6 Additionally, the NRC reviewed the records associated with the SAT based continuing operator requalification training program to ensure that it was being conducted in accordance with applicable licensee procedures and that those procedures met the requirements of NEI 06-13A. The examiner also verified that the annual and biannual testing performed met the requirements of 10 CFR 55.59.

b. Findings No findings were identified.

Thirteen licenses were issued the week of August 16, 2021. The fourteenth license was issued on October 27, 2021. Copies of all individual licenses were sent to the facility Training Manager.

4OA6 Meetings, Including Exit Exit Meeting Summary On August 17, 2021, the NRC discussed the inspection results with Robert Stough, Operations Support Manager- Vogtle Units 3 & 4. Upon issuance of the fourteenth license on October 28, 2021, a final discussion of the inspection results was held with Derrick Trafford, Shift Manager Vogtle Units 3 & 4.

7 KEY POINTS OF CONTACT Licensee personnel R. Stough, Operations Support Manager- Vogtle Units 3 & 4 Derrick Trafford, Shift Manager Vogtle Units 3 & 4