ML20209A088

From kanterella
Revision as of 21:22, 11 March 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Site Analysis, Chapter 4, Reactor
ML20209A088
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/13/2019
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20209A098 List: ... further results
References
ULNRC-06547
Download: ML20209A088 (1)


Text

CALLAWAY - SA CHAPTER 4.0 REACTOR 4.1

SUMMARY

DESCRIPTION "Core A" has been chosen as the first core for the Callaway Plant, Unit 1. Therefore, the enrichments for Cycle 1 at Callaway are 2.10 (Region 1), 2.60 (Region 2) and 3.10 (Region 3) weight percent. Beginning with Cycle 2, reload fuel incorporates the Westinghouse Optimized Fuel Assembly (OFA) design. The enrichments for Cycle 2 reload fuel at Callaway are 3.40 and 3.80 weight percent.

4.1-1 Rev. OL-13 5/03