ML21139A194

From kanterella
Revision as of 12:26, 19 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Letter to Usace Re Comments on Dec 2020 Draft Work Plans
ML21139A194
Person / Time
Site: 07003085
Issue date: 05/24/2021
From: Douglas Mandeville
NRC/NMSS/DDUWP/MDB
To: Herald T
US Dept of the Army, Corps of Engineers, Pittsburgh District
Mandeville D
Shared Package
ML21139A192 List:
References
Download: ML21139A194 (3)


Text

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION May 24, 2021 Timothy J. Herald Shallow Land Disposal Area Project Manager U.S. Army Corps of Engineers Pittsburgh District 2200 William S. Moorhead Federal Building 1000 Liberty Avenue Pittsburgh, PA 15222

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION STAFF COMMENTS ON U.S. ARMY CORPS OF ENGINEERS DRAFT WORK PLANS FOR SHALLOW LAND DISPOSAL AREA, PARKS TOWNSHIP, PENNSYLVANIA, DOCKET 07003085.

Dear Mr. Herald:

By letter dated December 3, 2020, the U.S. Army Corps of Engineers (USACE), provided draft work plans for the Shallow Land Disposal Area (SLDA) in Parks Township, PA to the U.S.

Nuclear Regulatory Commission (NRC). The draft work plans describe the approach USACE is considering for remedial activities at SLDA. Consistent with the site-specific Memorandum of Understanding on SLDA that was finalized on June 13, 2014, USACE provided the draft work plans for NRC review and comment.

The NRC staff has completed its review of the draft work plans and has identified comments for the USACEs consideration. The NRC staffs comments are focused on aspects of the work plans that relate to criticality safety, material control and accounting, physical security, final status surveys, and site operations. Given that the work plans are interrelated, the USACE should consider how changes in one plan may affect other plans. The NRC staffs comments are provided in the enclosure to this letter.

The NRC staff is available to clarify its comments, if necessary. The NRC staff looks forward to working with USACE on remedial activities at SLDA.

The Enclosure contains sensitive security-related information. Accordingly, it is marked as Official Use Only and is withheld from public disclosure. When separated from the sensitive enclosure, this letter is decontrolled and publicly available in accordance with 10 CFR Section 2.390 of the NRCs "Agency Rules of Practice and Procedure."

A copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System component of the NRC's ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

The letter transmitted contains Security-Related Information. When separated from Enclosure 1, this letter is decontrolled.

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION T. Herald 2 If you have any questions regarding this letter, please contact me at (301) 415-0724, or by e-mail at douglas.mandeville@nrc.gov.

Sincerely, Signed by Mandeville, Douglas on 05/24/21 Douglas Mandeville, Project Manager Uranium Recovery and Materials Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No.: 07003085

Enclosure:

NRC Staff Comments on USACE Draft Work Plans OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

ML21139A192; Ltr ML21139A194 NMSS/DUWP OFFICE NMSS/DUWP/URMDB NMSS/DUWP/URMDB

/URMDB NAME DMandeville DM RVon RV DMandeville DM DATE May 19, 2021 May 24, 2021 May 24, 2021