U.S. Nrc'S Analysis of Exelon'S Decommissioning Funding Status Report for Three Mile Island Nuclear Station, Unit 1, Docket No. 50-289
ML21342A154
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/08/2021
From: Tanya Smith
Reactor Decommissioning Branch
To: Rhoades D
Exelon Generation Co LLC
Ted Smith, 301-415-6721
References
EPID L-2019-PMP-0065, L-2019-PMP-0065
Download: ML21342A154 (3)


Text

December 8, 2021 Mr. David P. Rhoades Exelon Generation Company, LLC Exelon Nuclear President and Chief Nuclear Officer 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF EXELONS DECOMMISSIONING FUNDING STATUS REPORT FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1, DOCKET NO 50-289 (EPID NO L-2019-PMP-0065)

Dear Mr. Rhoades:

By letter dated February 24, 2021, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System Accession No. ML21055A776) for Three Mile Island Nuclear Station, Unit-1 (TMI-1).

The NRC has reviewed and analyzed the site-specific decommissioning cost estimate, as required in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(4)(i), and the amount stated within the licensees decommissioning trust fund, as of December 31, 2020, for the above plant, as well as earnings assumptions. Based on the reported decommissioning trust balance, together with earnings credits specified under NRC regulations, the NRC has determined that as of December 31, 2020, Exelon Generation Company, LLC (Exelon) is providing a total amount of decommissioning funding assurance in the amount of $742,497,000 for radiological decommissioning of TMI-1.

This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that Exelon has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82, Termination of License, for TMI-1 on December 31, 2020. A summary report completed by NRC staff reflecting decommissioning power reactor DFSs is expected to be completed and made publicly available by the end of calendar year 2020.

D. Rhoades If you have any questions in this matter, please contact Ted Smith at Theodore.Smith@nrc.gov.

Sincerely, Signed by Smith, Theodore on 12/08/21 Theodore B. Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Cc:

TMI-1 ListServ Steven Hamman, RI Anthony Dimitriadis, RI NMSS DUWP Admin

Ltr ML21342A154 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME TSmith TS BWatson BW TSmith TS DATE Dec 8, 2021 Dec 8, 2021 Dec 8, 2021