Event Tracking Sheet of 950123 Event Re Failure of 10 Inch Valve at Weld Joining & Adapter Plate & More Catastrophic Failure to Other Parts Due to Inclusion of Shims Contrary to Drawing
ML20149J435
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/30/1997
From: Gray K
NRC
To:
Shared Package
ML20149J390 List:
References
FOIA-97-177 NUDOCS 9707280218
Download: ML20149J435 (2)


Text

__ _ _-

j *%

EVENT FOLLOW-UP ASSIGNMENT SHEET No Sort Specified QUERY > "HUNEMULLER" S Assigned To & Assigned Date >= 01/23/95 & Assigned Date <= 01/23/95 & " CRANE" 5 Plant Name ASSIGNMENT DATE: 01/23/95 ASSIGNED TO: HUNEMULLER N.

PLANT & UNIT: CRANE-ALOYCO EVENT DATE: 01/23/95 50.72 REPORT NO: 0 DAILY REPORT DATE: 01/20/95 OTHER REPORT: ALSO SEE MR H-95-0010 EVENT DESCRIPTION CRANE VALVES / NUCLEAR OPERATIONS REPORTS FAILURE OF 10" VALVE (FIGURE 63174) AT WELD JOINING YOKE AND ADAPTER PLATE AND MORE CATASTROPHIC FAILURE TO OTHER PARTS DUE TO INCLUSION OF SHIMS CONTRARY TO DRAWING. PART OF ORDER FOR WESTINGHOUSE IN EARLY 70s.

SPECIFIC FOLLOW-UP ASSIGNMENT DETERMINE DETAILS, EVALUATE SAFETY SIGNIFICANCE AND GENERIC IMPLICATIONS. IN ADDITION, ADDRESS THE FOLLOWING SPECIFIC CONCERNS: DETERMINE IF THIS IS RELATED TO CRANE VALVE YOKE ISSUE AT PEACH BOTTOM THAT HAD PREVIOUS FOLLOWUP AS QUICKLY AS POSSIBLE DETERMINE IF USED IN A SAFETY-SIGNIFICANT APPLICATION. COORDINATE WITH EMEB.

3AFETY SIGNIFICANCE: SIGEVENT AO OTHER OR CRIEFING:

EVENT FOLLOW-UP REPORT: INFORMAL CLOSEOUT DESCRIPTION CLOSEQUT: A Containment Isolation Valve at the Prairie Island Nuclear Plant was damaged as a result of operctional problems involving maintenance procedures. The valve in question was a Crane 10", Figure 63174.

An cv:luation of the original valve order retrieved from Crane archive records identified many of the utilities to whom valves, purchased by Westinghouse Electric, were shipped. This enabled Crane Valves Nuclear Operat bns (CVNO) to send a special letter to these utilities discussing the incident, providing a technical discussion, ,

and effering analytical engineering support. Analysis of the as-built valve configurations brought to CVN0's cttention indicates there is adequate thrust capacity with respect to design basis. Based on its evaluation of this matter, and given the relevant f acts and circunstances, CVNO concluded that the valve design of Figure 63174, when instatted and operated properly does not constitute a reportable item under 10 CFR Part 21.

Tha Mechanical Engineering Branch (EMEB) reviewed the vendor's Part 21 Final Report. EMEB initially believed th;t this issue was related to en ongoing review of Crane's weak link analysis (Part 21 #95024), but upon further review has determined this yoke / adapter plate weld issue has been adequately addressed.

The Generic Issues and Events Assessment Panel screened this issue on February 14, 1995. The Panel classified its slenificance as "Other," and determined that there was no need for a generic consnunication.

R3f:rences:

1. January 12, 1995, Crane letter, " Final Report on 10 CFR Part 21 Evaluations," (Accession No. 9501200336)

SUBMITTED BY: HUNEMULLER N. DATE: 08/15/96 APPROVED BY: R. DENNIG DATE: 08/16/96 CLOSEOUT NARRATIVE ENTERED: K. Gray DATE: 08/19/96 ETM* Page:1 06/30/97 9707200218 970722 PDR FOIA FOWLER 97-177 PDR

} .-

EVENT FOLLOW-UP ASSIGNMENT SHEET No Sort Specified QUERY) "HUNEMULLER" $ Assigned To & Assigned Date >= 01/23/95 & Assigned Date <= 01/23/95 & " CRANE" $ Plant Name CLOSEOUT DESCRIPTION (Continued)

(P rt 21 #95024). ,

2. January 27, 1995, Crane letter, " Final Report on 10 CFR Part 21 Evaluation of Crane Valves Installed with Shim Between Yoke and Adapter Plate," (A; cession No. 9504110027) (Part 21 #95035).
3. August 30, 1994, Crane letter, " Potential 10CFR21 Condition," (Accession No. 9409140324) (Part 21 #95006).
4. April 14,1994, Northern States Power Company letter, " Reply to a Notice of Violation NRC Inspection Report Nos. 282/94002(DRP) and 306/94002(DRP) Procedural Deficiency Allowing Damage to a Safety related Valve,"

(Acceshion No. 9404220188).

5. Daenber 28, 1994, Crane letter, " Interim Report #2 of 10CFR Part 21 Evaluation," (Accession No. 9501040170)

(P rt 21 #95007).

i

)

1

)

I l

1 l

l l

l 4