MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] Category:Final
MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] |
Text
essure Transient and Blowdown at Millstone Point 1 sequence was:
unction in the turbine pressure control system (not specified) caused sure transient which resulted in a reactor trip on high neutron flux.
rbine was manually tripped. This caused the turbine bypass valve to s expected.
bypass valve failed to close so the operator manually closed the MSIVs.
owdown continued through an open relief valve until the reactor pressure d 263 psig when it reseated. The valve's main disk was wire drawn and eroded.
(See attached page) action:
lief valve was ground,rebuilt, and tested prior to being reinstalled.
rbine control problem was thought to be with. the linkage however this ng investigated.
ose of failed system or component:
valves provide for reactor pressure control ity of system per WASH 1400:* Relief valve failure to reset: 1-10-'/D ity of component per WASH 1400:*
ilabilities are in units of per demand D .Failure rates are in r hour HR-1 .
core.
______________ to lift__________I________________
No No, EGGS avail-able No No, ECCS avail-able No No, ECCS avail-able No 96 - Actual Occurrence of a Pressure Transient and Blowd iat Millstone Point 1
No 1 Yes 2 No 3 Yes 4 Yes 5 Yes 6 NSIC 66996 - Sequence of Interest for Pressure Transient and Blowdown at Millstone Point 1 1
Millstone Point 1 utilizes ICj and FWCI instead of RCIC and HPCI.
2 Stuck open relief valve.
N NUMBER: 66996 October 22, 1971
- October 10, 1971 ED: Turbine control system, pressure relief OLVED: Relief valve sion and wire drawn seat NTEREST: Loss of Coolant Accident (small)
ENCE: Pressure transient and blowdown at Millstone Point 1 Millstone Point 1
- 50-245 BWR ICAL RATING: 660 MWe 1 yr INEERS: Ebasco orth East Nuclear Energy Company 5 miles SW of New London, Conn.
A NG CONDITION: 680MWe E TYPE OF FAILURE: (a) inadequate performance; (b) failed to start; (c) made inoperable;O failed to close.
HOD: Operational event