Category:Accident Sequence Precursor (ASP) Analysis
MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] Category:Final
MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] |
Text
Gas Turbine Becomes Ino perable During Plant Trip at Millstone -1 re sequence was:
buildup on the 345 kv lines and insulators caused a loss of ite power.
gas turbine and diesel generator started, however, the gas turbine ed. It was restarted but again tripped after about 8 minutes.
stigation revealed that the-trips were due to improper alignment-e gas turbine generators auxiliaries.
e action:
urbine auxiliaries were aligned.
urpose of failed system or component:
power provides (a.c.) electric power when offsite power sources ilable.
ility of system per WASH 1400: Emergency power: 10-3 /D) ility of component per WASH 1400:1 vailabilities are in units of per demand D-1 . Failure rates are in per hour HRC'.,
No Yes, if shell side of IC cannot be resupplied No Yes, if shell side of IC cannot be resupplied
- Actual occurrence of Gas Turbine Becomes Inoperable During Plant Trip at Millstone 1
Manually Driven In I Cooling I Damage No 1 Yes 2 No 3 Yes 4
'Yes 5 No 6 Yes 7 Yes 8 No 9 Yes 10 No 11 Yes 12 Yes 13 Yes 14 Yes 15 116780 - Sequence of Interest of Gas Turbine Becomes Unavailable at Mlillstone 1
CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS CESSION NM-BER: 116780 LER: August 24, 1976 EVENT: August 10, 1976 INVOLVED: Electric Power T INVOLVED: Gas turbine, Transmission line.
Weather, maintenance OF INTEREST:
CCURRENCE: Gas Turbine Becomes Inoperable During Plant Trip.
NAME: Millstone 1 UMBER: 245 TYPE: BW LECTRICAL RATING: 660 Mwe ACE: 5.9 yr General Electric T-ENGINEERS: Ebasco S: North East Nuclear Energy Gompany
- Five miles SW of New London
- N/A ERATING CONDITION: Plant had just tripped.
EATURE TYPE OF FAILURE: (a) inadequate performance; (b) failed to start; (Doade inoperable; (d) ____________
Y METHOD: operational transient