Final ASP Analysis - Millstone 2 (LER 336-76-049)
ML20168A575
Person / Time
Site: Millstone 
Issue date: 06/16/2020
From: Christopher Hunter
NRC/RES/DRA/PRB
To:
Littlejohn J (301) 415-0428
References
LER 1976-049-00
Download: ML20168A575 (4)


Text

PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:

117944 Date:

September 3, 1976

Title:

Offsite Power Lost at Millstone 2 The failure sequence was:

1. During a hurricane, severe salt contamination caused several switchyard failures, resulting in a loss of offsite power and a reactor trip from 100% power.
2. The diesel generators, which had been running prior to the trip, provided power to safety related loads.

Corrective action; Switchyard equipment and insulators were washed down, damaged circuit breakers were repaired, and the offsite transmission lines returned to service.

Design purpose of failed system or component:

Offsite power provides the preferred source of power to safety related loads when the unit generator is not available.

Unavailability of system per WASH 1409:

  • off-site power:

2 x lO-5Ihr Unavailability of component per WASHi 1400:*

Unavailabilities are in units of per demand D-1.

Failure rates are in units of per hour HR-1.

Reactor at Diesel genera-Severe salt spray Diesel generators 100% power tors running

-causes switchyard assume safety during equipment failures related loads hurricane and loss of offaite power and conse-quent reactor trip Potential Severe Core Damage No No -

steam driven AFW pump available for RX cooling No No No -

steam driven AFW pump available for Rx cooling No NSIC 117944 -

Actual Occurrence for Offsite Power Lost at Millstone 2

Loss of Turbine Offsite Generator Power Runs Back and Assumes House Loads Emer-gency Power Auxiliary PORV Feedwater and Demanded Secondary Heat Removal PORV or PORV Isola-tion Valve Closure High Long Pressure Term Injection Core Cooling Potential Severe Core Damage I

Sequence No.

2 3

4 5

6 7

8 9

10 11 12 13 NSIC 117944 -

Sequence of Interest for Offsite Power Lost at Millstone 2

  • Use of HPI after AFW failure not included in mitigation procedures.
    • diesel generators running but not loaded

CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NULMBER:

117944 DATE OF LER:

September 3, 1976 DATE OF EVENT:

August 10, 1976 SYSTE[ INVOLVED: offsite power COMPONENT INVOLVED:

switchyard insulators and equipment CAUSE:

severe salt spray wetting during hurricane SEQUENCE OF INTEREST:

loss of off site power ACTUAL OCCURRENCE:

reactor trip with loss of offsite power and diesel generators previously started and running REACTOR NAMtE.

M~illstone 2 DOCKET NUMBER:

50-336 REACTOR TYPE:

PWR DESIGN ELECTRICAL RATING:

830 MWe REACTOR AGE:

.8 yr VENDOR:

Combustion Engineering ARCHITECT-ENGINEERS:

Bechtel OPERATORS:

Northeast Nuclear Energy Co.

LOCATION:

5 miles SW of.New London, Conn.

DURATION:

N/A PLANT OPERATING CONDITION:

100% powet SAFETY FEATURE TYPE OF FAILURE:

(a) inadequate performance; (b) failed to start; r(O made inoperable; (d)__________

DISCOVERY MET1EOD:

during operation COMMENT:

-