Category:Accident Sequence Precursor (ASP) Analysis
MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] Category:Final
MONTHYEARML20168A5762020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-77-020) ML20168A5752020-06-16016 June 2020 Final ASP Analysis - Millstone 2 (LER 336-76-049) ML20168A5722020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-029) ML20168A5712020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-012) ML20168A5702020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-76-010) ML20168A5692020-06-16016 June 2020 Final ASP Analysis - Millstone 1 (LER 245-71-099) ML20149K4702020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-84-012) ML20149K4692020-05-28028 May 2020 Final ASP Analysis - Millstone 2 (LER 336-81-005) ML20149K4682020-05-28028 May 2020 Final ASP Analysis - Millstone 1 (LER 245-85-018) ML20135G9792020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-90-011) ML20135G9802020-05-14014 May 2020 Final ASP Analysis - Millstone 3 (LER 423-91-011) ML20135G9782020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-95-002) ML20135G9772020-05-14014 May 2020 Final ASP Analysis - Millstone 2 (LER 336-91-009) ML20113E9362020-05-12012 May 2020 Final ASP Analysis - Millstone 2 (LER 336-01-005) 2020-06-16
[Table view] |
Text
ust 10, 1977 oth Diesel Generator Fuel Supply Valves Found Shu~t at Millstone 2 e sequence was:
a routine inspection with the plant in cold shutdown, the-fuel supply on both diesel generators were found shut. The cause of valve e was not known.
fuel supply valves were reopened.
e action; lve manual operators were chain locked in the open position.
rpose of failed system or component:
iesel generators provide on-site emergency power for safety-related the event of fsite power and the-~unit generator are unavailable.
ility of system per W4ASH 140U;
- emergency power: 3 x 10-2 /1) ility of component per WASH 1400:* diesel generators: 10-2 /D availabilities are in units of per demand D-1 . Failure rates are in 1
per hour HR- .
nd plant fuel supply valve fuel supply valve Severe ion in found shut in found shut in Core s violation of violation of Damage procedures procedures No - unit in cold shutdown plus of fsite power available
[NO SIC 132979 - Actual Occurrence for Both Diesel Generator Fuel Supply Valves Found Shut at Millstone 2
No 2
3 4
5 6
7 8
9 10 11 12 13 132979 - Sequence of Interest for Both Diesel-Generator Fuel Supply Valves Found Shut at Millstone 2 included in mitigation procedures.
ESSION NUIMER: 132979-LER: August 10,- 1.977 (Original report date June 14, 1977)
EVENT: May 15, 1977 NVOLVED:. on-site emergency .power T INVOLVED: diesel-generators fuel supply valves shut, human error OF INTEREST: loss of of fsite power CCURRENCE: fuel supply valves discovered to be. shut during an inspection-NA11E: Millstone 2 UMBER: 50-336 TYPE: PWR LECTRICAL RATING: 870 MWe AGE: 2.0 yr
.Combustion Engineering T-ENGINEERS: Bechtel S: Northeast Nuclear Energy Co.
- 5 allea SI'tof New London, Comm.
180(a) hours ERATING CONDITION: cold shutdown EATURE TYPE OF FAILURE: (a) inadequate performnance; (ba)failed to start; (Omade inoperable; (d) __________
Y METHOD: routine inspection
-