52411
, (Open)
7 March 1984 - 26 June 1986
Request for:
Open
Initiation
Request
,
Request
,
Request
Acceptance...
Withholding Request...
Meetings...
Questions
Answers
Results
Approval...
Other:
AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1
,
AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program
,
AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL
,
AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function
,
AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced
,
AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date
,
ML20084D490
,
ML20100N189
,
ML20199L597
,
ML20199L624
From
Grand Gulf
|
[Open (279)]
|
[Closed (162)]
[list all from site]
MONTH
YEAR
AECM-84-0090, Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790)
1984-03-07
0
7 March 1984
Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790)
ML20084D490
1984-04-30
0
30 April 1984
Part 21 Rept Re Westinghouse Relay Type SA-1 Reported in IE Info Notice 83-63.Initially Reported on 840307.RTE Delta Switchgear Div Requests to Be Advised If Util Upgrades Equipment,To Enable Records Mod
AECM-84-0378, Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area
1984-07-26
0
26 July 1984
Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area
AECM-84-0393, Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389)
1984-08-03
0
3 August 1984
Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389)
AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1
1984-10-05
0
5 October 1984
Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1
AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program
1984-11-07
0
7 November 1984
Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program
AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL
1984-11-21
0
21 November 1984
Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL
AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function
1984-11-28
0
28 November 1984
Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function
ML20100N189
1985-02-28
0
28 February 1985
Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept
AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced
1985-03-29
0
29 March 1985
Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced
AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date
1985-04-16
0
16 April 1985
Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date
ML20199L624
1986-06-26
0
26 June 1986
SER Re Operability/Reliability of Tdi Emergency Diesel generator.Three-phase Plan for Assuring Generator Reliability Discussed.Sample License Conditions Encl
ML20199L597
1986-06-26
0
26 June 1986
Forwards Generic SER of Operability/Reliability of Emergency Diesel Generators Mfg by Tdi.Plans for Program Implementation Requested by 860715
1984-04-30
[table view]
Category
:
TAC
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View form
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties