MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 9805301998-03-0606 March 1998 Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 9804041998-02-17017 February 1998 Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment1998-02-13013 February 1998 Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor1998-02-0606 February 1998 Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 9802171998-01-28028 January 1998 Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution1998-01-16016 January 1998 Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept1997-12-18018 December 1997 Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 9801291997-12-0303 December 1997 Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 9712181997-10-29029 October 1997 Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes1997-08-28028 August 1997 Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes ML20149F6031997-07-18018 July 1997 Part 21 Rept Re R47 Incorrectly Installed on Electric Power Assembly.Recommends Evaluation of Timing Delay Requirements Applicable to Reactor Protective Sys ML20136D5641997-03-0707 March 1997 Part 21 Rept Re Transformer Not Being Stable in No Load Condition & Tripping When Lightly Loaded U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys1997-02-27027 February 1997 Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause U-602677, Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker1996-12-20020 December 1996 Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker U-602634, Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul1996-09-20020 September 1996 Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul ML20116B9251996-07-25025 July 1996 Part 21 Rept Re Failure Analysis Concerning Pump Assembly NS109761EQX07 U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly1996-05-0808 May 1996 Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly U-602579, Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept1996-05-0202 May 1996 Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept ML20108D1441996-05-0101 May 1996 Part 21 Rept Re Failure of Pump Assembly for Itt Barton Series NH95 Hydramotor Actuator.Did Not Develop Pressure Because Was Not Fitted Properly.Pump Assembly Has Been Returned to Itt Barton for Insp U-602564, Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia1996-03-13013 March 1996 Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers1995-12-20020 December 1995 Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers ML20094P5671995-11-20020 November 1995 Part 21 Rept Re Abb Power Shield Trip Units (Pstu),Type SS-13.On 951006,util Reported to NRC That Two Pstus,Type SS-13 Tripped VC & Vx Sys Circuit Breakers.Recommends Insp of Power Shield SS Trip Units Prior to Serial 80,000,in Svc U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker1995-10-0606 October 1995 Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker U-602497, Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity1995-09-26026 September 1995 Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity U-602466, Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 9509271995-07-12012 July 1995 Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 950927 ML20084B0071995-05-22022 May 1995 Part 21 Rept Re Failure of Elgar Inverter Pwm Drive Logic Card on 950324.Cause of Failure Unknown.Subsequent Replacement Logic Card Identified as Deficient.Both Logic Cards Returned to Mfg for Analysis ML20072S0051994-08-18018 August 1994 Part 21 Rept Re Failure of Motor Operated Potentiometer Mfg by Basler Electric.Qualification Testing of Units Revised & Mkw Power Sys Will Perform Site Visit at Basler Electric to Verify Adequacy of Basler Electric C/A U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay1994-06-27027 June 1994 Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram1994-06-0606 June 1994 Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram JSP-007-94, Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program1994-01-11011 January 1994 Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program JSP-006-94, Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition1994-01-0707 January 1994 Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition U-602227, Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb..1993-12-22022 December 1993 Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb.. JSP-552-93, Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced1993-12-10010 December 1993 Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARU-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals U-603041, Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 ML20151U1501998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 U-603023, Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 1 U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-603006, Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 1 U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable ML20216B1351998-04-21021 April 1998 Rev 0 to Illinois Power Co Clinton Power Station SVC Design Rept U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602976, Monthly Operating Rept for Mar 1998 for Clinton Power Station1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Clinton Power Station ML20217H5771998-03-27027 March 1998 Safety Evaluation Concluding That No Significant Safety Hazards Introduced at CPS for Net 32% Ampacity Derating Factor for 1 H & 3 H Conduit Fire Barrier Sys & 1 H Cable Tray Fire Barrier Sys.Requests Response Addressing Issue U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 1999-09-30
[Table view] |
Text
. . .
U-600685 L14-86( 08W15 )-L 1A.120 owc
/LLINDIS POWER OOMPANY IP CLINTON POWER STATION, P.O. BOX 678, CLINTON. ILLINots 61727 August 15, 1986 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Reportable 10CFR50.55(e) Deficiency 55-86-04:
Modification of Limiter Plates on Limitorque Valve Operators
Dear Mr. Keppler:
On July 15, 1986, Illinois Power Company (IP) notified Mr. F. Jablonski, NRC Region III (Ref: IP Record of Coordination Y-202787, dated July 15, 1986) of a potentially reportable deficiency identified during motor operated valve analysis and testing system (MOVATS) involving safety-related Limitorque valve system operators that could not
& hieve the required thrust as recommended by the valve manufacturer. To achieve the recommended thrust, the limiter plates were modified (shaved), with vendor concurrence, to allow the torque switch to be set above the maximum vendor recommended range. This action invalidated -
the equipment qualification of the subject Limitorque valve operators. The equipment qualification requires that the operators not stall down to 90% of rated voltage. Testing performed subsequent to the plate modifications determined that this requirement could not be met.
Our investigation of this matter is continuing.
Illinois Power has reviewed and evaluated the findings associated with this investigation to date, and has determined that the failure of these motor operated valves to perform as qualified could have adversely affected the operability of three (3) emergency core cooling systems plus shutdown service water and fire protection systems.
Additionally, a review was performed by Illinois Power's Independent Safety Engineering Group's (ISEG) Report which documents their review of problems identified during MOVATS.
This report states that, "If MOVATS testing had not been performed, it is likely that operational reliability"of An the affected systems would have been adversely impacted.
extensive engineering evaluation would be required to 56 860e230123 e60e1s PDR ADOCK 0S000461 gDG 19 E6b S Pen
-- ~- - - ,__ , _. __ _ _ , , .. _ _ . -
U-600685 L14-86 (08 -15 )-L 1A.120 determine the effect of these deficiencies on the associated systems to perform their required safety function, if uncorrected. On this basis, the subject deficiency, which considered the cumulative effects of the deficiencies identified during MOVATS testing is considered to be reportable under the provisions of 10CFR50.55(e). Illinois Power is continuing to review and evaluate the cumulative impact of the deficiencies identified during MOVATS testing and adequacy of corrective actions taken, to determine if additional corrective actions are needed. This letter represents an interim report in accordance with the requirements of 10CFR50.55(e). Attachment A provides the details of our investigation to date.
We trust that this interim report provides you sufficient background information to perform a general assessment of this reportable deficiency and adequately describes our overall approach to resolve this issue.
rel yours,
. . Hall Vice President RLC/kaf Attachment cc: NRC Resident Office Illinois Department of Nuclear Safety INPO Records Center
ATTACHMENT A ILLINOIS POWER COMPANY CLINTON POWER STATION DOCKET No. 50-461 Reportable 10CFR50.55(e) Deficiency 55-86-04 Modification of Limiter Plates on Limitorque Valve Operators Interim Report Statement of Reportable Deficiency / Background On July 1, 1986, the Nuclear Station Engineering Department (NSED) initiated Condition Report (CR) No.
1-86-07-004 which documented that during the performance of motor operated valve analysis and testing system (MOVATS),
several motor operated valves could not meet the manufacturer's recommended thrust values. Based on discussions between NSED and Limitorque, the limiter plates for the operators were modified (shaved) to permit increasing the torque switch setting such that the valve manufacturer's recommended thrust values could be achieved.
Limitorque provided concurrence for shaving of the limiter plates with the stipulation that the operators be tested at the higher torque switch setting to ensure that the operator did not stall. Although this testing was performed by Illinois Power, it was performed at 100% of rated operator voltage, rather than 90% of rated operator voltage as required by the FSAR and equipment qualification.
Investigation Results/ Corrective Action To determine the extent of the problem, NSED conducted a review of the safety-related M0 VATS data sheets. Based on this review, a total of 36 valves were identified with modified (shaved) limiter plates which could potentially stall at 90% of rated voltage.
Limitorque Corporation conducted field testing on approximately 40% of the 36 valves and projected that approximately 90% of the valves to be tested would stall at the increased torque switch settings. Consultations were held with Anchor / Darling Valve Company, Yarway Valve Company and Limitorque Corporation to determine the cause of the 36 valves which could not develop the design thrust without exceeding the recommended limiter plate range. During NSED's explanation of how the Thrust Measuring Device (TMD) functions, it was noted by the engineers representing the valve manufacturers that the design thrust which the TMD measured, already accounted for the valve stem packing load losses because the packing glands had previously been adjusted. This is based on the total thrust the valve imparts to the TMD which is diminished by the drag imparted Page 1 of 4
\
ATTACHMENT A ILLINOIS POWER COMPANY CLINTON POWER STATION on the valve stem by the valve packing. Therefore, the valve packing load losses should not have been included as part of the required thrust when performing this test. On this basis the thrust values being used by MOVATS were reduced by an amount equivalent to the packing load losses.
Following adjustments to the thrust values, 25 of the 36 valves' torque switch settings fell back within the recommended limiter plate range. An additional 2 valves were previously set back into the limiter plate range, one because of maintenance rework and the other was determined to be an error in reading the torque switch setting. The remaining 9 valves were tested at 90% of their rated voltage using a variac transformer. The results of the variac test confirmed that the valves would not stall down to 90% of rated voltage. The above action restored the qualification of the 36 valves such that the requirements of the FSAR are met.
In addition to the above actions, the following remedial actions were taken to assure all consequences of the 50.55(e) were addressed:
- 1. During Limitorque's field tests, a concern was expressed regarding the 9 operators which were left with the torque switch settings above the normal recommended range. Limitorque has stated that although the 90% voltage tests were satisfactory the operator worm gears may be subject to increased wear due to the higher torque switch settings, and recommended that the worm gears be inspected at the first refueling outage.
Maintenance Work Requests (MWRs) have been initiated to implement this action at the first refueling outage.
The nine (9) affected valves and associated MWRs are listed below.
Valve No. MWR
- 1. 1CC054 C-10240
- 2. 1E12F042C C-10233
- 3. IVP005B C-10236
- 4. IVP015B C-10237
- 5. IVP014A C-10238
- 6. IVP014B C-10239
- 7. 1E12F074A C-10234
- 8. 1E12F074B C-10235
- 9. ISX173B C-10241
- 2. Plant Modification M-9 was issued to evaluate the design change for the 9 valves which were left above their maximum limiter plate range.
- 3. NSED's " Safety Related Motor Operated Valve Data" list will be revised for the 9 valves which have as-left torque switch settings above their limiter plate and Page:2 of 4
ATTACHMENT A ILLINOIS POWER COMPANT CLINTON POWER STATION have passed the variac test. In these cases the maximum torque switch will be changed to reflect the as-left condition. This action will be performed on Rev. 18 of the list.
Root Caura(s)
The root cause investigation associated with this issue identified the root causes to be:
- 1. Bases for establishing the valve manufacturer's recommended thrust values were not initially recognized.
- 2. NSED incorrectly identified the Limiter Plate Modification as an internal adjustment to equipment instead of a design change. This breakdown in design control resulted in changes to Procedure 8451.02 to allow modification of limiter plates without testing at 90% undervoltage. To prevent this practice from recurring, the following actions were taken:
All NSED personnel were trained on the importance of evaluating vendor supplied equipment under the Plant Modification Program which provides Clinton's design control as required by 10CFR50, Appendix B, Criterion III.
CPS Procedure 8451.02 was revised to delete Sections 8.7.3.12.1 through 8.7.3.12.4 and add Section 8.7.3.12.1 to prohibit raising the torque switch above the limiter plate without NSED evaluation and approval.
Safety Implications / Significance Illinois Power has reviewed and evaluated the findings associated with this investigation and has determined that the failure of these motor operated valves to perform as
, qualified could have adversely affected the operability of three (3) emergency core cooling systems as well the shut down service water and fire protection systems.
Additionally, a review was performed of Illinois Power's Independent Safety Engineering Group's (ISEG) Report which i documents their review of problems discovered during MOVATS testing. This report states that, "If MOVATS testing had not been performed it is likely that operational reliability of the affected safety-related systems would have been adversely impacted." An extensive engineering evaluation would be required to determine the effect of these deficiencies on the associated systems to perform their required safety function, if uncorrected. On this basis, i
Page 3 of 4 .
- - - - -,,-u-- - . e ,, ,.g.,., - , ,,n. -n, - - - - . - - - - , _ -. .- , . - - - - , . , , , ,
ATTACHMENT A ILLINOIS POWER COMPANY CLINTON POWER STATION the subject deficiency which considered the cumulative effects of the deficiencies identified during MOVATS testing is evaluated to be reportable under the provisions of 10CFR50.55(e).
Other deficiencies / defects identified during the course of MOVATS which were evaluated to be potentially reportable were referred and investigated. The reportability and required corrective actions associated with these deficiencies / defects were addressed by the following issues:
ISSUE SUBJECT 21-85-02 Missing Space Heaters in Limitorque Operators (Not Reportable).
21-85-05 Loose Anti-Rotational Devices on Anchor / Darling Globe Valves (Reportable).
21-85-15 Defective 1/2" and 3/4" Valve Stems on Yarway Valves. (Not Reportable) 21-85-18 410 S.S. Valve Stem Corrosion Failures (Reportable).
55-86-02 Lugs Installed on Limitorque Operators (Reportable).
Illinois Power is continuing to review and evaluate the cumulative impact of the deficiencies identified during MOVATS testing and adequacy of corrective actions taken to determine if additional corrective actions are needed. It is anticipated that approximately 10 additional days will be required to complete our review and evaluation and submit a final report on the matter.