3F0586-08, Monthly Operating Rept for Apr 1986
| ML20204A183 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/30/1986 |
| From: | Graham D, Widell R FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0586-08, 3F586-8, NUDOCS 8605090460 | |
| Download: ML20204A183 (5) | |
Text
,_ .__ . - _ - .
.I %,
s OPERATING DATA REPORT DOCKET NO. 50-302 DATE 5/1/86 COMPLETED BY D. Graham TELEPHONE (4n4) m-6486 OPERATING STATUS
- 1. Unit Name: Crystal River Unit 3 Notes
. 2. Reporting Period: 4/1/86 - 4/30/86 2544
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 890
- 5. Design Electrical Rating (Net MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Maximum Dependable Capacity (Net MWe): 821
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: '
NA ,
- 9. Power Level To Which Restricted,if Any(Net MWe): NA
- 10. Reasons For Restrictions,If Any: NA t
This Month Yr to.Date Cumulative .,
- 11. Hours in Reporting Period 719 2879 80063
- 12. Number Of Hours Reactor Was Critical 0 23.6 50324.6 ,
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3' I4. Hours Generator On.Line 0 23.6 49114.4 ..
- 15. Unit Reserve Shutdown Hours U U U
- 16. Gross Thermal Energy Generated (MWH) 0 55103 110523968 '
- 17. Gross Electrical Energy Generated (MWH) 0 19541
_ . . . 37761603 0
- 18. Net Electrical Energy Generated (MWH) 0 18580 35863252 s:
- 19. Unit Service Factor 0% 0.8% 61.3 %
- 20. Unit Availability Factor 0% 0.8% [
61.3 %
- 21. Unit Capacity Factor (Using MDC Net) 0% 0.8% {
- 22. Unit Capacity Factor (Using DER Net) 0% 0.8%
56.2 %
(
54.3 % j:2
- 23. Unit Forced Outage Rate 100 % 99.2 % 23.0 % k-
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
. None IM
' f,l t+
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 15.1986 >
, 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved '
El INITIAL CRITICALITY l /I'4/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION p ;. l w
8605090460 860430 2 3/13/7{ M/ isl PDR ADOCK 0500 g R (9p7) ,
t
2 AVERAGE DAILY UNIT POWER LEVEL <
n -
DOCKET NO. 50-302 UNIT FLCR P-3 DATE 5/1/86
?
COMPLETED BY D. Graham TELEPHONE (904) 795-648G MON'ni April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) j 0 y7 0 2 0 18 0
~
3 0 '
19 0 4 0 20 0 5 0 21 0 6 0 22 0 e 7 0 23 0-g 0 24 0 -
4 9 0 33 o i 10 0 26 0 )
II O 27 0
['
12 0 28 0 L 13 0 0
29 f
14 0 30 0 ;
IS 0 33 0 . .
16 0 "
l INSTRUCTIONS u
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Co the nearest whole megawait. h.
^
h (9/77) 7 d
ik r:.
l.
(. .
e DOCKET NO. 50-302 .
UNIT SHUTDOWNS AND POWER REDUCTIONS
- UNIT NAME - F LCllP-3 DATE 5/1/86 COMPLETED BY It nenhnm >
REPORT MONTil 4/86 TELEPHONE (904) 795-6486 e.
, .$ g "h Licensee E 9, "
. Cause & Corrective No. Date g 5g s 3.Y sec Event g '2 Action to H
$E 5 j i?3 g Report # mu g Prevent Recurrence c5 86-01 860101 F 719.0 A 4 86-01 CB PUMPXX The four reactor coolant pumps are being modified and repaired with new pump shafts.
I 2 3 4 F: Forced Reason: Method Exhibit G . Instructions 5: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Maintenance of Test 1-M *1 2-M 1 Scram Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LER) File INUREG-D-Regulatory Restriction 4-Continued 0161)
E-Operator Training & Ucense Examination 5-Reduced Load F Administrative '-UEh'"
5 G-Operational Error (Explain) Exhibit I . Same Source 19/77) Il-Other (Explain) e
,17e , pp.r - =g.'737 1: y; - - -
. . .o MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3
, DATE 5/1/86 COMPLETED BY D. Grnhnm TELEPHONE (904) 795-6486 MONTH April 1986
SUMMARY
STATEMENT: CR-3 remains off-line for repair of all Reactor Coolant pumps.
- 6
,e h.
e 6
4 b
T
. . t
'f V
7:.
.P.
D i
k$
e Yi f
h w
0.:
NI S
5!
V v
t r.-
I:U t.-
5.t
e
- c. >
hO 00l**
('e Power CO R POR ATION May 5, 1986 3F0586-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 April 1986 Monthly Operating, fgport. These reports are submitted in accordance with Technical Specifiqation 6.9.1.6.
Sincerely, R. C.'sWidell Managi/r, Nuclear Operations Licensing and Fuel Management AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323