3F0586-08, Monthly Operating Rept for Apr 1986

From kanterella
(Redirected from 3F0586-08)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1986
ML20204A183
Person / Time
Site: Crystal River 
Issue date: 04/30/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0586-08, 3F586-8, NUDOCS 8605090460
Download: ML20204A183 (5)


Text

,_

.I s

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 5/1/86 COMPLETED BY D. Graham TELEPHONE (4n4) m-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 Notes

. 2. Reporting Period: 4/1/86 - 4/30/86

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,if Any(Net MWe):

NA

10. Reasons For Restrictions,If Any:

NA t

This Month Yr to.Date Cumulative

11. Hours in Reporting Period 719 2879 80063
12. Number Of Hours Reactor Was Critical 0

23.6 50324.6

13. Reactor Reserve Shutdown Hours 0

0 1280.3' I4. Hours Generator On.Line 0

23.6 49114.4

15. Unit Reserve Shutdown Hours U

U U

16. Gross Thermal Energy Generated (MWH) 0 55103 110523968
17. Gross Electrical Energy Generated (MWH) 0 19541 37761603 0
18. Net Electrical Energy Generated (MWH) 0 18580 35863252 s:
19. Unit Service Factor 0%

0.8%

61.3 %

[

20. Unit Availability Factor 0%

0.8%

61.3 %

{

21. Unit Capacity Factor (Using MDC Net) 0%

0.8%

56.2 %

(

22. Unit Capacity Factor (Using DER Net) 0%

0.8%

54.3 %

j:2

23. Unit Forced Outage Rate 100 %

99.2 %

23.0 %

k-

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

IM

. None

' f,l t+

25. If Shut Down At End Of Report Period. Estimated Date of Startup:June 15.1986
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved '

El INITIAL CRITICALITY l /I'4/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/7{ /p

. lw isl 8605090460 860430 M

PDR ADOCK 0500 2

g R

(9p7) t

2 AVERAGE DAILY UNIT POWER LEVEL n

DOCKET NO.

50-302 UNIT FLCR P-3 DATE 5/1/86

?'

COMPLETED BY D. Graham TELEPHONE (904) 795-648G MON'ni April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) j 0

y7 0

2 0

18 0

~

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

e 7

0 23 0-g 0

24 0

4 9

0 33 o

i 10 0

26 0

)

II O

27 0

['

12 0

28 0

L 13 0

29 0

f 14 0

30 0

IS 0

33 0

16 0

"l INSTRUCTIONS u

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Co h.

the nearest whole megawait.

^

h (9/77) 7 d

ik r:.

l.

(.

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNIT NAME - F LCllP-3 DATE 5/1/86 REPORT MONTil 4/86 COMPLETED BY It nenhnm TELEPHONE (904) 795-6486 e.

.$ g "h

3.Y Licensee E 9, Cause & Corrective No.

Date g

5g s

sec Event g '2 Action to H

$E 5

j i?3 g Report #

mu Prevent Recurrence g

c5 86-01 860101 F

719.0 A

4 86-01 CB PUMPXX The four reactor coolant pumps are being modified and repaired with new pump shafts.

I 2

3 4

F: Forced Reason:

Method Exhibit G. Instructions 5: Scheduled A Equipment Failure (Explain) for Preparation of Data 1-M

  • 1 B-Maintenance of Test 2-M 1 Scram Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LER) File INUREG-D-Regulatory Restriction 4-Continued 0161)

E-Operator Training & Ucense Examination 5-Reduced Load F Administrative

'-UEh'"

5 G-Operational Error (Explain)

Exhibit I. Same Source 19/77)

Il-Other (Explain) e

,17e

, pp.r -

=g.'737 1: y;

.o MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/1/86 COMPLETED BY D. Grnhnm TELEPHONE (904) 795-6486 MONTH April 1986

SUMMARY

STATEMENT:

CR-3 remains off-line for repair of all Reactor Coolant pumps.

6 h.

,e e

6 4

b T

t

'f V$

7:.

.P D

k$

i e

Yi f

h w

0.:

NI S

5!Vv t

r.-

I:U t.-

5.t

e c.

hO 00l*

(

'e Power CO R POR ATION May 5, 1986 3F0586-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 April 1986 Monthly Operating, fgport.

These reports are submitted in accordance with Technical Specifiqation 6.9.1.6.

Sincerely, R. C.'sWidell Managi/r, Nuclear Operations Licensing and Fuel Management AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323

/.1

/[M

'{t GENERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042. St. Petersburg, Florida 33733 *S13-866-5151

)