Monthly Operating Rept for Apr 1986
ML20204A183
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0586-08, 3F586-8, NUDOCS 8605090460
Download: ML20204A183 (5)


Text

,_ .__ . - _ - .

.I  %,

s OPERATING DATA REPORT DOCKET NO. 50-302 DATE 5/1/86 COMPLETED BY D. Graham TELEPHONE (4n4) m-6486 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 Notes

. 2. Reporting Period: 4/1/86 - 4/30/86 2544

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: '

NA ,

9. Power Level To Which Restricted,if Any(Net MWe): NA
10. Reasons For Restrictions,If Any: NA t

This Month Yr to.Date Cumulative .,

11. Hours in Reporting Period 719 2879 80063
12. Number Of Hours Reactor Was Critical 0 23.6 50324.6 ,
13. Reactor Reserve Shutdown Hours 0 0 1280.3' I4. Hours Generator On.Line 0 23.6 49114.4 ..
15. Unit Reserve Shutdown Hours U U U
16. Gross Thermal Energy Generated (MWH) 0 55103 110523968 '
17. Gross Electrical Energy Generated (MWH) 0 19541

_ . . . 37761603 0

18. Net Electrical Energy Generated (MWH) 0 18580 35863252 s:
19. Unit Service Factor 0% 0.8% 61.3 %
20. Unit Availability Factor 0% 0.8% [

61.3 %

21. Unit Capacity Factor (Using MDC Net) 0% 0.8% {
22. Unit Capacity Factor (Using DER Net) 0% 0.8%

56.2 %

(

54.3 % j:2

23. Unit Forced Outage Rate 100 % 99.2 % 23.0 % k-
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

. None IM

' f,l t+

25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 15.1986 >

, 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved '

El INITIAL CRITICALITY l /I'4/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION p  ;. l w

8605090460 860430 2 3/13/7{ M/ isl PDR ADOCK 0500 g R (9p7) ,

t

2 AVERAGE DAILY UNIT POWER LEVEL <

n -

DOCKET NO. 50-302 UNIT FLCR P-3 DATE 5/1/86

?

COMPLETED BY D. Graham TELEPHONE (904) 795-648G MON'ni April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) j 0 y7 0 2 0 18 0

~

3 0 '

19 0 4 0 20 0 5 0 21 0 6 0 22 0 e 7 0 23 0-g 0 24 0 -

4 9 0 33 o i 10 0 26 0 )

II O 27 0

['

12 0 28 0 L 13 0 0

29 f

14 0 30 0  ;

IS 0 33 0 . .

16 0 "

l INSTRUCTIONS u

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Co the nearest whole megawait. h.

^

h (9/77) 7 d

ik r:.

l.

(. .

e DOCKET NO. 50-302 .

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • UNIT NAME - F LCllP-3 DATE 5/1/86 COMPLETED BY It nenhnm >

REPORT MONTil 4/86 TELEPHONE (904) 795-6486 e.

, .$ g "h Licensee E 9, "

. Cause & Corrective No. Date g 5g s 3.Y sec Event g '2 Action to H

$E 5 j i?3 g Report # mu g Prevent Recurrence c5 86-01 860101 F 719.0 A 4 86-01 CB PUMPXX The four reactor coolant pumps are being modified and repaired with new pump shafts.

I 2 3 4 F: Forced Reason: Method Exhibit G . Instructions 5: Scheduled A Equipment Failure (Explain) for Preparation of Data B-Maintenance of Test 1-M *1 2-M 1 Scram Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LER) File INUREG-D-Regulatory Restriction 4-Continued 0161)

E-Operator Training & Ucense Examination 5-Reduced Load F Administrative '-UEh'"

5 G-Operational Error (Explain) Exhibit I . Same Source 19/77) Il-Other (Explain) e

,17e , pp.r - =g.'737 1: y; - - -

. . .o MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3

, DATE 5/1/86 COMPLETED BY D. Grnhnm TELEPHONE (904) 795-6486 MONTH April 1986

SUMMARY

STATEMENT: CR-3 remains off-line for repair of all Reactor Coolant pumps.

6

,e h.

e 6

4 b

T

. . t

'f V

7:.

.P.

D i

k$

e Yi f

h w

0.:

NI S

5!

V v

t r.-

I:U t.-

5.t

e

c. >

hO 00l**

('e Power CO R POR ATION May 5, 1986 3F0586-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 April 1986 Monthly Operating, fgport. These reports are submitted in accordance with Technical Specifiqation 6.9.1.6.

Sincerely, R. C.'sWidell Managi/r, Nuclear Operations Licensing and Fuel Management AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323