3F0586-08, Monthly Operating Rept for Apr 1986
| ML20204A183 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/30/1986 |
| From: | Graham D, Widell R FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0586-08, 3F586-8, NUDOCS 8605090460 | |
| Download: ML20204A183 (5) | |
Text
,_
.I s
OPERATING DATA REPORT DOCKET NO.
50-302 DATE 5/1/86 COMPLETED BY D. Graham TELEPHONE (4n4) m-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes
. 2. Reporting Period: 4/1/86 - 4/30/86
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Maximum Dependable Capacity (Net MWe):
821
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted,if Any(Net MWe):
NA
- 10. Reasons For Restrictions,If Any:
NA t
This Month Yr to.Date Cumulative
- 11. Hours in Reporting Period 719 2879 80063
- 12. Number Of Hours Reactor Was Critical 0
23.6 50324.6
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3' I4. Hours Generator On.Line 0
23.6 49114.4
- 15. Unit Reserve Shutdown Hours U
U U
- 16. Gross Thermal Energy Generated (MWH) 0 55103 110523968
- 17. Gross Electrical Energy Generated (MWH) 0 19541 37761603 0
- 18. Net Electrical Energy Generated (MWH) 0 18580 35863252 s:
- 19. Unit Service Factor 0%
0.8%
61.3 %
[
- 20. Unit Availability Factor 0%
0.8%
61.3 %
{
- 21. Unit Capacity Factor (Using MDC Net) 0%
0.8%
56.2 %
(
- 22. Unit Capacity Factor (Using DER Net) 0%
0.8%
54.3 %
j:2
- 23. Unit Forced Outage Rate 100 %
99.2 %
23.0 %
k-
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
IM
. None
' f,l t+
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:June 15.1986
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved '
El INITIAL CRITICALITY l /I'4/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/7{ /p
- . lw isl 8605090460 860430 M
PDR ADOCK 0500 2
g R
(9p7) t
2 AVERAGE DAILY UNIT POWER LEVEL n
DOCKET NO.
50-302 UNIT FLCR P-3 DATE 5/1/86
?'
COMPLETED BY D. Graham TELEPHONE (904) 795-648G MON'ni April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) j 0
y7 0
2 0
18 0
~
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
e 7
0 23 0-g 0
24 0
4 9
0 33 o
i 10 0
26 0
)
II O
27 0
['
12 0
28 0
L 13 0
29 0
f 14 0
30 0
IS 0
33 0
16 0
"l INSTRUCTIONS u
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Co h.
the nearest whole megawait.
^
h (9/77) 7 d
ik r:.
l.
(.
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 UNIT NAME - F LCllP-3 DATE 5/1/86 REPORT MONTil 4/86 COMPLETED BY It nenhnm TELEPHONE (904) 795-6486 e.
.$ g "h
3.Y Licensee E 9, Cause & Corrective No.
Date g
5g s
sec Event g '2 Action to H
$E 5
j i?3 g Report #
mu Prevent Recurrence g
c5 86-01 860101 F
719.0 A
4 86-01 CB PUMPXX The four reactor coolant pumps are being modified and repaired with new pump shafts.
I 2
3 4
F: Forced Reason:
Method Exhibit G. Instructions 5: Scheduled A Equipment Failure (Explain) for Preparation of Data 1-M
- 1 B-Maintenance of Test 2-M 1 Scram Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LER) File INUREG-D-Regulatory Restriction 4-Continued 0161)
E-Operator Training & Ucense Examination 5-Reduced Load F Administrative
'-UEh'"
5 G-Operational Error (Explain)
Exhibit I. Same Source 19/77)
Il-Other (Explain) e
,17e
, pp.r -
=g.'737 1: y;
.o MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/1/86 COMPLETED BY D. Grnhnm TELEPHONE (904) 795-6486 MONTH April 1986
SUMMARY
STATEMENT:
CR-3 remains off-line for repair of all Reactor Coolant pumps.
6 h.
,e e
6 4
b T
t
'f V$
7:.
.P D
k$
i e
Yi f
h w
0.:
NI S
5!Vv t
r.-
I:U t.-
5.t
e c.
hO 00l*
(
'e Power CO R POR ATION May 5, 1986 3F0586-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 April 1986 Monthly Operating, fgport.
These reports are submitted in accordance with Technical Specifiqation 6.9.1.6.
Sincerely, R. C.'sWidell Managi/r, Nuclear Operations Licensing and Fuel Management AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323
/.1
/[M
'{t GENERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042. St. Petersburg, Florida 33733 *S13-866-5151
)