RBG-25461, Application for Amend to License NPF-47,changing Tech Specs to Extend Surveillance Interval for Surveillance Requirements to First Refueling Outage Scheduled to Begin on 870915.Fee Paid

From kanterella
Revision as of 01:54, 7 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Application for Amend to License NPF-47,changing Tech Specs to Extend Surveillance Interval for Surveillance Requirements to First Refueling Outage Scheduled to Begin on 870915.Fee Paid
ML20205C723
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/10/1987
From: Deddens J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205C727 List:
References
RBG-25461, TAC-65128, TAC-65129, NUDOCS 8703300245
Download: ML20205C723 (3)


Text

_ _

GULF STATES UTILITIES COMPANY RIVER BEND $TATION POST OFFICE BOX 220 ST. FRANCISVILLE, LOUISIANA 70775 AREA CODE 504 635-6094 346-8651 March 10, 1987 RBG- 25461 File Nos. G9.5, G9.25.1.4 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

River Bend. Station - Unit 1 Docket No. 50-458 Gulf States Utilities (GSU) hereby files an amendment to the River Bend Station Unit 1 Technical Specifications, Appendix A to Facility Operating License NPF-47, pursuant to 10CFR50.90. This application is filed to extend the surveillance interval.

Attachments 1 through 4 include the proposed revisions and justifications to the River Bend Station Technical Specifications.

The River Bend Station Technical Specifications require certain Surveillance Tests to be performed every eighteen (18) months (including Specification 4.0.2 where applicable). The proposed changes request an extension to.the surveillance interval for the subject Surveillance Requirements to the first refueling outage scheduled to begin on September 15, 1987. GSU is presently in compliance with Technical Specification requirements. In addition, GSU will make a good faith effort to perform the required surveillance testing where possible during an unscheduled outage of sufficient length.

The revisions discussed in the attachments are required beginning in August, 1987 to avoid a River Bend Station shutdown. Pursuant to 10CFR70.12, GSU has enclosed a check in the amount of one-hundred and fifty dollars ($150.00) for the license amendment application fee. Your prompt attention to this application is appreciated.

Sincerely, 8703300245 B70310 PDR P

ADOCK 05000458 PDR

. C. Deddens Senior Vice President 3 River Bend Nuclear Group ,0 0 JCD/ /k / /je ch*g1d 3k Attachments p-llf l ROOl

IMIT!!D SMHlS T NERICA NNTFAR RPY3NA7tRY (X38(ISSICE S'DGE (F IOUISIANA

  • PARISH T MEST FELICIANA
  • In the Matter of
  • Docket Nos. 50-458 GEE S'5GES (71'ILITIES CX3fANY *

(River Bend Station, Unit 1)

AFFIDAVIT J. C. Deddens, being duly sworn, states that he is a Senior Vice President of Gulf States Utilities Cmpany; that he is authorized on the part of said Ompany to sign and file with the Nuclear Regulatory Ocunission the hwnts attached hereto; and that all such hwnts are true and correct to the best of his knowledge, information and belief.

./

J. M. Deddens subscribed and sworn to before me, a Notary Public in and for the StateandandParishabovenamed,thisf day of MflVT) , 19 .

frt s ) f/ Lir 4

,/Joan W. Middlebrooks

' Notary Public in and for West Feliciana Parish, Iouisiana My Ccmnission is for Life.

T c, . f

- q s

K ,. I*

=INDEX

' Technical Attachment Specification Subject 1- 4.4.2.1.1(b) Safety Relief Valves

'2 4'.6.2.2' Drywell Bypass. Leakage 3- 4.6.6'2(c)

. Primary Containment /Drywell Hydrogen Mixing 4 a. 4.4.3.2.2a Leak Rate Tests

b. ~4.6.1.3d Leak-Rate Tests
c. 4.6.1.3f Leak Rate Tests
d. 4.6.1.31 Leak Rate Tests'
e. 4.6.2.3.d.2 Leak Rate Tests 4.6.2.1.e.2 Leak Rate Tests