Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARRBG-45077, Application for Amend to License NPF-47 to Change TS to Extend Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt.Encl Proprietary GE Rept NEDC-32778P Withheld1999-07-30030 July 1999 Application for Amend to License NPF-47 to Change TS to Extend Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt.Encl Proprietary GE Rept NEDC-32778P Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 RBG-44721, Application for Amend to License NPF-47,proposing Change to TS Safety Limit 2.1.1.2.Amend Will Change Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13.Proprietary Encl Withheld1998-12-16016 December 1998 Application for Amend to License NPF-47,proposing Change to TS Safety Limit 2.1.1.2.Amend Will Change Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13.Proprietary Encl Withheld RBG-44726, Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 19981998-11-20020 November 1998 Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 1998 RBG-44593, Application for Amend to License NPF-47,implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution,Enhanced Option I-A1998-10-0808 October 1998 Application for Amend to License NPF-47,implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution,Enhanced Option I-A 05000458/LER-1997-004, LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-131998-09-23023 September 1998 LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-13 RBG-44562, LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs1998-09-22022 September 1998 LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs RBG-44457, Application for Amend to License NPF-47,revising License Condition 2.C(13) Concerning Final Feedwater Temp Reduction Analysis, LAR 97-16.Affidavit Supporting LAR & Proprietary GE Rept NEDC-32549P,dtd May 1997,encl1998-04-0909 April 1998 Application for Amend to License NPF-47,revising License Condition 2.C(13) Concerning Final Feedwater Temp Reduction Analysis, LAR 97-16.Affidavit Supporting LAR & Proprietary GE Rept NEDC-32549P,dtd May 1997,encl RBG-44223, Application for Amend to License NPF-47,proposing Addl Change to Administrative Controls Associated W/Lar 97-18. Change Listed1997-09-19019 September 1997 Application for Amend to License NPF-47,proposing Addl Change to Administrative Controls Associated W/Lar 97-18. Change Listed RBG-44153, Forwards Proposed Administrative Changes to LAR 96-42 & LAR 97-18,to Modify TS 2.1.1.2 W/Note Indicating Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents1997-08-15015 August 1997 Forwards Proposed Administrative Changes to LAR 96-42 & LAR 97-18,to Modify TS 2.1.1.2 W/Note Indicating Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents RBG-44035, Application for Amend to License NPF-47,changing TS Safety Limit 2.1.1.2, Reactor Core (Safety Limits), to Increase Two Recirculation Loop MCPR Limit to 1.13.Proprietary Info Encl.Proprietary Encl Withheld1997-08-0505 August 1997 Application for Amend to License NPF-47,changing TS Safety Limit 2.1.1.2, Reactor Core (Safety Limits), to Increase Two Recirculation Loop MCPR Limit to 1.13.Proprietary Info Encl.Proprietary Encl Withheld RBG-43608, Application for Amend to License NPF-47,to Enhance Operation of Plant,Thereby Yielding Economic Benefit to RBS Through Extended Power production.NEDC-32611P Encl.Rept Withheld1997-01-20020 January 1997 Application for Amend to License NPF-47,to Enhance Operation of Plant,Thereby Yielding Economic Benefit to RBS Through Extended Power production.NEDC-32611P Encl.Rept Withheld RBG-43560, Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits1997-01-10010 January 1997 Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits RBG-43328, Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 21996-11-15015 November 1996 Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 2 RBG-43326, Application for Amend to License NPF-47,changing TS SL 2.1.1.2, Reactor Core (Safety Limits), Which Will Increase Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR Limit from 1.08 to 1.121996-11-15015 November 1996 Application for Amend to License NPF-47,changing TS SL 2.1.1.2, Reactor Core (Safety Limits), Which Will Increase Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR Limit from 1.08 to 1.12 ML20134H4051996-11-0606 November 1996 Application for Amend to License NPF-47,requesting Single Deviation from Approved Fire Protection Program IAW Change Process RBG-43358, Application for Amend to License NPF-47,permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Main steam-positive Leakage Control Sys Requirements1996-11-0606 November 1996 Application for Amend to License NPF-47,permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Main steam-positive Leakage Control Sys Requirements RBG-43243, LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-011996-10-24024 October 1996 LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-01 RBG-43042, License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl1996-08-29029 August 1996 License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl RBG-43161, Application for Amend to License NPF-47 Revising TS Re Engineered Safety Systems Which Address Core Reactivity & Power1996-08-29029 August 1996 Application for Amend to License NPF-47 Revising TS Re Engineered Safety Systems Which Address Core Reactivity & Power RBG-42913, Application for Amend to License NPF-47,revising Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves1996-08-0101 August 1996 Application for Amend to License NPF-47,revising Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks RBG-42946, Application for Amend to License NPF-47,consisting of Licensing Amend Request 96-25 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG in TS 3.8.31996-05-30030 May 1996 Application for Amend to License NPF-47,consisting of Licensing Amend Request 96-25 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG in TS 3.8.3 RBG-42920, License Amend Request (LAR) 96-29 to License NPF-29, Reflecting Change in Name from Gulf States Utils Co to Entergy Gulf States,Inc1996-05-20020 May 1996 License Amend Request (LAR) 96-29 to License NPF-29, Reflecting Change in Name from Gulf States Utils Co to Entergy Gulf States,Inc RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells RBG-42191, LAR 95-22,proposing Changes to Ts,By Eliminating Selected Response Time Testing Requirements1995-11-20020 November 1995 LAR 95-22,proposing Changes to Ts,By Eliminating Selected Response Time Testing Requirements RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage RBG-41968, Application for Amend to License NPF-47,consisting of Change Request 95-10,deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections1995-10-26026 October 1995 Application for Amend to License NPF-47,consisting of Change Request 95-10,deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections RBG-42084, Application for Amend to License NPF-47,consisting of LAR 95-21,changing TS 3.6.1.1 Through 3.6.1.3 Re Containment Sys & Notifies of Intent to Implement performance-based Containment Leak Rate Testing Program1995-10-24024 October 1995 Application for Amend to License NPF-47,consisting of LAR 95-21,changing TS 3.6.1.1 Through 3.6.1.3 Re Containment Sys & Notifies of Intent to Implement performance-based Containment Leak Rate Testing Program RBG-41728, LAR 95-04 to License NPF-47,revising TS Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions1995-08-17017 August 1995 LAR 95-04 to License NPF-47,revising TS Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions RBG-41632, Application for Amend to License NPF-47.Amend Will Implement TSs Based on NUREG-1434, Improved Tss,Rev 01995-06-30030 June 1995 Application for Amend to License NPF-47.Amend Will Implement TSs Based on NUREG-1434, Improved Tss,Rev 0 RBG-41525, Application for Amend to License NPF-47,allowing TS 3/4.6.2.2, Drywell Bypass Leakage, to Be Performed at Intervals as Long as Five Yrs Based Upon Demonstrated Performance of Drywell Structure1995-05-30030 May 1995 Application for Amend to License NPF-47,allowing TS 3/4.6.2.2, Drywell Bypass Leakage, to Be Performed at Intervals as Long as Five Yrs Based Upon Demonstrated Performance of Drywell Structure RBG-41524, Application for Amend to License NPF-47,applying for Exemption from 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors1995-05-30030 May 1995 Application for Amend to License NPF-47,applying for Exemption from 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors RBG-41159, LAR 95-01 to License NPF-47,requesting Deviation from 10CFR50,App R,Section III.G.3 W/Respect to Requirement for Fixed Fire Suppression Sys in Fire Area C-17 in Order to Credit Remote Shutdown Sys for Shutdown in Event of Fire1995-01-20020 January 1995 LAR 95-01 to License NPF-47,requesting Deviation from 10CFR50,App R,Section III.G.3 W/Respect to Requirement for Fixed Fire Suppression Sys in Fire Area C-17 in Order to Credit Remote Shutdown Sys for Shutdown in Event of Fire ML20077S4381995-01-18018 January 1995 Application for Amend to License NPF-47 Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20024J3321994-10-0404 October 1994 LAR 94-11,revising TS 4.11.2.1.2 Table 4.11.2.1.2-1,by Removing one-hour Requirement for Completing Noble Gas & Tritium Sampling & Analysis RBG-40868, LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-021994-09-12012 September 1994 LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-02 ML20072U7861994-09-0808 September 1994 Application for Amend to License NPF-47,changing TS 3.10.2, Special Test Exceptions - Rod Pattern Control Sys RBG-40366, LAR 93-12 to License NPF-47,revising TS to Remove Turbine Overspeed Protection Sys Requirements1994-03-15015 March 1994 LAR 93-12 to License NPF-47,revising TS to Remove Turbine Overspeed Protection Sys Requirements RBG-40324, Application for Amend to License NPF-47,consisting of LAR 94-02,relocating Response Time Limits to Usar,Per GL 93-081994-03-0303 March 1994 Application for Amend to License NPF-47,consisting of LAR 94-02,relocating Response Time Limits to Usar,Per GL 93-08 ML20063K3691994-02-22022 February 1994 Application for Amend to License NPF-47,requesting Line Item Improvement Consistent W/Tech Specs 3.6.1.8 & 3.6.1.9 of NUREG-1434, Std TS GE Plants,BWR/6 RBG-39894, Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-081994-01-14014 January 1994 Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-08 RBG-39895, Application for Amend to License NPF-47,extending Allowable Outage Times of Instruments Involved & Increase Channel Functional Surveillance Test Interval from Monthly to Quarterly Requirement.Proprietary Rept Encl1994-01-14014 January 1994 Application for Amend to License NPF-47,extending Allowable Outage Times of Instruments Involved & Increase Channel Functional Surveillance Test Interval from Monthly to Quarterly Requirement.Proprietary Rept Encl RBG-39796, Application for Amend to License NPF-47,revising Applicable Tech Specs for one-time Extension Re Valve Leak Rate Testing1993-12-21021 December 1993 Application for Amend to License NPF-47,revising Applicable Tech Specs for one-time Extension Re Valve Leak Rate Testing ML20058H2221993-12-0808 December 1993 Application for Amend to License NPF-47,revising TS Re Sys Testing & Instrumentation Calibration,Response Time Testing & Lfst to Allow one-time Extension of Surveillance Intervals RBG-39478, Application for Amend to License NPF-47,proposing Changes to Improve TS Through Implementation of Guidance in NUREG-1434, Sts,Ge Plants BWR/6, Rev 01993-11-30030 November 1993 Application for Amend to License NPF-47,proposing Changes to Improve TS Through Implementation of Guidance in NUREG-1434, Sts,Ge Plants BWR/6, Rev 0 ML20058C4121993-11-18018 November 1993 Application for Amends to License NPF-47,revising TS Re Valve Leak Rate Testing to Allow one-time Extension of Surveillance Intervals ML20045G2471993-07-0202 July 1993 Application for Amend to License NPF-47,revising TS 6.9.3.2,part of Colr.Revision Indicates Cycle 5 Impact on Operating Limit Not Due to Core Verifications ML20045G8381993-07-0202 July 1993 Application for Amend to License NPF-47,revising TS to Change Frequency for Submittal of Radioactive Effluent Release Repts from Semiannual to Annual & to Extend Preparation Period from 60 Days to 90 Days ML20044D5391993-05-13013 May 1993 Application for Amend to License NPF-47,changing Attachment 3 to License NPF-47,Amend 15, Tdi Diesel Engines Requirements. Group Cross Ref Table Between NUREG-1216 & Current River Bend Status Encl 1999-07-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARRBG-45077, Application for Amend to License NPF-47 to Change TS to Extend Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt.Encl Proprietary GE Rept NEDC-32778P Withheld1999-07-30030 July 1999 Application for Amend to License NPF-47 to Change TS to Extend Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt.Encl Proprietary GE Rept NEDC-32778P Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 RBG-44721, Application for Amend to License NPF-47,proposing Change to TS Safety Limit 2.1.1.2.Amend Will Change Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13.Proprietary Encl Withheld1998-12-16016 December 1998 Application for Amend to License NPF-47,proposing Change to TS Safety Limit 2.1.1.2.Amend Will Change Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13.Proprietary Encl Withheld RBG-44726, Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 19981998-11-20020 November 1998 Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 1998 RBG-44593, Application for Amend to License NPF-47,implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution,Enhanced Option I-A1998-10-0808 October 1998 Application for Amend to License NPF-47,implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution,Enhanced Option I-A 05000458/LER-1997-004, LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-131998-09-23023 September 1998 LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-13 RBG-44562, LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs1998-09-22022 September 1998 LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs RBG-44457, Application for Amend to License NPF-47,revising License Condition 2.C(13) Concerning Final Feedwater Temp Reduction Analysis, LAR 97-16.Affidavit Supporting LAR & Proprietary GE Rept NEDC-32549P,dtd May 1997,encl1998-04-0909 April 1998 Application for Amend to License NPF-47,revising License Condition 2.C(13) Concerning Final Feedwater Temp Reduction Analysis, LAR 97-16.Affidavit Supporting LAR & Proprietary GE Rept NEDC-32549P,dtd May 1997,encl RBG-44223, Application for Amend to License NPF-47,proposing Addl Change to Administrative Controls Associated W/Lar 97-18. Change Listed1997-09-19019 September 1997 Application for Amend to License NPF-47,proposing Addl Change to Administrative Controls Associated W/Lar 97-18. Change Listed RBG-44153, Forwards Proposed Administrative Changes to LAR 96-42 & LAR 97-18,to Modify TS 2.1.1.2 W/Note Indicating Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents1997-08-15015 August 1997 Forwards Proposed Administrative Changes to LAR 96-42 & LAR 97-18,to Modify TS 2.1.1.2 W/Note Indicating Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents RBG-44035, Application for Amend to License NPF-47,changing TS Safety Limit 2.1.1.2, Reactor Core (Safety Limits), to Increase Two Recirculation Loop MCPR Limit to 1.13.Proprietary Info Encl.Proprietary Encl Withheld1997-08-0505 August 1997 Application for Amend to License NPF-47,changing TS Safety Limit 2.1.1.2, Reactor Core (Safety Limits), to Increase Two Recirculation Loop MCPR Limit to 1.13.Proprietary Info Encl.Proprietary Encl Withheld RBG-43608, Application for Amend to License NPF-47,to Enhance Operation of Plant,Thereby Yielding Economic Benefit to RBS Through Extended Power production.NEDC-32611P Encl.Rept Withheld1997-01-20020 January 1997 Application for Amend to License NPF-47,to Enhance Operation of Plant,Thereby Yielding Economic Benefit to RBS Through Extended Power production.NEDC-32611P Encl.Rept Withheld RBG-43560, Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits1997-01-10010 January 1997 Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits RBG-43326, Application for Amend to License NPF-47,changing TS SL 2.1.1.2, Reactor Core (Safety Limits), Which Will Increase Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR Limit from 1.08 to 1.121996-11-15015 November 1996 Application for Amend to License NPF-47,changing TS SL 2.1.1.2, Reactor Core (Safety Limits), Which Will Increase Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR Limit from 1.08 to 1.12 RBG-43328, Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 21996-11-15015 November 1996 Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 2 ML20134H4051996-11-0606 November 1996 Application for Amend to License NPF-47,requesting Single Deviation from Approved Fire Protection Program IAW Change Process RBG-43358, Application for Amend to License NPF-47,permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Main steam-positive Leakage Control Sys Requirements1996-11-0606 November 1996 Application for Amend to License NPF-47,permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Main steam-positive Leakage Control Sys Requirements RBG-43243, LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-011996-10-24024 October 1996 LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-01 RBG-43042, License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl1996-08-29029 August 1996 License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl RBG-43161, Application for Amend to License NPF-47 Revising TS Re Engineered Safety Systems Which Address Core Reactivity & Power1996-08-29029 August 1996 Application for Amend to License NPF-47 Revising TS Re Engineered Safety Systems Which Address Core Reactivity & Power RBG-42913, Application for Amend to License NPF-47,revising Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves1996-08-0101 August 1996 Application for Amend to License NPF-47,revising Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks RBG-42946, Application for Amend to License NPF-47,consisting of Licensing Amend Request 96-25 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG in TS 3.8.31996-05-30030 May 1996 Application for Amend to License NPF-47,consisting of Licensing Amend Request 96-25 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG in TS 3.8.3 RBG-42920, License Amend Request (LAR) 96-29 to License NPF-29, Reflecting Change in Name from Gulf States Utils Co to Entergy Gulf States,Inc1996-05-20020 May 1996 License Amend Request (LAR) 96-29 to License NPF-29, Reflecting Change in Name from Gulf States Utils Co to Entergy Gulf States,Inc RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells RBG-42191, LAR 95-22,proposing Changes to Ts,By Eliminating Selected Response Time Testing Requirements1995-11-20020 November 1995 LAR 95-22,proposing Changes to Ts,By Eliminating Selected Response Time Testing Requirements RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage RBG-41968, Application for Amend to License NPF-47,consisting of Change Request 95-10,deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections1995-10-26026 October 1995 Application for Amend to License NPF-47,consisting of Change Request 95-10,deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections RBG-42084, Application for Amend to License NPF-47,consisting of LAR 95-21,changing TS 3.6.1.1 Through 3.6.1.3 Re Containment Sys & Notifies of Intent to Implement performance-based Containment Leak Rate Testing Program1995-10-24024 October 1995 Application for Amend to License NPF-47,consisting of LAR 95-21,changing TS 3.6.1.1 Through 3.6.1.3 Re Containment Sys & Notifies of Intent to Implement performance-based Containment Leak Rate Testing Program RBG-41728, LAR 95-04 to License NPF-47,revising TS Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions1995-08-17017 August 1995 LAR 95-04 to License NPF-47,revising TS Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions RBG-41632, Application for Amend to License NPF-47.Amend Will Implement TSs Based on NUREG-1434, Improved Tss,Rev 01995-06-30030 June 1995 Application for Amend to License NPF-47.Amend Will Implement TSs Based on NUREG-1434, Improved Tss,Rev 0 RBG-41524, Application for Amend to License NPF-47,applying for Exemption from 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors1995-05-30030 May 1995 Application for Amend to License NPF-47,applying for Exemption from 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors RBG-41525, Application for Amend to License NPF-47,allowing TS 3/4.6.2.2, Drywell Bypass Leakage, to Be Performed at Intervals as Long as Five Yrs Based Upon Demonstrated Performance of Drywell Structure1995-05-30030 May 1995 Application for Amend to License NPF-47,allowing TS 3/4.6.2.2, Drywell Bypass Leakage, to Be Performed at Intervals as Long as Five Yrs Based Upon Demonstrated Performance of Drywell Structure RBG-41159, LAR 95-01 to License NPF-47,requesting Deviation from 10CFR50,App R,Section III.G.3 W/Respect to Requirement for Fixed Fire Suppression Sys in Fire Area C-17 in Order to Credit Remote Shutdown Sys for Shutdown in Event of Fire1995-01-20020 January 1995 LAR 95-01 to License NPF-47,requesting Deviation from 10CFR50,App R,Section III.G.3 W/Respect to Requirement for Fixed Fire Suppression Sys in Fire Area C-17 in Order to Credit Remote Shutdown Sys for Shutdown in Event of Fire ML20077S4381995-01-18018 January 1995 Application for Amend to License NPF-47 Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20024J3321994-10-0404 October 1994 LAR 94-11,revising TS 4.11.2.1.2 Table 4.11.2.1.2-1,by Removing one-hour Requirement for Completing Noble Gas & Tritium Sampling & Analysis RBG-40868, LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-021994-09-12012 September 1994 LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-02 ML20072U7861994-09-0808 September 1994 Application for Amend to License NPF-47,changing TS 3.10.2, Special Test Exceptions - Rod Pattern Control Sys RBG-40366, LAR 93-12 to License NPF-47,revising TS to Remove Turbine Overspeed Protection Sys Requirements1994-03-15015 March 1994 LAR 93-12 to License NPF-47,revising TS to Remove Turbine Overspeed Protection Sys Requirements RBG-40324, Application for Amend to License NPF-47,consisting of LAR 94-02,relocating Response Time Limits to Usar,Per GL 93-081994-03-0303 March 1994 Application for Amend to License NPF-47,consisting of LAR 94-02,relocating Response Time Limits to Usar,Per GL 93-08 ML20063K3691994-02-22022 February 1994 Application for Amend to License NPF-47,requesting Line Item Improvement Consistent W/Tech Specs 3.6.1.8 & 3.6.1.9 of NUREG-1434, Std TS GE Plants,BWR/6 RBG-39895, Application for Amend to License NPF-47,extending Allowable Outage Times of Instruments Involved & Increase Channel Functional Surveillance Test Interval from Monthly to Quarterly Requirement.Proprietary Rept Encl1994-01-14014 January 1994 Application for Amend to License NPF-47,extending Allowable Outage Times of Instruments Involved & Increase Channel Functional Surveillance Test Interval from Monthly to Quarterly Requirement.Proprietary Rept Encl RBG-39894, Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-081994-01-14014 January 1994 Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-08 RBG-39796, Application for Amend to License NPF-47,revising Applicable Tech Specs for one-time Extension Re Valve Leak Rate Testing1993-12-21021 December 1993 Application for Amend to License NPF-47,revising Applicable Tech Specs for one-time Extension Re Valve Leak Rate Testing ML20058H2221993-12-0808 December 1993 Application for Amend to License NPF-47,revising TS Re Sys Testing & Instrumentation Calibration,Response Time Testing & Lfst to Allow one-time Extension of Surveillance Intervals RBG-39478, Application for Amend to License NPF-47,proposing Changes to Improve TS Through Implementation of Guidance in NUREG-1434, Sts,Ge Plants BWR/6, Rev 01993-11-30030 November 1993 Application for Amend to License NPF-47,proposing Changes to Improve TS Through Implementation of Guidance in NUREG-1434, Sts,Ge Plants BWR/6, Rev 0 ML20058C4121993-11-18018 November 1993 Application for Amends to License NPF-47,revising TS Re Valve Leak Rate Testing to Allow one-time Extension of Surveillance Intervals ML20045G8381993-07-0202 July 1993 Application for Amend to License NPF-47,revising TS to Change Frequency for Submittal of Radioactive Effluent Release Repts from Semiannual to Annual & to Extend Preparation Period from 60 Days to 90 Days ML20045G2471993-07-0202 July 1993 Application for Amend to License NPF-47,revising TS 6.9.3.2,part of Colr.Revision Indicates Cycle 5 Impact on Operating Limit Not Due to Core Verifications ML20044D5391993-05-13013 May 1993 Application for Amend to License NPF-47,changing Attachment 3 to License NPF-47,Amend 15, Tdi Diesel Engines Requirements. Group Cross Ref Table Between NUREG-1216 & Current River Bend Status Encl 1999-07-30
[Table view] |
Text
-. . .. . -.- . - - . . - - - . - -
1 i
BEFORE THE UNITED STATES NUCLEAR REGULATORY COh1 MISSION
.)
LICENSE NO NPF-47 DOCKET NO. 50-458 i
IN THE MATTER OF l i
i GULF STATES UTILITIES COMPANY ,
l CAJUN ELECTRIC POWER COOPERATIVE AND ENTERGY OPERATIONS, INC.
1 AFFIPMATION I, John R. McGaha, state that I am Vice President-Operations'of Entergy Operations, Inc., at kiver I l Bend Station; that on behalf of Entergy Operations, Inc., I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this License Amendment Request l #94-09 for the River Bend Station; that I signed this License Amendment Request as Vice President-Operations at River Bend Station of Entergy Operations, Inc.; and that the statements made and the j matters set forth therein are tnie and correct to the best of my knowledge, information, and belief. 1 k
Jofm R. McGaha STATE OF LOUISIANA l
WEST FELICIANA PARISH l
SUBSCRIBED AND SWORN TO before me, a Notary Public, in and for the County and State above named, this N day of de nX imh.%
f
,1994.
(SEAL) .
N&W1 L A k)7AA&C Notary Public My commission expires: dLp I
9409190025 940908 PDR i P ADOCK 05000458 ono .
r Licensing Amendment Request (LAR) 94-09 l RBG-40863 i At'achment t 1 i Page1 of 8 l Reason for Request i f Recently EOI has determined that a small fuel leak exists in the reactor core at RBS.
After reviewing related industry experience (GE SIL 379 Revision 1, " Power Suppression Testing" dated July 16,1993) and consulting with the fuel vendor (General
! Electric), EOI has decided to perform a power suppression test to determine the ;
location of the fuel leak. Once this location has been determined, actions can be taken )
to suppress the local power in the region of the fuel leaker, thereby n ducing the l l potential for funher damage to the cladding.
The proposed testing will minimize the nodal power transient caused when withdrawing j the control rod. If the control rod is allowed to stop and settle at intermediate positions !
l as required by the Rod Pattern Control System (RPCS) rod withdrawal limiter (RWL),
the thermal heat flux will come into equilibrium with the neutron flux off the tip of the control rod. This local increase in power could adversely affect the leaking fuel rod if the clad defect is located in this region. Therefore, the proposed test requires l continuous control rod withdrawal. EOI has determined that to support power suppression testing, bypassing the control logic of the RPCS does not pose any significant hazard to the health and safety of the public.
l Analvtical and Desien 3 asis l
The RBS Updated Safety Analysis Report (USAR) identifies that the Anticipated Operational Occurrence (AOO) of concern is the Rod Withdrawal Error (RWE) above 20% thermal power. This event is mitigated by the Rod Withdraw Limiter (RWL)
! function of the Rod Pattern Control System (RPCS) which is in affect above the Low Power Set Point (LPSP). The RWE is discussed in USAR Section 15.4.2. The event occurs when the highest worth control md is withdrawn (either by operator error or l equipment malfunction) when at a limiting Critical Power Ratio (CPR) condition. This l event is terminated by the notch restmints imposed by the RWL prior to exceeding any fuel design limits. This analysis [ referenced in GESSAR II, Appendix 15B, BWR/6 Generic Rod Withdrawal Error Analysis 1 indicates that the fuel design limits will not be
! exceeded with these notch withdmwal hmitations imposed.
The RPCS is a safety-related system, the purpose of which is to limit the consequences of an accident to an acceptable level. This is accomplished by the control logic of the {
system which restricts the positioning of control rods that can be established to l
predetermined sets. The control logic is hardwired and is not site-programmable except via an engineering design change and modification of the system's electronic circuit cards. Rod position is the primary data input for the RPCS. Other inputs to the RPCS l
, l t
L
. Licensing Amendment Request (LAR) 94-09 RBG-40863 Att'achment 1 Page 2 of 8 controllers include reactor power level, mode of operation, identification of selected rod, and drive mode requested by the operator.
The RWL provides protection from control rod withdrawal error events during high power operation. The purpose of the RWL is to limit control rod withdrawal to preclude violating the minimum critical power ratio-safety limit (MCPR-SL) and the cladding 1 % plastic strain fuel design limit that may result from a single RWE event.
The RWL supplies a signal which appropriately inhibits control red withdrawal during power operation greater than or equal to the LPSP.
Analysis has demonstrated that the limiting parameter during a RWE cvent is the MCPR (GESSARII, Appendix 15B). The 1% plastic strain limit as measured by linear heat generation rate (LHGR) is not challenged by the RWE event.
The RWL is assumed to mitigate the consequences of an RWE event when operating above the LPSP. Below this power level, the sequence constraints imposed by the Rod Pattern Control System are more restrictive and hence the consequences of an RWE event will not exceed any fuel safety limits. Therefore, the RWL is not required to be operable.
The RPCS conservatively implements the RWL portion of the above requirements, govemed by Technical Specification 3.1.4.2. Technical Specification 3.1.4.2 specifies that the RWL function of RPCS be operable greater than or equal to the LPSP.
Technical Specification requirements for fuel thermal limits (3.2.3, LHGR and 3.2.4, CPR) administratively limit the initial core conditions in order to remain consistent with RWE analysis assumpticas.
The NRC Safety Evaluation Report (SER) (RBS NUREG 0989 ) Section 15.4.2 concurs with the above assessments for the following reasons:
- 1. The code used to analyze this transient is approved and accepted by the NRC;
- 2. The data used for the generic analyses covers a wide range of BWR/6 core sizes and exposures;
- 3. The allowed withdrawal distances are conservative with respect to the calculated results; and
- 4. The values of permitted initial CPR are conservative with regard to the transient results and calculated increases.
Licensing Amendment Request (LAR) 94-09 RBG-40863 Atfachment 1 Page 3 of 8 l
Specific Analysis and Limits Description i The special analysis as required by the proposed Technical Specification changes will be a test-specific analysis of the core and plant conditions for which the test is planned i to be performed. This analysis will set the control rod patterns and core conditions upon which CPR and LHGR analysis has been performed and supports the ,
requirements of the RWE analysis. l i
For power suppn ssion testing this analysis will have the following general l characteristics:
- 1. As a prerequisite panially insened control rods will be analyzed assuming the control rods are bypassed via the individual control rod bypass switches and pulled inadvenently from full-in to full-out (now allowed because the RWL function is bypassed for this test) at the anticipated test power condition. The analysis will confirm that inadvenent control rod withdrawal does not violate the CPR/LHGR fuel safety limits during control rod movement.
- 2. A control rod pattern for the test sha'l be established such that I above can be met.
This rod pattern will be administmtively controlled by the test procedure and will meet the assumptions of the analysis performed.
With the above two parameters set by analysis any single equipment malfunction or )
operator error will be within the RWE criteria. The established control rod test pattern will conform with the current Technical Specification requirements for operating thermal limits. With this requirement in place, control rods that are at the full-out position will meet the CPR and LHGR requirements during testing. Therefore, no specific RWE analysis is required for these control rods.
The special analysis methodology to be utilized will be similar to that utilized in the generic RWE approach. Specifically, a delta CPR/ Initial CPR (A/I) is calculated as a function of control rod withdrawal. The largest A/I is converted to the largest ACPR by assuming the Initial CPR was at the Operating Limit Minimum CPR (OLMCPR) at the proposed test power level. The calculated MCPR is then confirmed to be greater than the MCPR-SL plus an uncertainty margin based on the bias of the calculational code utilized. This analysis approach is conservative in that it assumes the actual change in CPR is from that of the maximum allowed value rather than the actual anticipated value. Since the analysis will be performed on a case-specific basis, the data will be accurate and up-to-date. LHGR limits will also he verified in a similar fashion, except that these limits will be calculated using actual values instead of assumed limiting values.
l Licensing Amendment Request (LAR) 94-09 RBG-40863 Attachment 1 Page 4 of 8 Proposed Test The power suppression test wiil be performed by reducing core power to approximately 65 % rated thermal power, establishing a pre-determined control rod test pattern in accordance with applicable analysis. The RPCS control logic will be bypassed allowing individual manual control rod manipulations using the continuous insenion/ withdrawal mode of the Rod Control and Information System. At the time of the test, approximately 120 control rods will be at the full-out position, with the remaining control rods partially inserted. Data will be collected during continuous manual insertion / withdrawal activities for the individual control rod being tested. The continuous withdrawal of a control rod will be limited to its' original pre-test position.
The control rod being tested must be returned to its' required test position and unbypassed prior to testing the next control rod. This control rod movement will be allowed by bypassing the individual control rods in the Rod Action Control System (RACS) cabinets. When the control rod is returned to its' required position, the associated bypass switches will be returned to their normal position. Bypass functions will be controlled administmtively by procedures.
The possibility of core damage and offsite dose releases exceeding the present design basis is not affected by this configuration because the administrative controls to be employed for this test prevent any adverse conditions from occurring.
Continuous control rod withdrawal is desired in order to limit the magnitude of the thermal flux peak which occurs when control rod motion is stopped at intermediate points (as required by the RWL when above the low power setpoint). If a control rod is pulled in a continuous motion, the neutron flux peak that follows the control rod will only exist at the various elevations of control rod travel for less than a second.
Therefore, the heat flux created by the neutron flux peak is minimized (due to the thermal time constant of the fuel pellet of approximately six seconds). Withdrawing a control rod past its original pre-test position is not desirable because such movement j could adversely affect a leaking fuel rod that could be uncovered by this maneuver.
To perform the power suppression test without risking further damage to the failed fuel assembly requires bypassing the control logic of the Rod Pattern Control System j
(RPCS) in accordance with Technical Specification 3.10.2, "Special Test Exceptions-l Rod Pattern Control System" Technical Specification 3.1.4.2, " Rod Pattern Control 1 System", requires the RPCS be operable such that certain sequence or notch restraints l are imposed on control rod groups based upon thermal power levels. EOI desires to l bypass the notch restraints imposed by the RPCS to allow for continuous rod withdrawal of an individual control rod to a specific notch position.
l l
Licensing Amendment Request (LAR) 94-09 RBG-40863 Attachment 1 Page 5 of 8 i
'erformance of power suppression testing without bypassing the RPCS notch ]
cor.straints was considered. Because of the potential to adversely affect the fuel failure ;
at these conditions and at the recommendation of the fuel vendor, the method described I in this submittal is required. I Proposed Change RBS would like to implement the proposed changes to Technical Specification 3.10.2 regarding controls of bypassing the RPCS sequence constraints for the purpose of power suppression testing. These proposed changes are consistent with Improved Technical Specification LCO 3.3.2.1, " Control Rod Block Instrumentat on",
allowances to bypass RWL functions for determining the location of leaking fuel assemblies.
Testing will be perfonned in accordance with REP-0038, " Power Suppression Testing". A surveillance test procedure, STP-500-0705, " Rod Sequence Verification When RPCS is Bypassed for Testing", will be used to control bypassing individual control rods in the RPCS. These administrative controls provide adequate assurance that movement of control rods will be limited to an established control rod sequence for the specified test. This allowance is consistent with present allowances in Technical Specification 3.10.2 for control rod testing. The above controls ensure that positioning and movement of bypassed control rods remain within the bounds of the appropriate analysis.
Presently, Technical Specification 3.10.2 allows the pattern constraints imposed by the RPCS to be bypassed using the individual rod position bypass switches for four specific tests, including scram time tests. This specification requires that additional administrative requirements be imposed when these sequence constraints are
" bypassed". The administrative requirements include specifying a second verification by either a licensed opemtor or other technically qualified member of the unit technical staff for the bypassed control rods as well as conformance with test control rod patterns. The applicable requirements to be performed to comply with Technical Specification 4.10.2, "Special Test Exceptions", will be maintained during the power suppression test. This proposal will expand this flexibility to allow the control rod to be bypassed for power suppression testing.
Implicit in this allowance is that control rod positioning be in conformance with applicable safety analysis; the generic RWE analysis or with a special analysis to ensure that the conclusions of the RWE analysis remains supported (described above). The power suppression testing performed under the proposed change will be more I
Licensing Amendment Request (LAR) 94-09 i , RBG-40863 Attachment 1 Page 6 of 8 conservative than the requirements imposed by the RWL, since the RPCS-bypassed control rod will not be withdrawn past its' original pre-test position. Therefore, the evolution is less severe than that assumed in the analysis.
When operating below the LPSP of the RPCS, the applicable analysis is the control rod drop accident (CRDA). Compliance with this analysis is ensured by conformance with the generic Banked Position Withdrawal Sequence (BPWS) analysis or a specific BPWS analysis for the evolution.
From the fomgoing discussion, it can be seen that bypassing the control logic of the RPCS and subsequent insertion / withdrawal of individual rods to their original position for the purpose of power suppression testing will not result in undue risks to the health and safety of the public.
No Sienificant Hazards Consideration
- 1) The mquest does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The event of concern is the RWE at power, which is assumed to occur when the highest worth contml rod is withdrawn while at a limiting CPR condition. The rod withdrawal limiter (RWL) provides protection for control rod withdrawal error events. The purpose of the RWL is to limit control rod withdrawal to preclude a violation of a fuel design limit.
Administrative controls for bypassing the RWL constraints in the RPCS will include; direct control to be maintained and an approved procedure to be used to control the bypassing of individual control rods in the RPCS. A test specific analysis will be performed assuming the RWE occurs and a test pattern will be administratively imposed (i.e. controlled by procedure) that precludes any violation of fuel safety limits.
Performance of the power suppression testing with RWL notch constraints bypassed will be more conservative since the bypassed control rod will not be withdrawn past its original pre-test position. The expected test conditions for which the power suppression test will be performed will also be much less than the assumed limiting thermal limit conditions expected by the safety analysis.
Therefore, the evolution is less severe than that assumed in the safety analysis.
If an operator continuously withdmws a previously partially inserted control rod to its' original position or beyond, an analysis will show there is no increase in
Licensing Amendment Request (LAR) 94-09 RBG-40863 l Att'achment 1
' Page 7 of 8 the consequences of a rod withdrawal error of the type described in the basis for Technical Specification 3.10.2. Therefore, the RPCS sequence constraints are not required for this special test, and the operation of the plant will remain as previously analyzed with the response of the plant within the limits of the analyses.
- 2) The request does not create the possibility of occurrence of a new or different l kind of accident from any accident previously evaluated.
l l Performance of the power suppression testing performed under the proposed change will be more conservative than previously reviewed events since the RPCS-bypassed control rod will not be withdrawn past its original pre-test position. Therefore, the power suppression testing evolution is less severe than that assumed in the safety analysis and the response of the plant will remain within previous analysis.
The positioning of control rods will be in conformance with applicable safety
- analysis; the generic RWE analysis or' with a special analysd, to ensure that the conclusions of the RWE analysis remains supported. The maintenance of these analysis limits will be through the use of administrative controls.
l The use of operational control in lieu of control rod blocks will assure this analysis remai::s supported. This action is consistent with present allowances in Technical Specification 3.10.2 Therefore the above administrative controls ensure that positioning and movement of bypassed control rods remain within the l bounds of the previous analysis.
- 3) The request does not involve a significant reduction in a margin of safety.
i Technical Specifications currently allow bypassing a single control rod for the purpose of fully withdrawing the control rod to perform the four tests specified in Technical Specincation 3.10.2. The margin of safety associated with the bypassing and withdrawal of control rods is established in the Technical i Speci5 cations for control rod scram time testing. Also the controls being placed on power suppression testing will assure fuel safety limits are met. Therefore, the margin of safety associated with power suppression testing is enveloped by the I margin of safety de6ned for current control rod testing.
Therefore, the analysis, the hardware controls, and the administrative requirements all suppon and meet the requirements of General Design Criteria 10, Fuel Design Limits I
Licensing Amendment Request (LAR) 94-09 RBG-40863 Attachment 1 Page 8 of 8 are not exceeded; 25, Protection System requirements for Reactivity Malfunctions; and 29, Protection against Anticipated Operational Occurrences.
Environmental Impact Consideration EOI has reviewed this Request against the criteria of 10CFR51.22 for environmental considerations. The request does not affect any system discharging radwaste to the environment or monitoring any such discharge. Also, the request does not adversely affect any system designed to monitor or isolate gaseous radioactive ef0uents to the environment. Therefore, the request; does not involve a significant hazards consideration, does not significantly increase the types or quantity of effluent that may be released offsite, and does not significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, EOI concludes that the proposed change meets the criteria given in 10CFR51.22 (c)(9) for a categorical exclusion from the requirement for an EnvironmentalImpact Statement.