Letter Sequence Request |
---|
|
|
MONTHYEARML20211P4991997-10-0909 October 1997 Summary of 970917 Meeting W/Vynp in Rockville,Maryland Re ASME Code Case N560.List of Meeting Attendees,Meeting Agenda & Meeting Handouts Encl Project stage: Meeting ML20216C8721998-03-11011 March 1998 Forwards RAI Re Implementation of ASME Code Case N560 at Plant Project stage: RAI ML20238F4081998-09-0101 September 1998 Informs That Requirement to Pay Fee Under 10CFR170 for Review of Licensee Pilot Plant Application for Use of Risk Informed Inservice Insp Methodologies for Vermont Yankee Plant,Waived Project stage: Approval ML20151S5611998-09-0404 September 1998 Discusses 980826 Conference Held Between Members of Vermont Yankee & NRC to Clarify Request to Implement ASME Code Case N560 at Plant.Understands That Licensee Will Provide Encl Info Re Qualification of NDE Examiner for Case Project stage: Approval ML20195C4031998-11-0909 November 1998 Forwards SE Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirements for Class 1, Category B-J Piping Welds, for Plant Project stage: Approval ML20203H9791999-02-18018 February 1999 Forwards SER Accepting Licensee 970123 Info Supporting Util Determination That Exam Coverage Achieved During Reactor Pressure Vessel Shell Weld Insp Constitutes Alternative Which Provides Acceptable Level of Quality & Safety Project stage: Approval ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 Project stage: Request 1998-09-01
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation BVY-94-105, Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations1994-12-0808 December 1994 Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations 1999-09-21
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20212C2521999-09-17017 September 1999 Amend 175 to License DPR-28,revising TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System & Incorporate Certain Provisions of NRC Rule on Anticipated Transients BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation 1999-09-21
[Table view] |
Text
l
' l VERMONT YANKEE y NUCLEAR POWER CORPORATION I
- 185 Old Ferry Road, Brattleboro, VT 05301 7002 l (802) 257-5271 ;
April 16,1999 BVY 99-13 U.S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555
References:
(a) NRC Generic Letter 88-01,"NRC Position on IGSCC in BWR Austenitic ,
Stainless Steel Piping," NVY 88-09, dated January 25,1988.
(b) American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI,1986 Edition, " Rules for Inservice Inspection of Nuclear Power Plant Components".
(c) ASME Code Case N-560, " Alternative Examination Requirements for Class 1, Category B-J Piping Welds," approved August 9,1996.
(d) Letter USNRC to VYNPC, " Request to Use Code Case N-560 as an Alternative to the Requirements of ASME Code,Section XI, Table IWB- i l 2500-1 At VYNPC (TAC No. M99389)," NVY 98-155, dated November 9, l 1998.
Subject:
Vermont Yankee Nuclear Power Station License No. DPR 28 (Docket No. 50-271)
ProDosed Channe No. 213 - Generie Letter 88-01 and Use of Code Case N-560 Pursuant to 10CFR50.90, Vermont Yankee (VY) hereby proposes to amend its Facility Operating /
License, DPR-28, by incorporating the attached proposed change into the VY Technical I j
Specifications. This proposed change will modify the inservice inspection requirements of Section 4.6.E to allow NRC-approved alternatives to Generic Letter (GL) 88-01. The NRC in reference (d) has recently approved use of ASME Code Case N-560 for inservice inspetion of j Class 1 piping welds at VYe This initiative affects the sample selection and inspection schedule )l$
criteria given in GL 88-01. Specifically, the Code Case permits selection of 10% of Category B-J welds for inspection (versus the 25% we committed to under OL 88-01 and ASME Section XI),
provided the welds selected have been determined, using risk-informed analytical methods, to be those most susceptible to the applicable failure mechanisms (Intergranular Stress Corrosion Cracking, Flow-Accelerated Corrosion, etc). Thus, Code Case N-560 provides an NRC-approved
! alternative to certain of the criteria specified in GL 88-01. The basis for this request is the same as the basis for approval to use ASME Code Case N-560.
Attachment I to this letter contains supporting information and the safety assessment for the proposed change. Attachment 2 contains the determination of no significant hazards consideration. Attachment 3 provides a mark-up of the carrent Technical Specification pages.
Attachment 4 provides the retyped Technical Specification pages.
I VY has reviewed the proposed Technical Specification change in accordance with 10CFR50.92 and concludes that the proposed change does not involve a significant hazards consideration.
~~
9904260208 990416 PDR ADOCK 05000271 i P PDR _
l l.
VEnMoN r YANME Nrcu;An PowLn ConconmoN BVY 99-13 \ Page 2 of2 9 a VY has also reviewed the proposed change against the criteria of 10CFR51.22 for environmental considerations and concludes that the proposed change will not increase the types and amounts of effluents that may be released offsite. Thus, VY believes that the proposed change is eligible for categorical exclusion from the requirements for an environmental impact statement in accordance with 10CFRSI.22(c)(9).
VY will be completing examinations for the second period of the third inspection interval during our Fall 1999 refueling outage and therefore requests review and approval of this amendment by September 1999.
If you have any questions regarding this submittal, please contact Mr. Wayne M. Limberger at (802)258-4237.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION Robert J. Wahk Director of Safety and Regulatory Affairs Attachments p $f cc: USNRC Region 1 Administrator USNRC Resident inspector-VYNPS
' pf#%[k USNRC Project Manager-VYNPS ,
NOUM b$ " hB Vermont Department of Public Service g, t _ pg31 J CI t. f d '/,
~
STATE OF VERMONT )
v8f[OUMD *dv',f WINDHAM COUNTY )
)ss -
~# 1 /
Then personally appeared 1 efore me, Robert L Wanczyk, who being duly swom, did state that he is Director of Safety and Regulatory Affairs of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing document in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are tme to the best of his knowledge and belief.
Eintly A. Sa6dstrum; Notary Public My Commission Expires February 2,2003
1 Docket No. 50-271 BVY 99-13 I
4 l
l l
Attachment i Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 213 Generic Letter 88-01 and Use of Code Case N-560 l
Supporting Information and Safety Assessment for Proposed Change 4
=
l d
BVY 99-13 / Attachent I /l' age 1 !
l DESCRIPTION OF CHANGE VY proposes to change the subject Technical Specifications to clarify that the NRC may grant relief from GL 88-01 requirements, and to also be less prescriptive in the manner in which the NRC may grant relief from Section XI requirements.
The proposed change is as follows:
Technical Specification 4.6.E.1 states, " Inservice inspection of piping, identified in GL 88-01, shall be performed in acemdance with the staff positions on schedule, methods, and personnel and sample expansion included in the Generic Letter." VY proposes to add a caveat to the end of that sentence, stating, "except where specific written relief has been granted by the NRC."
1 In Technical Specification 4.6.E.1 the words, " pursuant to 10CFR50, Section 50.55a(gX6Xi)" will be stricken following "except where specific written relief has been granted by the NRC."
Because the NRC has granted relief fro:n criteria inherent in both ASME Section XI and GL 88-01 by approving ASME Code Case N-560 for use at VY, it is necessary to clarify the applicability of GL 88-01 in our Technical Specifications.
Furthermore, Technical Specification 4.6.E.1 allows relief from ASME Section XI requirements to be granted by the NRC only under 50.55a(gX6Xi). It is inappropriate to reference only one paragraph from 10CFR50.55a when other paragraphs may be applicable to the granting of relief.
This proposed change will serve to clarify this stipulation as well.
REASON FOR CHANGE VY has received NRC approval to use ASME Code Case N-560 in association with inservice l inspection of Class 1, Category B-J, piping welds [see Reference (d)] under ASME Section XI. )
All of VY's ASME Category B.J piping welds are also Category A piping welds as defined in GL88-01. This Case reduces the 25% inspection sample required by be.th ASME Section XI and !
GL 88-01 to 10%, while stipulating selection of that sample in accordance with a risk-informed )
analytical methodology. The Technical Specifications specifically reference the staff positions on j schedule, methods, personnel and sample expansion in GL 88-01. Approval of Code Case N-560 j affects the sampling requirements of GL 88-01 by allowing alternative sample selection criteria i for Class 1 Category B-J (GL 88-01 Category A) piping welds.
i i
BASIS FOR CHANGE l
)
The NRC has approved the use of Code Case N-560 for VY in a S=fety Evaluation Report (SER) provided in Reference (d). The basis for the change from the .. .ME Section XI and GL 88-01 requirements are found in that SER.
BVY 9913 / Attachment I / Page 2 Draft Guide 1061, as well as Draft SRP Chapter 3.9.8 (Standard Review Plan For The Review Of Risk-Informed In-service Inspection of Piping) and Draft Regulatory Guide DG-1063 (An Approach For Plant-Specific, Risk-Informed Decision Making: Inspection of Piping), identified five principles ofrisk informed regulation. They are:
1
- 1. Meet current regulations,
- 2. Maintain defense in depth,
- 3. Maintain sufficient safety margins,
- 4. Proposed increase in risk (including cumulative effects) is small, NRC goals are not exceeded,and
- 5. Performance-based implementation and monitoring strategies.
The basis for meeting each of the above five principles is detailed in the referenced SER.
Because relief has been granted from the 25% sample inspection required by ASME Section XI, Table IWB-2500-1 for Class 1, Category B-J welds, relief has, in effect, also been granted from the identical requirement in GL 88-01 for Category A welds. The NRC has approved the !
Vermont Yankee weld selection process itself and, in addition, the actue.1 sample of welds that have been selected. Note also that, in Section 3.1 of Reference (d), the NRC concluded that: "In addition to the other Section XI activities not affected by the implementation of N560 are the augmented inspection programs, such as those made in response to Generic Letter 88-01 (NRC !
Position on IGSCC in BWR Austenitic SS Piping) and Generic Letter 89-08 (Erosion / Corrosion !
Induced Wall Thinning)."
SAFETY ASSESSMENT 2
VY has shown that implementation of the Code Case N-560 program would result m an insignificant change in risk even wid fewer inspections, since the inspections will take place where degradation mechanisms are more likely to occur, and procedures and personnel will target these specific locations using improved techniques and expanded volumes. These compensatory measures will mitigate and balance the latent risk involved in reducing the number of welds subjected to inspection. The NRC staff determined that the alternative method described in VY's submittal (ASME Code Case N-560 as augmented by EPRI TR-106706) provides equivalent or better examination criteria for Class 1 Category B-J welds than that provided by the current Section XI requirements [and by extension, GL 88-01).
Therefore, NRC staff concluded that approval of VY's proposed alternative would provide an acceptable level of quality and safety, in that the alternative provides reasonable assurance of the r*ructural integrity of the affected components. [ Relief was granted pursuant to 10 CFR 50.55a(a)(3)(i)].
The purpose of this proposed change is to refine the existing Technical Specification wording to be less prescriptive in the manner in which the NRC may grant relief from ASME Section XI requirements and, as it relates to GL 88-01, to eliminate conflict with implementation of the approved Code Case N-560 attemative methodology.
p Docket No. 50-271 BVY 99-13 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 213 Generic Letter 88-01 and Use of Code Case N-560 Determination of No Significant Hazards Consideration
)
1 i
1 L $
c 7
BVY 99-13 / Attachment 2/ Page 1 Pursuant to 10CFR50.92, VY has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since it satisfies the criteria in 10CFR50.92(c).
- 1. The operation of Vermont Y,ankee Nuclear Power Station in accordance with the oronosed -
amendment will not involve a sienificant increase in the probabilfty or conscauences of an accident oreviously evaluated?
This change is only an administrative change that recognizes the NRC's authority to grant 4 relief to a specific requirement. The pursuit of relief from the ASME code and the imposition of alternative requirements are governed by 10CFR50.55a and require NRC approval. There are several sections in the regulations under which such relief can be I granted. 'Ihe removal of reference to a specific section of CFR that may be used to grant relief has no effect on plant equipment or its operation. Adding words to allow the granting of alternatives to the GL 88-01 guidance in the TS also does not affect any equipment or its i operation. These changes can be constered administrative in nature and do not change any I of the accident ana!yses for the facility. Thus, there are no changes to.the probability or consequences of accidents previously evaluated.
- 2. The operation of Vermont Yankee Nuclear Power Station in accordance with the orooosed amendment will not create the nossibility of a new or different kind of accident from any accident oreviously evaluated.
The revision of the wording in the TS to generalize the granting of relief to the ASME code does not result in any changes to the plant equipment or its operation. Similarly, adding words to allow NRC approved alternate positions with regard to the guidance provided in GL 88-01 does not impact plant equipment or its operation. These changes are administrative in nature and do not result in the creation of any new or different kinds of accidents.
- 3. The operation of Vermont Yankee Nuclear Power Station in accordance with the orooosed amendment will not involve a sinnificant reduction in a marnin of safety.
This change is only an administrative change that revises the wording in the TS to recognize the NRC's authority to grant relief to specific requirements. The changes maintain the
. requirement for NRC approval to be obtained. These administrative changes do not result in a reduction in any margin of safety.
Vermont Yankee has also reviewed the NRC examples oflicense amendments ' considered not likely to involve significant hazards considerations as provided in the final adoption of 10CFR50.92 published in the Federal Renister (FR), Volume 51, No. 44, dated March 6,1986.
Example (i) on FR page 7751 provides a discussion of" purely administrative changes", including those proposed to achieve consistency as in the present case, which indicates that it is likely no significant hazards considerations are involved.
i
f BVY 99-13 / Attachment 2 / Page 2 -
On the basis of the above, VY has determined that operation of the facility in accordance with the proposed change does not involve a significant hazards consideration as defined in 10 CFR 50.92(c), in that it:
l 1) does not involve a significant increase in the probability or consequences of an accident l previously evaluated;
- 2) does not create the possibility of a new or different kind of accident from any previously l analyzed accident; and
- 3) does not involve a significant reduction in a margin of safety.
9 I
l l'
l s
I 9
l-l l
l-I