Text
h-e
. VERMONT YANKEE NUCLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002 m
ENGINEERING OFFICE F
$80 MAIN STREET BOLTON, M A 01740 (508)779 6711 February 5,1996 BVY 96-06 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
(a) License No. DPR-28 (Docket 50-271)
(b) Letter, VYNPC to USNRC, BVY 94-49 dated May / 2 994 i
(c) Letter, VYNPC to USNRC, BVY 94-74 dated July." 994 (d) Letter, USNRC to VYNPC, NVY 94-132, dated Augv 17,1994
Subject:
Proposed Change No.180, Administrative Change to Vermont Yankee Technical Specifications to Correct Typographical Errors and Text Inconsistencies Pursuant to Section 50.90 of the Commission's Rules and Regulations, Vermont Yankee Nuclear Power Corporation hereby proposes the following change to Appendix A of the operating license
[ Reference (a)].
Procosed Change:
. Replace the pages of the Vermont Yankee Technical Specifications listed below with the attached revised pages:
ii 38 54 74 142a 245 17 39 56 81 159 249 20 40 57 88 168 250 21 41 58 90 186 255 22 42 59 92 193 258 23 43 60 93 194 260 25a 44 61 105 195 266 27 45 62 106 198 270 29 46 63 107 202 278 33 47 64 108 206 34 49 67 118 209 35 50 69 119 233 36 51 72 140 237 37 53 73 142 244 non.
\\'
9602000073 960205 l
)
United States Nuclear Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION February 5,1996 Page 2 of 4 Changes to these pages are being proposed to correct typographical errors, textual inconsistencies, and minor errors which were identified primarily during our recent Technical Specification reformatting effort [ References (b), (c), and (d)]. In addition, a number of potential enhancements were identified :during an internal Technical Specification Evaluation we completed in 1994. Those changes identified during that evaluation which are administrative in nature are included within this proposed change. To further enhance the Technical Specifications, equipment identification numbers have been added to the Technical Specification tables in a uniform manner. A listing of the actual changes by page is attached as Enclosure A to aid in your review.
REASON FOR CHANGE:
Most of the changes in the attached listing were identified during the reformatting effort undertaken in preparing references (b), and (c); however, NRC guidance received regarding that change suggested that existing typographical errors and textual inconsistencies would be better
' addressed in a. separate. submittal following NRC approval of that change. Reference (d)-
documents NRC approval of the Vermont Yankee reformatted Technical Specifications. Since the receipt of_ that approval, we have completed a thorough review of our Technical Specifications to identify any administrative changes which could be.made to enhance. the document. ~ These changes include correction of typographical errors, minor wording changes to enhance the usability of the document, and minor corrections to remove textual inconsistencies.
To further enhance the Technical Specifications, equipment identification numbers have been added to the applicable Technical Specification tables in a uniform manner. In the past, i
equipment identification numbers were provided in only a few instances; this enhancement will l
provide this information for all applicable entries in the tables found in the Technical Specifications.
BASIS FOR CHANGE:
. These proposed changes are considered enhancements to the Technical Specifications to correct obvious errors and textual inconsistencies and to enhance usability. These changes will have no H
effect on plant hardware, plant design, safety limit setting, or plant system operation.
SAFETY CONSIDERATIONS:
The changes proposed on the attached Technical Specification pages are administrative in nature and do not impact any FSAR safety analysis or change the function of any equipment. Approval of these changes will have no effect on plant safety. The proposed change has been reviewed by the Plant Operations Review Committee and the Vermont Yankee Nuclear Safety Audit and Review Committee.
SIGNIFICANT HAZARDS CONSIDERATIONS:
.c A_
,;The standards ~ used to arrive at a determination that a request for amendment involves no significant hazards consideration are included in the Commission's regulations,10CFR50.92 l
which state that the operation of the facility in accordance with the proposed amendment would not:
-~
s e
United States Nuclear Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION February 5,1996 Page 3 of 4
).
involve a significant increase in the probability or consequences of an accident previously evaluated, 2.
create the possibility of a new or different kind of accident from any accident previously evaluated, or 3.
involve a significant reduction in a margin of safety.
The discussion below addresses the proposed changes with respect to these three criteria and demonstrates that the proposed amendment involves a no-significant-hazards consideration:
- 1. The administrative changes proposed herein will have no effect on plant hardware, plant design, safety limit setting, or plant system operation and therefore do not modify or add any initiating parameters that would significantly increase the probability or consequences of any previously analyzed accident.
- 2. These changes do not affect any equipment noc do they involve any potential initiating events that would create any new or different kind of accident. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
i
- 3. These changes do not affect any equipment involved in potential initiating events or safety limits. Therefore, it is concluded that the proposed change does not involve a significant reduction in a margin of safety.
In addition, the Commission has provided guidance for the application of the significant hazards consideration standards in 10CFR50.92 by providing certain examples (51FR7751, dated March 6,1986). An example of an action likely to involve a no significant hazards consideration is a purely administrative change to the Technical Specifications [ example (i)]: for example, a change to achieve consistency throughout the Technical Specifications, correction of an error, or a change in nomenclature. This proposed change falls within the scope of this example since it involves the correction of typographical errors, changes to achieve consistency, and minor text corrections.
Based on the above, we conclude that the proposed change does not constitute a significant hazards consideration as defined in 10CFR50.92(c).
SCHEDULE OF CHANGE-l l
The proposed change will be incorporated into Vermont Yankee Technical Specifications and implemented as soon as practicable following receipt of your approval.
We trust that the information provided adequately supports our request, however, should you have any questions regarding this matter, please do not hesitate to contact us.
.. ~
-_~
VERMONT YANKEE NUCLEAR POWER CORPORATION United States Nuclear Regulatory Commission February 5,1996 Page 4 of 4 Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
{'
i Donald A. Reid Vice President, Operations
Enclosures:
A -Change Listing B-Affected Technical Specification Pages c:
USNRC RegionI Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager-VYNPS
- 4 > SANug&'&
v 4'
r NOTARY' STATE OF VERMONT
)
{
PUBUC A
. WINDHAM COUNTY
)
4 b
Then personally appeared before me, Donald A. Reid, who, being duly sworn,
.,# te that he isg esident -
Operations, of Vermont Yankee Nuclear Power Corporation, that he is duly a iM%i"Elec and file the foregoing document in the name and on the behalf of Vermont Yankee Nuclear PoweN ' ' tion, and that the
' statements therein are true to the best of his knowledge and belief.
Sally A. Sindstrum, Notary Public My Commission expires February 10,1999-l i
i
.-i Enclosure A l
Change Listing For Administrative Tech Spec Change.
PAGE NO.
SECTION LOCATION TYPE CHANGE
' ii TABLE OF CONTENTS 3.2 correchon add 3.2.J,3.2.K and 3.2.L 1
17 Bases 2.1.H para 2, line 2 typo !
"avadable" to "avadabehty" 20
' 3.1 line 1 typo "operbility" to " operability" i
20 4.1 line 2 typo "instrumenthon" to " instrumentation" l
21 Table 3.1.1 various enhancement added equipment identification numbers 22 Table 3.1.1 heading.
enhancement
" Min. to Minimum" I
-22 Table 3.1.1 various enhancement added equipment identificahon numbers 23 Table 3.1.1 NOTES
. note 3.c typo
" lead" to " load" l
25a.
Table 4.1.1 various '.
enhancement added equipment identificahon numbers
[
27 '
Table 4.1.2 various enhancement added equipment identificahon numbers 29-Bases 3.1 '
para 6, line 12 enhancement "on FSAR Page 7.5-8" to "in FSAR Sechon 7.5.5.4"
-i 29 Bases 3.1 para 8 line 1 correction Instrumentation (pressure switches) is." to " Instrumentation is.. "
33 Bases 4.1 para 2, line 2 wn 4 Li '
"bi-stable" to " bistable" 34 3.2.A line 4 typo '
"3.5 the" to "3.5, the" l
35 3.2.G line 9 typo
" accident of abnormal" to " accident or abnormal" 35 4.2.G line 3 weWLi
" tested and calibrated" to " tested and/or cahbrated" 36 3.2.1 line 4 enhancement
" operative" to " operable" 36 -
3.2 K line 4 enhancement.
" operative" to " operable" l
36 3.2.K line 5 enhancement
" Table 3.2.8" to " Table 3.2.7" 36 4.2.K line 5 enhancement,
" Table 4.2.8" to " Table 4.2.7" ~
37-3.2.L line 8.
enhancement
" Table 3.2.9" to " Table 3.2.8"
[
37
'4.2.L line 8 enhancement -
" Table 4.2.9" to " Table 4.2.8" 38 Table 3.2.1 heading enhancement "for Operabon are Not Satisfied" to "For Operabon 'Are' Not Satisfied" 38 Table 3.2.1 various enhancement added equipment identificahon numbers 39 Table 3.2.1 heading enhancement "for Operation are Not Sahsfied" to "For Opershon Are Not Satisfied"
+
39 table 3.2.1 various
' enhancement added equipment idenhficahon numbers 40 Table 3.2.1 -
heading enhancement "for Operation are Not Satisfied" to "For Operation Are Not Satisfied" 40 Table 3.2.1 various enhancement added equipment idenhficahon numbers 7
41 Table 3.2.1 heading enhancement "for Operation are Not Satisfied" to "For Operation Are Not Satisfied" 41 Table 3.2.1 various enhancement - added equipment identificahon numbers 42 Table 3.2.1 heading enhancement
. "for Operation are Not Satisfied" to "For Operation Are Not Satisfied *
{
42 Table 3.2.1 various enhancement added equipment idenhficehon numbers
.i 43 Table 3.2.1 heading
~ enhancement
."for Operation are not Sahsfied" to "For Operation Are Not Satisfied" i
43 Table 3.2.1 various enhancement added equipment identificahon numbers Page 1 of 4..
. ~. -. -
.,._.._n a...
~
4 h
7 PAGE NO.
SECTION LOCATION
. TYPE
. CHANGE E
44-1 Table 3.2.1
. note 4 -
typo "one-out-of two" to "one-out-of-two*
({
45' Table 32.2.
. heading enhancement "for Opershon are Not Satisfied" to "For Opersbon Are Not Satisfied" 4
-45 Table 32.2 various '
enhancement added equipment identificehon numbers 46-Table 3.2.2 -
heading enhancement "for Operation are not Satisfied" to "For Operabon Are Not Satisfied" l
46 :
Table 3.2.2 various enhancement added equenent idenbfication numbers
')
47L Table 3.2.2 heading enhancement "for Operation are not Satisfied" to "For Operation Are Not Satisfied *
.i 47
. Table 3.2.2.
various enhancement added equipment identificahon numbers
- 49 Table 3.2.3 heading.
enhancement
'*for Operabon are not Met" to "For Operabon Are Not Satisfied" 49-Table 3.2.3 various enhancement added equipment idenbficahon numbers 50 Table 3.2.4 heading enhancement
" Condition for Operabon Are Not Met" to " Conditions For Operation Are Not Satisfied"
[
51 Table 3.2.5 various enhancement added equipment idenblication numbers 53 Table 3.2.6 various enhancement ' added equipment idenbficabon numbers i
54
- Table 3.2.6 Cont. H2O2 conechon
" Meter" to " Recorder"(2 places)
Monitor -
54 Table 3.2.6 various enhancement added equipment identification numbers 56 Table 3.2.7 :
Title enhancement
" TABLE 3.2.8" to TABLE 3.2.7" r
56 Table 3.2.7 various
. enhancement added equipment idenhfication numbers t
57 Table 3.2.8 Title enhancement
" TABLE 3.2.9" to TABLE 3.2.8*
f 57 Table 3.2.8 various enhancement added equipment identificabon numbers
[
58
- TABLE 3.2.8 NOTES
' heading enhancement
- TABLE 3.3.9" to " TABLE 3.2.8"
}
59 Table 42.1 vanous enhancement added note 4 to four entnes
. i-60 Table 4.2.1 various enhancement added note 4 to six entries ~
[
61 Table 4.2.1 various enhancement added note 4 to four entries 62 Table 4.2.1
' various enhancement - added note e 'o two entnes 63 Table 42.1 various enhancement moved note 4 un:ler."Funchonal Test" heading '
64 Table 4.22 various enhancement added note 4 to three entries e
67 Table 42.3 various enhancement added note 4 to two e.itries '
69 Table 4.2.5 '
various enhancement added equipment idenhfication numbers 72 Table 42.7 Title
- enhancement
" TABLE 4.2.8* to " TABLE 4.2.7" 73 -
. Table 4.2.8.
Title
' enhancement
" TABLE 42.9" to " TABLE 4.2.8"
}
74 Table 4.2 NOTES note 4 correchon note rewntten to reference Technical Specificahon Definition G.1 l
81 3.3.A.2 line 1 typo' "dnven* to " drives"
{
88 3.3.F -
- line 2 -
correction "3.3A through D* to "3.3A through E"-
l 90 Bases 3.3&4.3 4
typo
" report" to " Report */
7 92 4.4.A "2nd" 1&2
- hancement "1&2' to "384"i 93 4.4.A 3&4 enhancemes t - 3&4" to *5&6". '
I 105 3.5.D.3 line 11,16 clanficabon
" subsystem" to ' subsystem (s)"
I 105 4.5.D.3 line 7 clanfication
" subsystem" to " subsystem (s)"
[
l 3
Page 2 of 4 I
~
.....- t
PAGE NO.
SECTION LOCATION TYPE CHANGE 106 3.5.E.3 line 7 clarification
" reduced to 120 psig" to " reduced to less than 120 psig"
.107 3.5.F.3 line 7 clarification
" reduced to 100 psig" to " reduced to less than 100 psig".
107 4.5.G.1 para 2 line 8 clarification
" normal operating pressure" to " normal reactor operating pressure" 108 3.5.G.3 line 7 clarification
" reduced to 120 psig" to " reduced to less than 120 psig" 108 3.5.H.1 line 2 clarification
" standby
- to
- emergency" 108-3.5.H.1 line 9,10 clarification
" Low Pressure Core Cooling" to *LPCI and CS" 108 4.5.H.1 line 1 clarification
- standby" to " emergency" 118 3.6.B.2 line 10 typo "0.01 ppm" to *0.1 ppm" 119 3.6.B.5 line 1 typo "3.6.B.* to "3.6.B" 140 Bases 3.6 and 4.6 A para 3 line 3 typo
- CFR" to "10CFR" 140 Bases 3.6 and 4.6 B section heading correction
" Coolant Chemistry" to "B. Coolant Chemistry" 140 Bases 3.6 and 4.6 B para 1 line 4 correction "3.8.C.1a* to "3.8.E.1*
140 Bases 3.6 and 4.6 B para 2 line 4 typo
" postulate" to " postulated" 142 Bases 3.6 and 4.6 B para 1 line 5 correction "4.6.B.2" to "4.6.B.1.b" 142 Bases 3.6 and 4.6 C para 1 line 6 typo
" leakage;" to " leakage,"
142a Bases 3.6 and 4.6 E line 1 correction
" Table 4.2-4 of the FSAR" to " Table 4.2-3 of the FSAR" 159 Table 4.7.2.a line 4 typo "SG" to "SC" 168 Bases 4.7.A para 1 line 5 correction "will be" to "was" 186 Bases 3.8.D para 2 line 5 typo
" portable" to " potable" 193 Table 3.9.1 various enhancement added equipment identification numbers 194 Table 3.9.1 Notation note 5, line 6 typo "e.8.A.1" to "3.8.A.1" 195 Table 3.9.2 various enhancement added equipment identification numbers 198 Table 3.9.3 line 5 typo "meteorlogicar to meteorologicar 198 Table 3.9.3 line 10 typo.
"meteorlogicar to meteorological
- 202 Table 3.9.4 note (a), line 4 correction
- +...
1.0." to "+... < 1.0."
206 Table 4.9.2 Notation note (1)(a) typo
" indicate" to " indicates" 206 Table 4.9.2 Notation note (4), line 3 correction
" hydrogen balance nitrogen" to " hydrogen balance air" 209 Bases 3.9.C para 2 lines 10&11 correction
" Guides 4.3 (C.2.a) and 4.1 (C.2.b), Revision 1. April 1975" to " Guide 4.1 (C.2.b),
Revision 1, April 1975" 233 4.12.E line 4 typo
" control rods control celF to " control rod's control cell" 237 Bases 3.12 & 4.12.A para 2 line 6 correction.
" Specification 3.2 limits" to " Specification 3.3 limits" 244 3.13.C.1 line 2 typo "3.12.C.2* to "3.13.C.2*
245 3.13.D Title correction
" System" to " Systems" 245 3.13.D.1 line 5 correction "switchgear room" to "switchgear rooms" '
"CO System-to CO Systems-245 4.13.D Title correction 2
2 "CO System to CO Systems-245 4.13.D.1 line 1 correction 2
2 245 4.13.D.1 line 3 correction "switchgear room" to switchgear rooms" Page 3 of 4
~
PA N NO.
SECTON IJDCATION TYPE OWE 249 4.13.G.1.d para designation correction "d.*1o"c.*
250 TABLE 3.13.A.1 Item 2 enhancement dienged 1o clearly indicale the division af the switchgear room into 2 fire areas 255 6.1.D.4.c d, e, g, h Hne 1 correction
" Supervisor
- to
- Manager
- 255 6.1.D.4.e line 1 correction
- See item D.7, Page 190a* to "See item 6.1.D.7*
255 6.1 D.4.f line 1 correction
- Reactor and Computer Supervisor" to "Reector E.-@.a.19 Manager
- 258 6.2.A.1.c line 1 correction
" Engineering Support Supervisor
- to " Engineering Manager" 258 6.2.A.1.d.e, g,h,i line )
correction
" Supervisor
- to
- Manager" 258 8.2.A.1.f line1 correction
- Reactor and Computer Supervisor
- to
- Reactor Engineering Manager
- 260 6.2.b.2 line 2 correction "mambers of
- to
- members plus" 266 6.7 lines 3,4 correction
...shall be submitted to the Director of the appropriate Regional Office of inspection and Enforcement..." to *...shall be submitted to the appropriate Regional Office..."
270 6.7.A.4 41h reference correction "VYNRC to USNRC" to "VYNPC to USNRC' 278 6.14 foot note, line 2 correction
- annual
- to
- periodic" l
i Page 4 of 4 i
.