ML20209D086
Letter Sequence Request | |
---|---|
TAC:64785, (Open) | |
Administration Questions
| |
MONTHYEARML20212N0121987-03-0404 March 1987
[Table View]Proposed Tech Specs Deleting App J Leak Rate Testing Requirements for Certain Valves from Table 3.7-4 & Providing Administrative Correction to MSIV Test Pressure Requirement Project stage: Other ML20212N0011987-03-0404 March 1987 Application for Amend to License DPR-57,deleting App J Leak Rate Testing Requirements for Certain Valves from Table 3.7-4 & Providing Administrative Correction to MSIV Test Pressure Requirements.Fee Paid Project stage: Request ML20209D1181987-04-21021 April 1987 Proposed Tech Spec Table 3.7-4 Assigning Valve E11-F028A to Penetration X-211A,restoring Valves E11-F027A & B & Deleting Valves E11-F011B & F026B Project stage: Other ML20209D0861987-04-21021 April 1987 Revised Application for Amend to License DPR-57,revising Tech Spec Page 3.7-26 to Assign Valve X-211A to Penetration X-210A & Withdrawing Request to Delete Valves E11-F027A & B from Table 3.7-4 Project stage: Request ML20214T6741987-05-29029 May 1987 Environ Assessment & Finding of No Significant Impact Re Licensee 870304 Application for Amend to Tech Specs,Deleting Certain Valves from Table 3.7-4 That Lists Containment Isolation Valves Subj to Leak Rate Testing,Per 10CFR50 Project stage: Other ML20214T6401987-06-0101 June 1987 Forwards Environ Assessment & Finding of No Significant Impact Re 870304 Application to Amend License DPR-57 by Revising Tech Specs to Delete Certain Valves from Table 3.7-4 Project stage: Other 1987-04-21 |
ML20209D086 | |
Person / Time | |
---|---|
Site: | Hatch ![]() |
Issue date: | 04/21/1987 |
From: | Gucwa L GEORGIA POWER CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML20209D092 | List: |
References | |
A00L-870421, AL-870421, SL-2350, TAC-64785, NUDOCS 8704290174 | |
Download: ML20209D086 (2) | |
Similar Documents at Hatch | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error HL-2231, Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....'1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....' HL-1946, Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-091992-02-20020 February 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-09 1999-07-29 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J9351997-10-0606 October 1997 Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20137N1751997-04-0404 April 1997 Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20059E6831993-10-21021 October 1993 Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively, Relocating Procedural Details Contained in Radiological Effluent Ts,Incorporating New Part 20 & Revising Frequency of Reporting Radiological Effluent Releases HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error 1999-07-29 |
Text
Georg'a Power Company 333 Piedmont Avenue Atlanta, Georg a 30308 Televone 404 526 6526 Mai!ang Address.
Ibst Office Box 4545 Allarta Georgia 30302 b
Georgia Power L T. Gucwa "' " " " ' " ^"' % M Manager Nuclear SWty and Licens ng SL-2350 1300C X7GJ17-H600 April 21, 1987 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 PLANT HATCH UNIT 1 REQUEST TO REVISE TECHNICAL SPECIFICATIONS PRIMARY CONTAINMENT ISOLATION VALVES:
REVLSI0fLLO_P_REVIOULSWhi1IIAL Gentlemen:
Georgia Power Company's (GPC'O submittal of March 4, 1987 sought to revise Technical Specificat!cas (TS) providing primary containment isolation valve leak rate testing requirements for Plant Hatch Unit 1.
Based upon discussions with the NRC on April 2,1987, and April 6,1987, we now wish to revise the subject submittal as follows:
- 1. Proposed changed TS page 3.7-26, as provided in the subject submittal, assigned valve E11-F028A to penetration X-210A. The correct penetration for this valve should be X-211A. Proposed changed TS page 3.7-26a, as provided in the subject submittal, assigned valve E11-F028B to penetration X-2108. The correct penetration for this valve should be X-2118.
- 2. Valves E11-F027A and B were proposed to be deleted from the table. He understand that this request will not be acted upon at this time, but will be the subject of further review.
Revised TS pages 3.7-26 and 3.7-26a, incorporating the corrections noted in item I above, are hereby provided, with valves E11-F027A and B restored to the table for your convenience in preparation of the amendment for issuance.
- 3. Valves E11-F0118 and F0260 should be deleted from proposed TS page 3.7-26a. The basis for this proposed change was discussed in the March 4,1987, submittal; however, the actual change was not reflected on proposed TS page 3.7-26a. The enclosed revised page 3.7-26a correctly reflects the deletion of the subject valves U[)0 # $0t b O v
9
GeorgiaPower A U. S. Nuclear Regulatory Commission ATTN: Document Control Desk April 21, 1987 Page Two These changes are editorial in nature and do not impact the safety evaluation or determination of No Significant Hazards previously provided.
Should you have any questions or concerns, please contact this office at any time.
Sincerely, L. T. Gucwa JDH/lc
Enclosure:
Revised TS pages c: Georaia Power Comoany U.S. Nuclear Regulatory Commission Mr. J. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident GO-NORMS Inspector - Hatch Mr. L. P. Crocker, Licensing Project Manager - Hatch l